Loading…
Loading…
2,956 results • Best match
Construction of 9 Nos. of Standalone Safety Structures/Works at different Locations on various NHs in the State of Maharashtra on EPC mode
Engagement of Manpower Service Provider for Collection of User Fee on Raibha Fee Plaza at km. 10.800 new Four Lane Agra bypass connecting km 176.800 of NH2 to km 13.030 of NH3 in the State of Uttar Pradesh
Const. of a Load Bearing precast box drain measuring 2x2 meters in length of 4350 km along the Badarpur Elevated Highway in Delhi and Haryana on item rate basis
IE services for Supervision of Construction of greenfield connectivity to Jewar International Airport from DND Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on Hybrid Annuity Mode under BMP in UP and Haryana
Consultancy Services for Carrying out Feasibility Study for Development of Personal Rapid Transit (PRT) System in GIFT City, Ahmedabad, Gujarat
4-Laning of Ujjain-Badnawar Section from km 29.6 to km 96.00 (Length-69.1 km) in Madhya Pradesh on HAM
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON TRANS HARYANA CORRIDOR FOR BUNDLE AK1 TO AK3 IN AMBALA-KOTPUTLI SECTION ON LEASE BASIS
CS for AE for Supervision of Development of 6 lane access control GF highway of Delhi-Saharanpur-Dehradun under BP from Junction of EPE Vill-Mavikalan Design Chainage 0 to 56.500 Vill-Karaunda Mahajan in UP on EPC Mode under BP Phase-I PKG-I
4Laning of Chowka to Kaimaha near MP/UP Border sec NH34 form Design Ch145.000 to Design Ch197.266 excluding existing Chhatarpur bypass from Design Ch.160.307 to Design Ch.168.630 (PkgIV)
Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.
Gamjal fee plaza at km 281.320 for the section from Km 278.000 to km 308.000 (Kadthal to Armur Section) of NH7 in the state of Telangana (Under PIUNirmal)
Consultancy Services for Preparation of DPR for Connectivity of Gadchiroli(MH) with Raipur Vishakhapatnam Corridor in the State of Chhattisgarh
Construction of Additional structures including approaches in Vadodara Surat section of NH48 between existing Km. 108.000 to Km. 250.000 in the State of Gujarat on EPC Mode
Construction of Approach on Rail cum Road Bridge over River Ganga in Ghazipur on NH24 in the State of Uttar Pradesh on EPC mode.
CS for AE services for 4laning of(i)Thirumangalam Vadugapatti section from Km. 0.000 to Km 36.000 of NH744(PckgI) and (ii)Vadugapatti Therkuvenganallur section from Km36.000 to KM71.600 of NH744(PckgII) in Tamil Nadu on EPC Mode under BMP
Construction of 8Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village with SH-152 near Matariya Vadi in Panchmahal (Ch.729.700-756.052) of Delhi-Vadodara GA on EPC Mode under BMP in Gujarat
Initial improvement works under Tolling Operation Maintenance and Transfer of Palanpur Abu Road Swarropganj sect(from km 601.000 to km 677.000) of Nh27 in the state of Gujarat and Rajasthan
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON TRANS RAJASTHAN CORRIDOR FOR BUNDLE ABJ1 TO ABJ3 IN AMRITSAR BATHINDA JAMNAGAR SECTION ON LEASE BASIS
Balance work of four laning of Gwalior Shivpuri from existing Ch. 215.000 (design Ch. 100.757) to existing Ch. 221.500 (design Ch.107.350) section of NH3 passing through Madhav National Park (Total length-6.593 km) in MP on EPC Mode basis.
Construction of Eight Lane access controlled Expressway from Bani Village to Bardawadi village of Mandsaur district section of Delhi-Vadodara Greenfield Alignment on EPC Mode under BMP in the State of MP.
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON AMRITSAR BATHINDA JAMNAGAR CORRIDOR FOR PACKAGES 2 AND 3 IN SANCHORE SANTALPUR SECTION ON LEASE BASIS.
Rehab and strength. along with integrated routine maintenance incl. IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.212.000 near Ghaggar User FP to Km. 272.000 near Khanna in Punjab on Item Rate Percentage basis
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Const of 2Lane GF Bypasses in Lalganj Ajhara Mohanganj and Raniganj on Raebareli Jaunpur Sec of NH31 in the State of Uttar Pradesh on HAM.
