Loading…
Loading…
2,161 results • Best match
Avenue Plantation / Median Plantation (Advance field preparation, planting and maintenance) works along on AS-06, Chainage from km 1065- km 1057 section of NH31 under PIU Guwahati, Regional Office Guwahati in the state of Assam Guwahati
Manpower Outsourcing Services - Minimum wage - Skilled; Graduate; Admin
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Others
FOR LIDAR DATA PROCESSING SOFTWARE
Fixed Computer Workstation (Q2) (3 (3 ))
Server (Q2) (3 (3 ))
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Secur
Goods Transport Services - Per MT - stone; Open Body Taurus; 23 FT Truck
Hiring of Sanitation Service - Sweeper; 6; All Areas; All Areas; Daily; 2
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation 24*7
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation 24*7
Manpower Outsourcing Services - Minimum wage - Highly- Skilled; Graduate; Non-IT Technical
Manpower Outsourcing Services - Minimum wage - Unskilled; High School; Admin
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Hiring of Professionals for Cloud, Network and Security - Data Centre related roles; System Administrator; 1 year and Less than 3 years
Manpower Outsourcing Services - Minimum wage - Skilled; High School; Others
Road Safety measures on Meka-Roing-Hunli road section from Km 0.000 to Km 19.824 of NH-313 regarding rectification of accidents spots under BRO Project Udayak in the State of Arunachal Pradesh for the year 2023-24
SOPD_G_24_25_23 Construction of Moinapara Athaichuk to Gumnadi Pratapgarh via Kolarichuk Rongpuria including NH 15 Boginadi to No2 Tariyani Jengrai Garam Bazar Road (Part 4- (1)Sensuwa Pathar to Ghulichuk Railway line (from Ch 0.00 m to Ch 2100.00 m)
MMPPNA_RIDF_XXXI_25_26_79 Construction of road from (1) Missa Bazar to Bhuyapatty, (2) NH-37 Gatanga to Sinior Secondary School, (3) Babu Club to SA Road via Hospital Line, (4) Amlokie to Simonabosti Road under Mukhya Mantrir Paki Path Nirman Achani
MMNPPNA_23_24_211 Strengthening and widening of Road from NH-6 at Chandrapur Pt-I to Sarbanandapur via Lala Town (from Ch. 2000.00m to 2250.00m) for Gaurab Path under Mukhya Mantrir Nagariya Pakipath Nirman Achani (MMNPPNA) for the year 2023-24,
MMPPNA_23_24_307 (1)Construction of Road from Kanaibazar Eraligool PWD road to Anipur PWD road via Chararpar, (2)Construction of road from Kayasthagram to South Kanakpur via Dauribari, (3)Construction of road from Nh-8 at baroigram to eraligool PWD
SOPD_G_24_25_26 (i) Construction of Earthen Roads inside the Bhattadev Khetra,(ii) Construction of Helipad, Barricade and Approach Roads for proposed Helipad (iii) Construction of Old NT Link Road ,(iv) Construction of Road from MRL 20 (NH 31 at Bir
MMUPPNA_RIDF_XXIX_23_24_21 Improvement of (i) Dhaligaon to New Bongaigaon Road (1941) continued to Bhakaribhita to HS-2 Road (12389), (ii) Bageswari Temple to NH-31 C under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NABARD for th
MMPPNA_22_23_137 Construction of road from (i) Anandabag TE to gangabari Road Part.1, (ii) Oxford school to Aosmiya Balijan Connecting road, (iii) Anandabag TE to Gangabari (Anandabag TE(NH 38) to Naharani), (iv) Naharani Gaon to By pass Connecting
