Loading…
Loading…
2,956 results • Best match
Operation and Maintenance of Meerut to Muzaffarnagar Section from km 52.250 to km 130.560 of NH58 in the State of Uttar Pradesh on Item Rate (Percentage) basis
O-M including Strengthening of Ambedkar Nagar to Raebareli section of NH128 from km 0.00 to km 148.980 and Ayodhya Prayagraj Section from km 82.00 to km 95.100 of NH330 Total Project Length of 162.08 km in Uttar Pradesh on PBMC Mode
Development of 6Lane Access Controlled GFH from Mallapalle(Ch176.000) to Kavulakuntla(Ch196.000) of Bengaluru-Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh(Pckg8)
Routine Maintenance and Periodic renewal work of 2Lane with paved shoulders of Jaisalmer-Barmer Km 0.00 to Km 122.880 and 144.500 to Km 153.034 of NH68 in Rajasthan on PBMC mode
Office Interior Work including Civil Work, Furniture and Furnishing Work Electrical Work, HVAC Work, Fire Protection Work and other Miscellaneous Work at 3rd Floor D-21, Corporate Park DMRC, Sector8 Dwarka, New Delhi
Establishment of 4 No. Highway Nest (Mini) Shop for sale of food and beverage items on Delhi Meerut Expressway (NH9) at Km 0.500 and Km 1.150 on LHS and RHS of Yamuna Bridges in the State of Delhi.
Consultancy Services for Feasibility Study for Development of Multimodal Logistics Park at Indore and Detailed Project Report for External Trunk Connectivity Infrastructure to the Multimodal Logistics Park site in Indore
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI MUMBAI EXPRESSWAY IN JHABUA VADODARA SECTION ON LEASE BASIS
Development of 6 Lane Dhanara (Odisha/Chhattisgarh Border) Hatibena Section of NH130CD Road from km 124.611 to km 146.500 under Raipur Visakhapatnam Economics Corridor in Odisha on HAM (Package OD 1)
Development of 6Lane Access Controlled Greenfield Highway from Odulapalle (Ch.72.000) to Nallacheruvu palli (Ch.96.300) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in the Andhra Pradesh (PKG-4)
CS for Preparation of Feasibility Study for Development of MMLP and Detailed Project Report for external trunk connectivity infrastructure to the MMLP Site at Nashik and Patna
Development Operation and Maintenance of Ropeway between Shankar Viman Mandapam and Triveni Pushp at Prayagraj in the State of Uttar Pradesh on HAM
Strengthening and Major Maintenance of 2Laning with Paved shoulder of Chhapra Rewaghat Muzaffarpur sec of NH102 from Km 1.300 to Km 74.200 EC and Km 1.300 to Km 74.379 DC (Total Design length 73.079 Kms.) in Bihar on PBMC mode (2nd call).
IE services for Supervision of Construction of 4lane Greenfield Delhi Amritsar Katra Expressway from Junction with KMP Expressway near Jussur Kheri to Junction with Jind Panipat road NH352A near Gangana (Km 0 to Km 60.800) on HAM under BP in Haryana
Development Operation and Maintenance of Ropeway from SDA Parking (Near Zeberwan Park) to Shankaracharya Temple in the Union Territory of Jammu and Kashmir on Hybrid Annuity Mode
Amakathadu at km 250.700 from Hyderabad to Bangalore section from Km 211.000 to km 295.000 (length 84.000 km) of NH7 (New NH44) in Andhra Pradesh (Under PIU Anantapur)
Upgrad upto 4lane of sec NH146 from DC km 124.470 EC km 148.180 near Rahatgarh DC km 134.549 EC km 158.435 near Berkhedi in Madhya Pradesh on HAM under Bharatmala Economic Corridor 4 PL 10.079 km
SPUR of Panipat Shamli NH709AD bypassing Shamli town and connecting NH709A in the State of Uttar Pradesh.
Engagement of user fee collection agency on the basis of e-quotation through open bidding for Milk Majra Fee Plaza at Km 98.750 on UP Haryana Border Yamunanagar Panchkula Section from Design Km 70.830 to Km 176.400 in the state of Haryana.
DEVELOPMENT of Six Lane Chittoor-Thatchur HIGHWAY from km 61.380 to km 96.040 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package-III)
Construction of four-lane Greenfield Delhi Amritsar Katra Expressway from Junction with Rohtak Panipat road (NH709) near Rukhi Paani village to Junction with Jind Panipat road (NH352A)near Gangana (Km 34.000 to Km 60.800) on HAM under BP in Haryana
RFP for providing Manpower Services to InvitConcessionaire for collection of User Fee at Maigalganj FP of Bareilly Sitapur Section of NH30 (Old NH24) in Uttar Pradesh (From Km 262.000 to Km 419.590 of NH24)
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
IES for Supervision of i-Construction of 4-6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part-1 north of NH27 and Part2 south of NH27 ii-Construction of 4-6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1
CS for AE for SP of Construction of 4lane GF Amritsar connectivity for Connection of Amritsar with Delhi Amritsar Katra Expressway from MDR Junction at ch. 40.900 Dhunda to Junction with Ajanala road Harsh china Ch. 99.020 on EPC under BMP in Punjab
Construction of balance works as part 2 two numbers of interchanges of Jaipur Ring Road NH148C from Tonk Road NH52 to Ajmer Road Section NH48 in Rajasthan on EPC mode.
Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode.
Consultancy Services for Authority Engineer Laying of Optical Fiber Cable (OFC) and its allied infrastructure on Delhi-Mumbai Expressway and Bangalore Highway
CONSTRUCTION OF BALANCE 03 NOs OF MAJOR/MINOR BRIDGES AT KM.327.545 KM.411.105 and KM. 415.865 and 01 VUP AT 416.685 AND 2LANE CROSS FLYOVER AT KM. 413.830 ON EXISTING 4LANING OF BAREILLY SITAPUR OF NH24 ON EPC BASIS IN UTTAR PRADESH.
Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa.
O and M Works for Anandapuram Visakhapatnam Anakapalle sec from Km.682.980 to Km.741.256 and Ranastalam Town Portion from Km. 630.120 to Km. 634.120 of NH16 in Andhra Pradesh on PBMC
CS for preparation of DPR and Feasibility report for cons. of 4L tunnel and viaduct (205.26 to km 207.25 TL of tunnel 1.67 km and viaduct 320m) on NH33 and 4L spur connection from IWAI Sahibganj port to NH33(TL 2.8 including 1 ROB) in Jharkhand
AE Ser for Const. of Flyover for LT Recti. of 4 MoRTH Identified BS at Jolhupur junc at Km.1534.215 Chaura Bakra Mandi at Km1544.300 Patel Chowk junc at Km1556.285 n Premium Factory Kota junc at Km1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu- Package-III (km 9.700 to Km 14.185)
Construction of 4lane Bangalore-Chennai Expressway from Km 127.000 (Bangarupalem) to Km 156.000 (Gudipala) Section in the State of Andhra Pradesh under Bharatmala on Hybrid Annuity Mode (Phase II/Package III)
Construction of Additional Structures on Six Lane Gurgaon Jaipur Section of NH48 between Km 42.700 to Km 273.000 in the states of Haryana and Rajasthan on EPC Mode
Construction of 8 lane access controlled Expressway from Km 26.582 to Km 50.700 of Main Expressway and Km 0.0 to Km 3.00 of SPUR Shirsad to Masvan Section of Vadodara Mumbai Expressway in the State of Maharashtra on HAM under BMP Ph II Pkg XIII
4 Lane Expressway from km 53.500 to km 71.000 of Bangarpet to Bethamangala Section of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Karnataka (Phase-I Package-III)
Engagement of Manpower Service Provider for collection of User Fee on Raibha FP at km. 10.800 new 4Lane Agra bypass connecting km 176.800 of NH2 to km 13.030 of NH3 in the State of Uttar Pradesh
Strengthening and improvement of Gorakhpur Kasia UP/Bihar Border Sec of NH27 from Ch. Km330.002 to Km 366.117 (TL 36.115 Km)on EPC Mode in the state of Uttar Pradesh
CS for preparation of Feasibility study and detailed project report for up gradation of NH80 section from km 190.00 to km 215.00 into four laning including Sahibganj bypass(between km 197.00 to km 207.00)and from km. 260.00 to km 283.00 in Jharkhand.
Strengthening or Overlaying on Six lane Gurgaon Kotputli Jaipur section of NH48 Old NH8 from Km 107.100 to Km 273.000 in the State of Rajasthan at the Risk and Cost of Concessionaire on item rate percentage basis.
IE Services for Construction and Upgradation to Four Lane from Manikpur (DC Km 0.000) to Sahebganj (DC Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call)
RFP for Construction of Four Lane Nagpur Katol section of NH353J including Mitigation Structures from Design Ch. 37.000 to Ch. 45.990 (Tiger Corridor-I) in the State of Maharashtra on EPC mode.
4laning of existing Beas BabaBakala DeraBabaNanak NH503D from Beas NH3 terminating at Kartarpur Sahib Corr at DBN under BMP PKG1 from intersec with Jalandhar AmritsarNH3 near Beas to start of Batala Bypass near Acchal 0.0 to 31.3 on EPC in Punjab
4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Configuration of 2Lane one way and 3-Lane one way including Proof checking from (IIT)/ (NITs) and Approval from (RDSO Lucknow)
4 laning of Channarayanapatna BP from km 140.449 to km 149.596 and Hassan BP from km 175.935 to km 185.684 and providing Grade Separator Structures Service Road and other safety measures in Devihalli to Hassan of NH75 (old NH48) on EPC in Karnataka
Development of 6Lane Access Controlled GFH from Narayanmpet(Ch203.500) to Chandrasekharpuram(Ch228.000) of NH544G Bengaluru-Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh(Pckg-10)
Construction of Foot Over Bridges in Gurgaon Kotputli Jaipur section of NH8 from Km 42.700 to Km 273.000 (approx. 225.600 km) in the States of Haryana and Rajasthan on EPC mode