Loading…
Loading…
2,161 results • Best match
Shifting of 11 KV and LT line at Changsari Nathgaon From NH 27 to Changsari Sesa Road via Nath Gaon due to Road widening and construction of a new drainage system under SOPD G for the year 2024 25
MMNPPNA_23_24_100 Strengthening and Widening of Road from NH-27 at Highway Chowk to Rangia College Road (CH 0.00M to CH 740.00M) as Gaurab Path under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the year 2023-24, Rangia MB
MMNPPNA_23_24_75 Improvement of road from NH-15 to Natya Mandir Path connecting Kachari Maidan as Gaurav Path Ch 0.00 km to Ch-880.00 m under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the year 2023-24, Mangaldoi MB
MMUPPNA_RIDF_XXIX_23_24_17 (i) Upgradation of Salkocha Bir Chilaray Status to Bashbari Market (From Ch. 0.00km to Ch. 5.00km), (ii) Construction of road from Sonamukhi Bazar (NH 31) to No. 2203 Masaner Alga L.P School (from Ch. 0.00m to Ch. 5000.00m)
Construction of Foundation and Substructure of a Temporary Bridge along with its approaches on river Kaliyani near existing Bridge No 8/3 on NH-39 for movement of over dimension-consignment (ODC), over weight consignment (OWC) for Numaligarh Refinery
MMNPPNA_23_24_173 (i)Construction of Block road to NH-115 via Milan Nagar road, (ii)Construction of Thana Chariali to Pub Lachit Nagar via Forest Office under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the year 2023-24, Chapakhowa
RIDF-XXVI/Tinsukia/04 Improvement of Road from Dhadum Megela (Ch.709.65Km of NH-37) to Borpathar under RIDF-XXVI of NABARD under Tinsukia, Doomdooma, Sadia Territorial Road Division under scheme for the year 2020-21 in Sadia LAC
SOPD_G_20_21_129 Construction of road from (i) BBPJ road to Lohajani to Namadaspara village (ii) 1st Km of Golakganj Soulmari Balabari road (iii) Purni to Harirhat (Balance portion) (iv) NH-31 to Kaldoba-III (Box Cell Culvert) (v) Golakganj Kachukhan
SOPD_G_20_21_111 Construction Improvement of the roads (1) Dhepajan Katayanigaon to Tetelital (L1.80 km), (2) Nagaon Dakhinpat Kampur road (SH-18) to Nonoi Dakhinpat road (NGM-1) via Bechamari village (L510 m), (3) NH-37 to Mahurati (L1.00 km) (4)
SOPD_G_25_26_39 (1) Strengthening and widening of road from Rangirkhari point to Shib Colony (2) Restoration of damaged ICBP surface of Road from Chirukandi point- Ramnagar (NH-37 to C.R. Avenue point) (3) Strengthening of wearing coat repairing of R
NRL_DEPOSIT_25_26_01 Construction of road from NRL Material Gate to NH-39( near Tanker stand) and strengthening of Letekujan Hospital road and extension of Pragati Dwr road upto Letekujan Factory for the year 2025-26 under Golaghat and Khumtai Territ
Construction of 2 Nos. of RCC Box Cell Bridge including approach road NH-31C to Taplajhora Ch.0.00m to Ch.600.00m by providing ICBP under CMs Goodwill Mission Project RIDF-XXXI for the year 2025-26. TN_67KOK_RIDF-XXXI-15
SOPD_G_20_21_152 Construction of road from (1) Barhula to Teliaati gaon (L0.60 km), (2) NH-36 (near Rangoloo L.P School to Kondoli connecting road at NIZ Kathiatoli (L0.80 km), (3) K.K road Buklung Gaon (L0.700 km), (4) Uriagaon Karayani Hengulich
SOPD_G_20_21_167 Construction/Re-construction of (1) Juria Namghar to VIP Road (2) Makum Delakhat road (Chandmari Tiniali to NH-37 Tinsukia Bye-Pass (3) Balugada road (4) Gellapukhuri Guijan road (Near Borguri GP Office) (5) Longkeswar Gohain Nagar r
