Loading…
Loading…
313 results • Best match
Road Safety measures at Km 87.824, km 90.774, and km 99.504, km 101.814 and km 112.500 of NH-513 in the State of Arunachal Pradesh under Road Safety Annual Plan 2022-23
CONSTRUCTION OF NEW A SITE RETAIL OUTLET WITH FACILITIES AT LOCATION NH-15 WITHIN 4 KM TO 7 KM FROM DIRAK GATE NAMSAI TOWARDS TEZU, DISTRICT - NAMSAI, ARUNACHAL PRADESH, PIN CODE - 792103.
Periodic repair of Raneghat and Siku Bridges on Pasighat-Mebo-Dambuk-Bomjir Road (NH-13) under Pasighat highway division in the state of Arunachal Pradesh under Annual Renewal Programme (ARP) 2021-2022.
Construction of Intermediate CC Pavement Link road from NH-515 to Tabi Diking road (L-3 Kms) in East Siang District. SH - CC Pavement, RCC drain, Box culvert, protection works and embankment.
Periodic renewal work from 650.615 km to 669.800 km of Roing-Koronu-Paya section of NH-13 (19.185 km) under Jairampur Highway Division during 2020-21 in the state of Arunachal Pradesh.
Construction Of A Site Ro On Right Hand Side Of Akajan Likabali Basar Road Within 10 Kms From Likabali Check Gate Towards Basar Not On Nh Sh Dist leparada Statearunachal Pradesh Pin791125
Chassis Core Switch with Min 6 Slots or More and with Line Cards and SUP engines Transceivers with 3 Years Warranty, 42 U Network Rack, Distribution Switch With Transceivers, Software Define Controller with VMware Software with a Rack Server, Access Switch, 09 U Network Rack, 06 U Network Rack, 12 Core Single Mode OFC Armoured, 48 Core Armoured OFC cable Laying in South Campus, HDPE Pipe, OFC LIU 24 Ports, RJ 45 Patch Panel fully loaded, Cat 6 Patch Chord 2 Mtrs, Cat 6 Patch Chord 1 Mtrs, 10 KVA Online UPS with battery 120 Minutes Back up, Armoured LC SC MM OFC Duplex Patch chord 2 mtrs, Armoured LC LC SM OFC Duplex Patch chord 2 mtrs, Armoured LC SC SM OFC Duplex Patch chord 2mtrs, Cat7 Patch Cord 10 Mtr 10G Support, Cat7 Patch Cord 5 Mtr 10G Support, Armoured LC SC MM Duplex Patch Cord 5 Mtr, Armoured LC SC SM Duplex Patch Cord 5 Mtr, Armoured LC LC MM Duplex Patch Cord 5 Mtr, Armoured LC LC SM Duplex Patch Cord 5 Mtr, CAT 6A UTP Cable 10 Gbps capability, IO boxand Back Boxand Face Plate with keystone, 2 inch PVC Capping OR casing Pipe, 1 inch PVC Capping OR casing Pipe, 1 inch and 2 inch bend OR L OR T connectors to complete the Solution OR installation, 8 Port Serial CONSOL Server ATEN SN9108C0 or Equivalent of Higher all accessories to be added, 6 Core OFC cable, Omada Pro AX5400 EAP 670 Ceiling Mount WiFi 6 Access Point, Brick chamber OR manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations, Underground OFC Laying using HDD method though HDPE pipe, Pulling of Fiber Cable through HDPE pipes, Construction of brick chamber or manhole Size 1 m x1 x1 point 5 mtr Considering all 5 Locations, OFC Splicing 24 In ET Cell plus 120 in Admin Rack plus 24 Each in 5 Buildings 24 x 5 is equal to 120 Total 264 Cores, OFC Laying RCC root or Join Indicator of Height Min 2 mtrs or more Bid Details 2/31
Multimedia Projector (MMP) (Q2)
iMac Computer
Online UPS (V2) (Q2)
REAPIRS TO VIEW CUTTER WITH CERTAIN B/R WORKS AND DIFFERENCE ASSETS OF NH (BCT ROAD) UNDER PHASE-II (C TOP, TENGA LEDGE, GOC CAMP AREA) OF AGE B/R UNDER GE TENGA
Repair and Maintenance of the road stretch from Km 521.00 to Km 550.15 from Oyan to Pasighat, NH-515 (Total length 29.15 Km) (Pkg-II and III) in the State of Arunachal Pradesh
One time improvement of bypassed section on Joram Bypass old road from km 40.200 to 46.700 Km(length-6.50km) of Potin-Pangin package-1 of NH-13 in the state of Arunachal Pradesh
Protection and mitigation of landslide and erosion of road formation from km 10.000 to km 29.500 of Holongi to Itanagar section of NH-415 on EPC mode in the state of Arunachal Pradesh.
REPAIR TO VIEW CUTTER WITH CERTAIN B/R WORKS AND DEFENCE ASSETS OF NH (BCT ROAD) UNDER PHASE-II (C TOP, TENGA LEDGE, GOC CAMP AREA) OF AGE B/R UNDER GE TENGA
Handling, Transport and Other Mining Services - Percentage quote based - Rate contract for Transportation of Pond ash from MUNPL to NHAI UPEIDA and other Govt Road projects
River training work for Digaru Bridge at Chainage 680.60 Km of NH-13 by providing permanent engineering solution for excessive meandering of Digaru river under Jairampur Highway Division in the State of Arunachal Pradesh.
