Loading…
Loading…
313 results • Best match
RCC Slab Culvert, Pucca Side Drain, Earthen Drain, R/B/Wall, Sub Grade preparation Shoulder GSB WBM III and PMC Road Furniture etc
Consultancy Services as AE for Supervision of Consultancy Services as Authority Engineer for Supervision of Construction of Intermediate Lane Road with Hard Shoulder from Design Ch. 0.00 to Ch. 53.04 Total Design Length 53.04 Km of Tato to Manigong
Construction of Intermediate Lane of Pango to Jorging Road from Design Km 40.000 to Design Km 82.060 section of frontier Highway NH913 Design Length 42.06 Km, Pkg_II, Greenfield Alignment
SB, CTB, MSS, Protection works, CDs, Side drain and road furniture
CONSTRUCTION OF 2 LANE 386 MTR LONG EXTRADOSED BRIDGE OVER RIVER SIANG AT DESIGN KM 2PT908 AND 63PT50 MTR SPAN MAJOR BRIDGE AT DESIGN KM 2PT590 IN BETWEEN KM 118.8 JUNCTION OF NH 513 WITH YINGKIONG TO MOYING VILLAGE JUNCTION AT KM 93.50 ON DDM RD
Construction of two lane with hard shoulders of Demwe-Brahmkund section of NH-13 from Ch 0.000 Km to 18.464 in the state of Arunachal Pradesh on EPC Mode under NH(O)NE
Procurement of items for Electrical Engineering Department
computer and accesories
AMC of 3 Years OEM extended warranty for Server and
Computer for ECE Department
COMPUTER
Road Works, Culverts and Protection Works
Development of new A Site Retail Outlet at Kanubari on NH, Dist Longding, Aruncahal Pradesh
Upgradation of existing road
Earth work, GSB, CTB, MSS, Setting Out and etc.
Earth work, GSB, CTB, MSS, Setting out and etc.
TENDER: ENGG/NRO BAGE TINIALI 05.12.2024 To, All Vendors as per enclosed list Dear Sir, SUBJECT: CONSTRUCTION OF NEW RETAIL OUTLET AT FROM BAGE TINIALI TOWARDS DOIMUKH ON RHS (NOT ON NH/SH) DISTT PAPUMPARE, ARUNACHAL PRADESH UNDER GUWAHATI RETAIL TERRITORY. It is proposed to Construct New Retail Outlet at subject location . Necessary approval from various appropriate authorities are being obtained and work can be commenced immediately after issue of LOI as per direction of Engineer in charge. In order to execute the above job on priority basis, we are inviting competitive quotations from you for various service items to be executed. Specifications for each item shall be SOR specification corresponding to the service no. given. The contractors are requested to visit the site and acquaint themselves with all site conditions and no claim of any nature due to site constraints will be entertained in respect of time and cost overrun. The address of the outlet is as under: VILLAGE: NIRJULI-1 LPC NO: DC/LM/LPC-58/05 DATED. 22/06/2005 PS: NIRJULI, PO: NIRJULI, DISTT. PAPUMPARE, ARUNACHAL PRADESH For any further clarifications, you may contact Md faiyaz Alam (Senior Manager Engg Retail, North East) on his Cell no. 9771487359 span lang="EN-US" style="mso-bidi-font-siz ok
Foundation, Sub structure, Super Structure Approach Road, Protection works etc
Road works
Consultancy Services for AE for Supervision of (i) Construction of Arrowa-Khupa-Hayuliang Section of NH - 113 from Ch 68.550 Km to 91.633 (ii) Construction of two lane of Demwe-Brahmkund of NH-13 from Ch 0.000 to 18.464 Km in Arunachal Pradesh
REPAIR AND MAINTAINANCE OF ROAD FROM ARROWA TRI JUNCTION TO TIDDING OF NH 113 IN THE STATE OF ARUNACHAL PRADESH
Earthwork, Sub-Grade, Sub base, Base, Wearing coarse, CD
ANNUAL ORDINARY REPAIR OF MAHADEVPUR-BURIDIHING SECTION OF NH-215 FROM KM 0.000 TO KM 25.135 IN THE STATE OF ARUNACHAL PRADESH
DEVELOPMENT OF NEW A SITE RETAIL OUTLET LOCATION WITHIN HARI VILLAGE LIMITS, NOT ON NH/SH UNDER NORTH LAKHIMPUR RSA, ARUNACHAL PRADESH.
DEVELOPMENT OF NRO - WITHIN KATAN VILLAGE LIMITS NOT ON NH/SH, FOR CONSTRUCTION OF A SITE RO - 25M X 25M - HILLS - TINSUKIA DO.