MMUPPNA_RIDF_XXIX_23_24_46 Improvement of (i) Balijan Lowguti Road (Ch. 0.00m to 5000.00m), (ii) road from NH-15 to Amdoiguri (Ch. 5000.00m to 10000.00m) under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NABARD for the year 2023-2
SOPD_G_21_22_24 Widening and Strengthening of Gohain Ali from NH-37 at Badulipar to starting point of approach road for Anchillary project of NRL expansion at Dabidubi Govt. land via Atmaram Gogoi Ali under Bokakhat Territorial Road Division under SO
MMPPNA_22_23_124 Construction of road from (i) Jamalpur PMGSY Road to Purbo Dulalgram, (ii) Dholai Gurudayalpur PMGSY Rd to Gurudayal Khasia Punji, (iii) NH-54 to Sitakundu School via Panibora GP Office (Ch0.00 m to Ch2070.00 m), (iv) Nutan Bazar
Improvement of 1 No. Chengeli Gaon L.P. School to Chirotia Gaon Connecting Road, NH-37 to 1 No. Chengeli Gaon Road, Subhadra Pathak Path, Sundarpur Path (Kotoky Chuk)and (v) Somnoy Path by GWC under SOPD_G for 2025-26
Improvement of road from Gurubhasha Bazar to NH-31 C from Ch.0.00 Km to 2.00 Km (Length 2.00 Km) under AOP, BTC for the year 2022-23 of Chirang District, Assam. (LAC-31st Sidli ST) PKG NO.16_5
SOPD_TSP_21_22_01 Construction of road from NH-15 at Rupahi Borgarah to Jalakia Suti Road under SOPD-TSP for the year 2021-22 under Jonai Territorial Road Division, Silapathar at Jonai (ST) LAC in Dhemaji District (length of Road 2.130Km)
MMPPNA_RIDF_XXXI_25_26_447 Improvement of (1) road start from NH-06 to Pathortilla at Aynakhal (2) Road from Chakma Bazar Point to Amala Nalubak PWD via Rawarkhal (Rajyeshwarpur Pt-I and Purbo Kittarbond Ch. 0.00m to 2500.00m) under Mukhya Mantrir Pa
RIDF-XXVII/ Darrang/01 Construction of road from (1) Hirapara to Samala via Patidarrang, Kharkhowa Para (2) NH-15 to Sirakhowapara village (3) Matia Gohaighat Randhani satra road (4) Bherua RCC Bridge Uttar Bherua Lathapara connecting road (5) L.K.
Improvement of NH-38 to Makum Bypass via Line No. 23 road of Digboi LAC under SOPD-G for the year 2019-20 under Digboi Territorial Sub Division-under PWD, Digboi and Margherita Territorial Road Division, Margherita-Digboi LAC.
MMUPPNA_RIDF_XXX_24_25_41 i) Improvement of Road from NT Ramfalbil to Serfanguri from (Ch.0.00m to Ch. 1800.00) and ii) Upgradation of road from NH-31C Serfanguri to Hell Bridge (Mwinaguri village) from Ch. 0.00 to 6.25km under Mukhya Mantrir Unnoto
Improvement of Road from 1)Gojai Than Road to Ratul Sonowal House Road 2)NH-115 Road to Dangari Khal Chuk Gaon Road 3)Lawpati Anirekha Borah House to Alubari Road 4)Sarudhadum PWD Road to Bordhadum LP School
MMPPNA_23_24_120, Construction of road from 7 No. Santipur Sunrise Public School to Ganesh Pathsala via Sapnajoti Khelpathar, 2.Construction of Road from NH-115 to 4 No Shantipur Napali Gaon via 5No Santipur High School under Mukhya Mantrir Pakipath
MMPPNA_23_24_165 (1)Construction of Road from Bheluwadanga to Aita Centre Road, (2)Construction of Road from NH-15 at Buroighat to Baligaon Connecting Road via Lohia LP School, (3)Construction of Road from Rangchali Doloni Durga Mandir to Rangchali
PMC for GI with widening to 2 lane with PS from end of proposed Barpeta Bypass to Amingaon passing through important locations of Amingaon, Dodora, Singimari, Hajo, Mukalmua, Rampur, Doulashal, Barpeta, Howly etc.(excluding Barpeta Bypass) on NH-427.