MMPPNA_RIDF_XXXI_25_26_157 Construction of road from (1) Kakoijana Nayapara Lakhmi Mandir to K. K. Road via L.P. School, (2) NH-17 Sidalsuti LP School to Sedapara Shiv Mandir and (3) Sidalsati Bazar Khorapara Hill Side under Mukhya Mantrir Paki Path
High Voltage HRC Fuse Din Type 25 Amp., 1000 Volt, AC, Size NH 00 C, Breaking Capacity 25 KA, Confirming to IS:13703/IEC 269.2 Suitable for Switch Board Cabinet of Non AC LHB Coaches, as per SIBA Part
MMPNA/2022-23/43 Periodic Renewal of Road from Bongaon to Namoni Bahupathar (Bohupather Ali) Part-1,Rowdua to Rowduar Pathar ( Rowduar Pathar Ali), from NH-37 to Nahorjan Ali (Mohmaikigaon Ali) under MMPNA under Bokakhat LAC for 2022-23
CONSTRUCTION OF NEW A SITE RO WITH FACILITIES LIKE SALES BUILDING CANOPY PAVER BLOCK DRIVEWAY AND OTHER ALLIED CIVIL ELECTRICAL WORKS ON NH 29 WITHIN 6KM FROM LANGHERANG ENGLISH LP SCHOOL TOWARDS MANJA DIST KARBI ANGLONG ASSAM UNDER TINUKIA DO IOAOD
Four laning from Biswanath Chariali by-pass (Km 208.00 to Gohpur Km 265.50 (Total length 57.50) in the state of Assam on EPC basis
ok. ok
DEVELOPMENT OF NEW A SITE RETAIL OUTLET - ON NH 115 WITHIN 10 KMS FROM ARUNACHAL PRADESH BORDER TOWARDS INTERSECTION WITH NH-13, ARUNACHAL PRADESH.
AS19722 MRL13-NH 36 to Kechaali Muslimgaon via Bhotaiati
AS06570 MRL01-NH 37 Hatiali to Bindhakata Via Bogoritolia
AS15612 MRL03-NH-15 at Laluk to Kachajuli Road
AS09087 MRL01-50th KM of NH 6 to Ramchandi
AS22674 T01-Road from NH-37(A) to Alisinga
AS16202 MRL10-NH 15 to Kowaripukhuri via Bhut Pukhuri
AS12462 MRL16-Road from NH-36 to Samuguri Dispensary
Re-construction of Road from NH-37 to Diffolopothar
Construction of Road from NH-37 to Bhokot Chapori
Periodic Renewal of (A) NH-31 to BB Road (B) NH-31 to Haripur village Road, Bhawanipur Barpeta Road (SH) , Sarupeta Barpeta Road,Sukmanah Galia Road , Uttar Fehurakhowa to Pachim Fehurakhowa ,Rampur to Santradoha and NH-31 to Kalitapara(Chakchaka Bl
Providing, Installation of Road Safety Measures by fixing of Traffic Sign Board , Road marking under MnR Head for FY-23-24 (i.) On NH-37under Cachar-Hailakandi District (ii.) On NH-306under Cachar District (iii.) On NH-37-08 under Karimganj
MMPNA/2022-23/195 Periodic Renewal of NH 15 Bamgaon to Railway crossing(PMGSY), Chola Basti to Chola gaon(PMGSY), NH 52(New NH 15) to Dighali gaon(PMGSY), Ghoramari buragaon to NH52, Monijarani to Borghop(Borghop to Nepalipam) under MMPNA
Construction of new 11 KV and LT composite line due to widening of road from No2 Gharphalia near NH-37 to Phukanorkhat (both sides of the road) connecting Majuli Bridge on the South Bank of the Brahmaputra River against Deposit Work Scheme
Improvement/Strengthening of road from 537th Km of NH-37 to Proposed Group Gathering Station (G.G.S.) at Lakwa Gaon (Length 1.0Km), Demow under OIL Deposit Scheme for the year 2022-23 under PWRD, Sivasagar and Thowra Territorial Road Division under T
Improvement of NH-37 within Dibrugarh Town,by providing (i) Ornamental Hand Rails at the edge of Existing Footpath,(ii) Providing Precast Double Kerb Stone at edge of Existing Footpaths,(iii) Providing Coloured Anti Skid Paver Tiles on Footpaths,(iv)