Special Repair and Maintenance of Ghazipur Ballia UP/Bihar section from km. 405.030 to km. 535.300 and on NH31 in the state of Uttar Pradesh
Construction of Eight Lane access-controlled Expressway from Rajasthan MP Border to Jodmi village of Mandsaur district section of Delhi-Vadodara Greenfield Alignment under BMP in the State of MP on EPC mode
Construction of 6 Lane Elevated corridor from KM 593.766 to KM 596.400 including construction of slip roads service roads in Kagal City. (Descoped work of Kagal Satara Package1) in the state of Maharashtra on EPC Mode.
REQUEST FOR PROPOSAL FOR IMPLEMENTATION OF AUDIT CAMERA SYSTEM FOR VEHICLE COUNT AND CLASSIFICATION AT TOLL PLAZAS
Request for Proposal (RFP) for Consultancy Services for Supervision and Monitoring of Multi Lane Free Flow (MLFF) Tolling Projects in India
Consultancy Services for Preparation of DPR for Extension of UER-II till Delhi Saharanpur Highway
Construction of Additional Structures in Kerala/Tamil Nadu Border Kanyakumari section (From Km 43.300 to Km. 96.714) of NH47 in Tamil Nadu on EPC Mode
Construction of Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai river bridge of Raebareli Prayagraj section of NH30 (Old NH24B) under Bharatmala Pariyojna in Uttar Pradesh on EPC mode
Development Operation and Maintenance of Ropeway to Dhosi Hill in District Mahendragarh in the State of Haryana on Hybrid Annuity Mode
Engagement of Manpower Service Provider for collection of User Fee on Boharipaar Fee Plaza under Tolling Operation Maintenance and Transfer of Rewa Katni Jabalpur lakhnadon Sec from Km 656.000 to Km 891.780 of NH30 and Km 1358.000 to Km 1428.557 of
Consultancy Services for Preparation of Detailed Project Report (DPR) for 4-laning of the Bhopal- Kota section (Total length (Approx) 340 km) in the state of Madhya Pradesh and Rajasthan.
Consultancy services for Preparation of DPR for 4 laning of Malegaon Manmad Kopargaon in the State of Maharashtra
Routine Maintenance and Periodic renewal work of 2lane with paved shoulder/4 lane of Gagaria BaoriKalan Serva Bakhasar Section of NH925 DC 0.000 to 136.520 and Sata Gandhav Section NH925A DC 0.000 to 60.450 TL 196.970km. in Rajasthan
CS for AE for Supervision of balance work for rehabilitation and upgradation of Sidhi Singrauli Road from Km 82/400 to Km 187/99 DL 105.59 Km of NH39 (Old NH75E) to four lanes with paved shoulder in Madhya Pradesh on Item Rate Mode
Balance work for Four Laning of Amravati Chikhli section of NH6 Package1 from km 166.000 (Amravati) to km 220.000 (Near Kurankhed) in the state of Maharashtra to be executed on Hybrid Annuity mode under Bharatmala Pariyojna.
Construction of 2 lane Greenfield highway from km 134.737 to Km 163.253 Sagar Link Road Berkhedi Sagar Stage 1 under Bharatmala Pariyojana in the State of Madhya Pradesh on EPC mode.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Anarbansalea village to Sagrampur village (From KM. 151.200 to KM. 184.700 Pkg-7 Total Length 33.50 Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Development of 4Lane Road Connectivity from existing East break water upto Convent Junction from Phase 1 of the project start from Km.0.312 End of Visakhapatnam Port Trust and Ends at Km.3.800 VCTPL Exit Gate in AP under BMP
Development Operation and Maintenance of the MMLP Nagpur at Sindi in Wardha District in Maharashtra through PPP on DBFOT basis.
Construction of 6 lane Greenfield corridor from Ramnagar to Kacchi Dargah NH119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana
Construction of 6-lane Greenfield Varanasi Ranchi Kolkata Highway from Donoreshan village to junction with NH20 in Bongabar village from km 288.600 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (PKG11)
Request for Proposal (RFP) For Selection of Master System Integrator For Closed Loop Tolling via FASTag along Delhi Mumbai Expressways
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
CS forAE for Supervision of Cons. of 4lane Greenfield Amritsar connectivity for Conne. of Amritsar with Delhi Amritsar Katra Expr. Jun. Kapurthala Sultanpur Lodhi road(NH703A)ch.24.000 toMDR Jun. atch. 40.900 Dhunda Villageon EPC underBMP in Punjab