Periodic Renewal of road from km 844/000 to km 858/000 of NH-31 under Abhayapuri Construction Division, Abhayapuri in the state of Assam for the year 2021-22 (12.506 km). (Job No- TA/31/2021-22/263)
MMUPPNA_RIDF_XXIX_23_24_31 Improvement of (1) NH-15 at Sirajuli to Sopai Pathar Road from Ch. 5280m to 16180m (2) Kehrukhunda to Nagapathar Road under Mukhya Mantrir Unnoto Pakipath Nirman Achani under RIDF-XXIX of NABARD for the year 2023-24
Re-construction of NH-37 to Khonamukh Cintamonigarh Ali (Road code- 23912, Road No. RR03S034) under Nazira and Amguri Territorial Road Division under SOPD (G) for the year 2019-20, Amguri LAC. Pkg. No. SOPD(G)/NATRD/AMG/13
MMUPPNA_RIDF_XXX_24_25_144 Widening and Strengthening of Road from Old AT road at Dimoruguri to NH 15 (Part I II) (L 4.20 km)under Mukhya Mantrir Unnoto Pakipath Nirman Aachani (MMUPPNA) under RIDF-XXX of NABARD for the year 2024-25
MMPPNA_22_23_46 Construction of road from (i) Bordeuri to Raidengia from Ch 0.00m to 2710.00m (Length 2.71km), (ii) Silikhaguri to Madhabpur Majghat road via Chetiachuck from Ch 0.00m to 1150.00m (Length 1.150km)and (iii) NH-15 at Jarabari to Napamua
Periodic Renewal of NH-37 to Kolbari Chengaliati Chariali to Parbatia Sarucharai Extention from Ch. 11.401km to 12.501km L-1.10km ,NH37 to sonari Gaon Phukanar Ali L-5.00Km, from Ch. 0.00m to Ch. 5000.00munder MMPNA 2023-24-Teok LAC
MMPPNA_22_23_434 Construction of road from (i) Circuit House Approach Road, (ii) Rudrapad to Ouguri Road, (iii) NH-15 to Gabharu Dev. Block Road (connecting Radhikapur) (Ch-0.00 m to CH-1033.00 M including routine maintenance for 4 (four) years
SOPD_G_22_23_10 Improvement of road and other related infrastructure connecting proposed 76th Asom Sahitya Sabha Adhibeson at Moni Kanchan Khetra, Narayanpur under SOPD-G for the year 2022-23 in Lakhimpur District (NH-15 at FCI Godown to Assam Arun
MMPPNA_23_24_142 1. Construction of 4th km Tinmile Bhitorsuti PMGSY road to 6th KM via Gotlong Phultola, 2. Construction of NH-715 Dolabari Chariali to Bhojkhowa PWD Road (Ch. 0.00m to Ch. 1600.00m), 3. Construction of Borjhar Gaon Bye Lane
MMPPNA_22_23_139 Construction of road from (i) NH36 At Bakulia H.S. School To Natun Basti (Bak HS school to Kangjuk kachari), (ii) NH-36 Phuloni Bazar To Karuna Killing Gaon Part 1 (Phuloni bazar to Karunakilling gaon) including routine maintenance
Improvement of NH-37 to Borbaruah T. E. Road (Line-4) (Ch. 0.00 m to Ch. 1360.00 m) under SOPD (ODS) for the Year 2020-21 under PWRD, Dibrugarh, Lahowal, Moran and Tingkhong Territorial Road Division, Dibrugarh - Dibrugarh LAC.
MMPPNA_22_23_389 Construction of road from (i) NH-37 to Chincoorie Road via Pechador Road (Ch.0.00M to Ch.3693.00M), (ii) Kanchanpur P.M.G.S.Y. Road to Kalibari via Ghosh Para (Ch. 0.00m to Ch. 1225.00m), (iii) Chincoorie Kanchanpur Road to Murapara