1.Jungle Clearance 2.Earthwork 3.Pavement 4.Cross Drainage Work 5.Protection Work 6. CC Drain 7. Road Furniture
Annual Repair and Maintenance Works of Tezu-Hayuliang Section of NH-113 from Arrowa Tri-Junction to Tidding Bridge in the State of Arunachal Pradesh
Development of new A site Retail Outlet WITHIN 3KMS FROM NIRJULI POLICE STATION TOWARDS BANDERDEWA ON NH 415, Village NIRJULI Dist PAPUM PARE ARUNACHAL PRADESH
CONSTRUCTION OF PHASE II FACILITIES OF A SITE RO - AT LOCATION - ON NH-515, FROM PASIGHAT ENTRY CHECK GATE TO PASIGHAT POLICE STATION, ARUNACHAL PRADESH.
DEVELOPMENT OF NEW A SITE RETAIL OUTLET LOCATION - ON NH - 713, FROM PALIN RIVER BRIDGE TO SUB-STATION PALIN, KRA DAADI, ARUNACHAL PRADESH UNDER TINSUKIA DO.
DEVELOPMENT OF NEW A SITE RETAIL OUTLET AT BETWEEN KM STONE 321 TO KM STONE NUMBER 323 ON NH- 13, VILLAGE - TATATARA, DISTRICT - EAST KAMENG, ARUNACHAL PRADESH.
Construction of Major bridge at Design Ch. 28.200 of Hunli-Anini Road NH 313 in the State of Arunachal Pradesh on EPC Mode under SARDP (2nd Call)
Construction of Intermediate Lane Road with hard Shoulder from design Km 0.000 to Km 17.387 Total length 17.387 km of Hunli Ithun Bridge section on NH 913 Frontier Highway
The tender bidding is open for six days. OK. ok
Repair and Maintenance Tezu-Hayuliang Road from km 65.08 (Near Arrowa tri-junction) to km 96.00 (Near Swami Camp/Khupa)section of NH-113 in the state of Arunachal Pradesh
High End Desktop Computer (Q2) (3 (3 ))
IOAOD ENGG-Development of new A site Retail Outlet at NEW RO AT BETWEEN KM STONE 418 AND KM STONE 420 ON NH-13, Village KHEMLEE, Dist PAPUM PARE, ARUNACHAL PRADESH
Construction of two lane with hard shoulders of Arrowa-Khupa-Hayuliang Section from Ch 68.550 Km to 91.633 in the state of Arunachal Pradesh on EPC Mode under NH(O)-NE
Bridge Foundation, Substructures Superstructures
Propeller Test or Thrust Stand, GNSS modules for UAV mapping, Survey-grade GNSS Receiver, Multi-band GNSS Antenna, Hot-shoe Event Adapter, Digital Video Transmission System, GNSS-Mag Module, VTOL Airframe PNP, Quadcopter Training Kit, Quadcopter Survey Kit, Hexacopter Training Kit, Flight controller combo kit, Combo kit, Connectors, Multispectral Camera, Interchangeable lens camera, Small VTOL PNP Kit
Construction of Balance Work of 2 Lane with Paved Shoulders of Joram- Koloriang road (NH 713) on EPC basis from existing Km 138.00 to Km 158.000 (Design Km 122.353 to Km 138.389 in the State of Arunachal Pradesh
Consultancy Services as AE for Supervision of Widening/Improvement of NH-515 to 4 (Four) Lane with Paved Shoulder from km (Kandulijan Gaon) to (Oyan) in the State of Assam and Arunachal Pradesh on EPC mode (Package-1,2, 3)
Maintenance Repair of various sections of existing road from Km 70 700 to Km 78 200 of Vaghmun Simlung section of NH 44A in the state of Tripura FY 2023 24 on percentage rate basis (Risk Cost) (3rd Call)
Consultancy Services as AE for Supervision of construction of IL with HS of Hunli to Hayuliang (Pkg-III) from design Km 60 to Km 121.500 (Design Length 61.500 km, Greenfield) Section of NH-913, in the state of Arunachal Pradesh.
Construction of Balance work of Two - Lane with hard shoulders of Existing Hayuliang - Hawai Road (NH-113) from design km 51.825 to km 63.131 on EPC basis in the state of Arunachal Pradesh Package of SARDP - NE (Green Field Alignment)
Ordinary Repair of NH 08 from Udaipur to Melaghar Km. 0.00 to Km. 20.300 and Km. 22.00 to km.23.000 Total Length 21.300 Km in the state of Tripura in the year 2023-24 on percentage basis work order basis.
Maintenance Improvement Work of 2 Lane with paved shoulder of Joram Koloriang road NH 713 on EPC basis from design chainage Km. 59.363 to Km 77.363 Existing Km. 70.000 to Km 88.700 in the state of Arunachal Pradesh Percentage Rate and Work Order
Maintenance Improvement Work of 2 Lane with paved shoulder of Joram Koloriang road NH 713 on EPC basis from design chainage Km. 92.363 to Km 107.363 Existing Km. 104.850 to Km 122.600 in the state of Arunachal Pradesh Percentage Rate and Work Order
Maintenance Improvement Work of 2 Lane with paved shoulder of Joram Koloriang road NH 713 on EPC basis from design chainage Km. 77.363 to Km 92.363 Existing Km. 88.700 to Km 104.850 in the state of Arunachal Pradesh Percentage Rate and Work Order
All in One PC (Q2)