Loading…
Loading…
313 results • Best match
Strengthening and road safety of Shantipur-Meka road (NH-115) section from km 0.000 to km 19.500 of NH-115 under Jairampur Highway Division in the state of Arunachal Pradesh for the year 2022-23 (19.50 km).
Periodic renewal of Roin-Koronu-Paya section of NH-13 (old NH-52) from Km 669.80 to Km 682.396 (12.596 Km) in the state of Arunachal Padesh on EPC mode uder Annual Renewal Program (ARP) 2019-20.
C/o CC road from NH 13 to St. Xavier School at Palizi, West Kameng District.
Consultancy Services as AE for Supervision of Improvement and Widening to two lane with Paved Shoulder of NH 13 and 15 Old NH 52 from Design Km 0.000 to Design Km 24.819 length 24.819 km and ii from Design Km 24.819 to Design Km 59.885 length 35.066
Improvement of road from NH-13 (Hydel tinali) to Lilong in Changlang District Arunachal Pradesh (14.50 Km)
C/o Road from NH 13 (Rotewa) to Pakkeali via water conservation point in East Kameng District
Construction of Intermediate Lane Road with hard shoulder from design chainage Km 0.000 to Km 53.040 (Total length 53.04 km) of Tato to Manigong section on NH-913 (Frontier Highway) in State of Arunachal Pradesh on EPC mode under
Road Safety measures on Yupia -Hoj-Potin section of NH-713A from Km 9.600 to Km 30.000 and NH-13 from Km 30.000 to Km 50.000 under Ziro Highway Division in the State of Arunachal Pradesh for the year 2022-23
Annual Repair and Maintenance of Changlang_Tirap District Boundary to Khonsa of New NH-215 Length - 42.844 KM in Arunachal Pradesh
Annual Repair and Maintenance Works of NH-13 from Digaru to Demwe in the State of Arunachal Pradesh
Jungle Clearance, Earthwork Widening and Shoulder, GSB, WBM2, WBM3, Mixed Seal Surfacing, 1m Span RCC Culvert and Road Furnitures
Development of New A site RO at Palin on NH 713 Disrict Kra Daadi State of Arunachal Pradesh
CONSTRUCTION OF A SITE RO - WITHIN ZIRO URBAN JURISDICTION, NOT ON NH/SH, LOWER SUBANSIRI DISTRICT, ARUNACHAL PRADESH.
CONSTRUCTION OF A SITE RO - WITHIN NAMSING VILLAGE LIMITS NOT ON NH/SH, EAST SIANG DISTRICT, ARUNACHAL PRADESH.
Construction of double lane road from NH-15 to Tani Happa Village under Banderdewa circle Papum Pare District.
Construction of road from NH-15 to Namsai Circuit house road via Multipurpose Cultural Hall Namsai (Ph-I)
C/o Approach Road from NH-13 to Pakke Kessang District HQ. Lemmi (8.0Km) in lieu of Improvement of District Headquarters Township roads at Lemmi.
Rectification of Accident Black Spots at Sawmill Area in Pasighat (Km 542.55 to Km 543.25) on NH 515 and Yingkiong Market Area (Km 0.000 to Km 0.600 from Yingkiong) on NH 513 under Pasighat Highway Division in the State of Arunachal Pradesh
Construction of Two laning with Hard shoulder road of Ram- Mandir to Arrowa section of NH-113 from Design Km 0.000 to Km 2.910 of total length 2.755 km excluding Tidding Bridge (155 m) in the State of Arunachal Pradesh
ANNUAL REPAIR OF BORDUMSA TO NAMCHIK SECTION OF NH-215 FROM KM 0.150 TO KM 22.380 IN THE STATE OF ARUNACHAL PRADESH
Construction of A site RO Within Koronu Village Limits not on NH SH Dist Lower Dibang vally Arunachal Pradesh.