Gabion Structure Pucca Side Drain Earthen Drain R B Wall Sub Grade preparation Shoulder WBM III and PMC Road Furniture etc
Construction of road from km 0.00 to km 27.430 (Package-1) of Bile- Migging section (Km 0.00 at Bile) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
DESIGN AND CONSTRUCTION/IMPROVEMENT OF BALIPARA - CHARDUAR - TAWANG ROAD FROM KM 173.240 TO KM 183.000 (DIRANG BY PASS) TO NH DOUBLE LANE SPECIFICATIONS IN THE STATE OF ARUNACHAL PRADESH (NET LENGTH 13.495 KM) THROUGH EPC MODE
One Time Improvement under Rehabilitation work of the Existing Road stretch from Demwe Km 718.840 to Brahmakund Km 742.400 Section of NH 13 Total Length 23.560 Km in the State of Arunachal Pradesh on EPC Mode
Road Safety measures on Jairampur -Pangsu pass road section of NH-315 from Km 24.000 to Km 56.485 (Length- 32.485 Km) under Jairampur Highway Division in the State of Arunachal Pradesh for the year 2022-23
Periodic renewal of Pasighat to Pangin section of NH-13 from km 28.000 to 41.303 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programmme (ARP) 2021-2022.
Periodical renewal of Pasighat-Mebo-Dambuk-Bomjir road (NH 13) from Mebo (km 564.390) to Silluk (km 583.450) (19.06 km) in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2020-2021.
Periodic renewal of Pasighat to Pangin section of NH-13 from km 28.000 to km 41.303 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Construction of road from km 17.812 to km 55.377 (Package-2) of Bile- Migging section (km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
Road Safety measures on Pasighat- Sijhon- Gobuk- Yingkiong road section from Km 43.230 to Km 117.704 of NH-513 (length- 74.47 km) under Pasighat Highway Division in the State of Arunachal Pradesh for the year 2022-23
Construction of road from km 0.000 to km 17.812 (Package-3) of Bile- Migging section (Km 0.00 at Migging end) of NH-913 (Frontier Highway) to Intermediate Lane on EPC mode in the State of Arunachal Pradesh
REAPIRS TO VIEW CUTTER WITH CERTAIN B/R WORKS AND DIFFERENCE ASSETS OF NH (BCT ROAD) UNDER PHASE-III (U AND L DAHUNG, DUM DUM NALLA, MH, MRS OFFICES AND MESSES) OF AGE B/R UNDER GE TENGA
REPAIR TO VIEW CUTTER WITH CERTAIN B/R WORKS AND DEFENCE ASSETS OF NH (BCT ROAD) UNDER PHASE-III (U AND L DAHUNG, DUM DUM NALLA, MH, MRS OFFICES AND MESSES) OF AGE B/R UNDER GE TENGA
IE services during Operation and maintenance stage for 2 laning from Nechipu-Hoj via Seppa, Khodaso, Sagalee (part of Trans-Arunachal Highway) on NH-229 in Arunachal pradesh under Arunachal Pradesh package of SARDP-NE on BOT (Annuity Basis).
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 206.66 to Km 247.05 (Package-6) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 314.25 to Km 351.383(Package-9) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 284.92 to Km 314.25 (Package-8)on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 (Package 5) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
SUPPLY AND STACKING OF SAND FOR PERMANENT WORKS AT WORK SITE BETWEEN MANDELA DEBRABU NAGA GG FROM KM 20.000 TO KM 39.000 (NET LENGTH 13.320 KMS) TO NH DOUBLE LANE SPECIFICATION UNDER 97 RCC/14 BRTF PROJECT VARTAK IN ARUNACHAL PRADESH
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 117.56to Km 163.59 (Package-4) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Rectification of Accident Black Spots at Lekhi Village (Km 46.300 to Km 46.870), Bage Tinali (Km 48.500 to Km 49.500), New Galaxy Academy (Km 49.820 to Km 50.700) and Banderdewa (Km 58.900 to Km 59.170) on NH 415 in Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-B, Design chainage from Km 117.560 to Km 247.050) on EPC Mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-C, Design chainage from Km 247.050 to Km 351.383) on EPC Mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-A, Design chainage from Km 0.000 to Km 117.560) on EPC Mode in the State of Arunachal Pradesh under Arunach
GSB WBM PMC with seal coat CD Protection work and side drain etc
Construction of Intermediate Lane Road with hard Shoulder from design Km 0.000 to Km 13.080 Total length 13.080 km of Tuting Zido section on NH913 FH
GSB CTB MSS Protection Work CDs and road furniture
Consultancy Services as AE for Supervision of Construction of Intermediate Lane Road with Hard Shoulder i. from Design Ch. 0.000 to Ch. 17.387 Length 17.387 Km of Hunli to Ithun Bridge section and ii. from Design Ch. 0.00 to Ch. 53.00 Length 53.00 Km
Consultancy Services for Authority Engineer for Supervision of 4-Laning of Itanagar to Banderdewa section of NH-415 from km 40.430 to km 51.735 (Package-B) and Km 51.700 to Km 59.199 (Package-C) on EPC Mode in the state of Arunachal Pradesh
1.Improvement of Drainage System with slab cover from NH-415 to Helipad, Ward No.17,Naharlagun, 2.C/o Drainage System both side from Transformer Point to helipad, 3.C/o Drainage System Improvement/ Repairing at Dokum Colony,4 . Improvement of Draina
1.Co 2 Nos Borewell at Ward No.18, Naharlagun SH at Residence of Gungming phassang and Near Indian Bank , 2.Drain Desiltation and clearance Work at various location of A Sector along the NH 415 and Sector Road under Ward. 18, Naharlagun.
CONSTRUCTION OF FACILITIES AT A SITE RO - ON NH-215, WITHIN 5 KM FROM INTERSECTION OF JAGUN MIAO ROAD AND NH-215 (KHARSANG CHARALI) TOWARDS MANMAO, ARUNACHAL PRADESH.