MMNPPNA_23_24_277 (i) Strengthening of Lohari Patty Road (ii) Construction of drain of Makum Thana Road (iii) Strengthening of NH 37 BYPASS TO 12 NO LINE Road and (iv) Construcation of drain of Brain Gogai Path under Mukhya Mantrir Nagariya Pakipath
Road Safety measures on various lower hierarchy roads at junctions with higher hierarchy road (NH-37) Part-A under Sivasagar LAC under PWRD Sivasagar and Thowra Territorial Road Division, Sivasagar for the year 2023-24 under 966 Road safety works, Si
MMPNA/2022-23/116 Periodic Renewal of NH-715 to Jagiroad Kishore Club road,Bebejia Habi to Hariabori road Part 1,Ghuramarajan to Ghuramarajaan pam Road, 1 No. Burgaon to Katahguri Road under Mukhya Mantrir Path Nabikaran Aachani under Jagiroad LAC
MMPPNA_22_23_317 Construction of road from (i) NH 15 to Bhalukmari Baptist Church from Ch. 0.00m to Ch. 2310.00m, (ii) Rowta Station to Rowta Shiv Mandir from Ch. 0.00m to Ch. 620.00m, (iii) Gerubari Tiniali to Gerubari South Chuba from Ch. 0.00m
MMPPNA_22_23_304 Construction of road from (i) Tipong Gate to NH-153 via Nepali Gaon, (ii) Jagun Bishnupur to Lakla tinkupani Via Tinku Pather including routine maintenance for 4 (four) years under Mukhya Mantrir Paki Path Nirman Achani for the year
MMPPNA_23_24_191, Construction of road from (i) SH-22 to Baliyoni Gaon Road (Ch 0.00 m to 1200.00 m) and (ii) NH-15 to Thekeraguri (Ch 0.00 m to 2600.00 m) under Mukhya Mantrir Pakipath Nirman Achani for the year 2023-24
MMPPNA_RIDF_XXXI_25_26_360 Construction of (i) SS Road to Motilongmailai village Road (ii) Diduki-Il to Diduki -1 Road (iii) NH-54 to Thoinagar Road under Mukhya Mantrir Paki Path Nirman Achani under RIDF-XXXI of NABARD for the year 2025-26.
Reconstruction of pavement (Length-17.984 km) of the newly declared NH-315A (from Jeypore to Hukanjuri) in the State of Assam under Annual Plan for the year 2021-22 on EPC mode (Job No. 315A/AS/2021-22/226)(Retender)
MMPNA/2023-24/129_Periodic Renewal of road from Laimekuri Nari Road (MDR) from ch 1950.00m to 2450.00m , Mohmara to Rikbi and NH-52 to Milonpur road (PMGSY) under MUKHYA MANTRI PATH NABIKARAN AACHANI for the year 2023-24 under Jonai LAC
SOPD_G_24_25_21 Construction of Moinapara Athaichuk to Gumnadi Pratapgarh via Kolarichuk Rongpuria including NH 15 Boginadi to No 2 Tariyani Jengrai Garam Bazar Road (Part 2- (1) Rongpuria to Arunachal via Lalpani from Ch-0.00 m to 2690.00 m, (2) Bej
MMPPNA_22_23_240 Construction of road from (i) Monipurisheet PWD road to Jamira Part-I, (ii) Sultani Bazar PWD Road to Nirbirtuk at Paloicherra, (iii) Dinanathpur PWD to Ruparthal via Nunkuli, (iv) NH-6 at Jamira Pt-I to Bokthal via Sahajahan Road
SOPD_G_20_21_228 Construction of road by ICBP (1) Dhupabar Satra road, (2) 3rd Km Borangabari Kalyani Mandir road to Napamua (including 3 cell Box Culvert), (3) Jalukbari Itapara road, (4) NH-15 to Rangalial SC village Road, (5) Kanaklata Path to Dor
Construction of Kadamoni to NH-37 link Road From Ch. 0.00 m to Ch. 467.00 m of Municipal area under SOPD G for the Year 2020-21 under PWRD, Dibrugarh, Lahowal, Moran and Tingkhong Territorial Road Division, Dibrugarh - Dibrugarh LAC.
MMNPPNA_23_24_244 (i)Construction of road from PWD Road to Partha P Das House, (ii)Construction of road from AB-NH to Dhruba Rabha House via Kalpana Chawla Academy, (iii)Construction of road from Agriculture road (Swami Vivekananda Path) to Tapash Bh