Work of slope protection NH 215, Km 21.440, km 24.690 and Km 28.295 in the state of Arunachal Pradesh
IOAOD ENGG Construction of New A Site Retail Outlet at Khonsa Town not on NH, Dist Tirap, Arunachal Pradesh
Cleaning of drain along NH-315 (NH-38) opposite Railway Siding, including RCC Tanks of the ETP at Tirap Colliery, Cleaning of Katcha Settling Tanks and Katcha Drain at Coal Stock Yard and Cleaning of the roadside drain leading to the West Mine Tikak
Road Safety measures on Papu - Yupia section of NH-713A from Km 0.000 to Km 9.600 and Hollongi - Itanagar section of NH-415 from Km 0.000 to Km 19.500 under Naharlagun Highway Division in the State of Arunachal Pradesh for the year 2022-23
Jungle Clearance, FC, CDs, R/B Walls, NFSSB, CSB, BC, Prime Coat, Track Coat, CC Drain, Road Furniture etc
C/o road from Bana HS School point on NH-13 to Wote village under Bana Circle, East Kameng District
Improvement of Palizi (NH-13) to Thrizino ADC HQ Road in West Kameng District of Arunachal Pradesh under CMCSRDP Schemes.
2-laning of Lalpul- Manmao- Changlang road NH-215 Length 68.30Km on EPC Mode in the State of Arunachal Pradesh
C/O ROAD FROM AMULI NH 313 TO ATHUNLI VIA LEYAKA PASS (21 KM) IN ARUNACHAL PRADESH UNDER NESIDS ROADS.
C/o road from CH 200 km at NH-913 to CO HQ Chhalwo in West Kameng District (CMCSRDP-II)
Construction of A Site RO - WITHIN URBAN MUNICIPAL LIMITS OF AALO, NOT ON NH SH, West Siang District, Arunachal Pradesh.
Laying of 50mm thick Mastic Asphalt on Buridihing Bridge of 2 laning from Bordumsa-Namchik (Buridihing-Jairampur) road on NH-52B (New NH-215) from km 0.15 (starting chainage near Buridihing Bridge) to km 22.380 in the State of Arunachal Pradesh.
Earthwork, GSB, WBM, PMC with Seal Coat
Strengthening of NH-215 from km 0.000 to km. 42.844 under Annual Plan for the year 2023-24 under EPC Mode
IOAOD ENGG-Construction A Site RO in location - WITHIN YOMCHA VILLAGE LIMITS NOT ON NH SH, Dist West Siang, Arunachal Pradesh
C/o. Road from Papu Nallah Bridge point of NH-415 to Papu-Yupia road at 0.700km to Sood village 2.37Kms
2-laning of Longding - Tissa - Khonsa road (NH-215) (length 42.50 Km) on EPC Mode in the State of Arunachal Pradesh
Development of NRO ON NH 515 FROM KM STONES 27 TO 29 EAST SIANG ARUNACHAL PRADESH under TINSUKIA DO PIN CODE791102
Construction of double lane road from NH 513 to New Yingkiong township via Newly proposed Heliport Upper Siang District 4 KMs
Annual Repair Maintenance of Pasighat- Mariyang- Yingkiong road Now NH - 513 from Singer River to Sijon River from 19.880 km to 43.257 km Length-23.377 km in Arunachal Pradesh
Development of New A site RO Location Within Yingkiong Town, Urban / Municipal Limits, Not on NH / SH, Upper Siang Dist. Arunachal Pradesh
1.Desiltation of storm water drainage from satyam steel factory to NH-415 upto Police Station Naka Banderderwa under ward No.20.
Annual Repairing and Maintenance of 2 laning from Pasighat to Pangin Section of NH-13 from KM 0.000 to KM 28.000 of totalLength 26.580 KM in the State of Arunachal Pradesh
Annual Repairing and Maintenance of 2 laning from Pasighat to Pangin Section of NH-13 from KM 0.000 to KM 28.000 of totalLength 26.580 KM in the State of Arunachal Pradesh
Earthwork, GSB, WBM, PMC with Seal Coat
Improvement and Widening to two lane with Paved Shoulder of NH 13 15 from Design Km 0.000 to Design Km 24.819 Brahmakund T junction to Kamlang T Junction Design Length 24.819 Km Pkg 01 in the state of Arunachal Pradesh on EPC mode.
IOAOD ENGG-Construction of Phase II Facilities of A Site RO WITHIN DARAK VILLAGE LIMITS NOT ON NH, District West Siang, Arunachal Pradesh
Construction of Bridge over River Bichom on Palizi(NH-13) to Thrizino ADC HQ Road (Span-100.0m) in West Kameng District in Arunachal Pradesh
Construction of Road from NH-713 to Nangbia Village via Kusuk Govt. Model Degree Collage and Yabang under Palin circle in Kra Daadi District