Loading…
Loading…
2,956 results • Best match
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
Construction of leftover portion of additional 2lane Gandak Bridge and rehabilitation of existing operational 2lane Gandak Bridge in km 423-424 of NH28 (New NH27) in Bihar on item rate contract (percentage contract).
Improvement and Upgradation of Existing Road to 4lane with Paved Shoulder from Km 229.070 to 260.800 End of Hardoi District to Lucknow of NH731 Pkg4 on EPC basis in the state of Uttar Pradesh
Rehab and strenth. along with integrated routine maintenance incl.IM of 6L Panipat Khanna Sec NH44 old NH1 from Km.152.000 near Samana bahu to Km. 212.000 near Ghaggar User FP in Haryana n Punjab on Item Rate Percentage) basis
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON TRANS RAJASTHAN CORRIDOR FOR BUNDLE ABJ4 TO ABJ5 IN AMRITSAR BATHINDA JAMNAGAR SECTION ON LEASE BASIS
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-IV (km 14.185 to Km 20.223)
CS for AE for Supervision of for const. of Underpasses VUP LVUP SVUP MNB CULVERT and Service Slip Road for long term mitigation measures on Potential BS location in Lakhnadon Khawasa sec Gwalior Nagpur corridor of NH44 under Road Safety in MP on EPC
Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design. Ch. Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call)
Development of Multi Modal Logistics Park (MMLP) at Jalna in the State of Maharashtra on Engineering Procurement and Construction (EPC) mode
Consultancy Services for Preparation of DPR for Construction of Moregram Kishanganj High Speed Corridor in the State of West Bengal
Development of 6 Lane Access Controlled Greenfield Highway from Yerragudipadu (Ch.129.000) to Audireddipalle (Ch.160.000) of Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh (Package-6)
Construction of 4-lane Thiruvarur Bypass (Km 15.900 Km 30.836) in Nagapattinam Thanjavur Section of NH83 in Tamil Nadu on Hybrid Annuity Mode (Project Length 14.936 km)
Construction of Greenfield Connectivity to Jewar International Airport from DND-Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in Uttar Pradesh n Haryana
CS for IE for Supervision of Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor from Design Chainage O (Delhi-Dehradun) to 50.700 (Bahadrabad) in UP and UK on HAM under BMP DS/PKG-III
Rectification of 13 Nos Blackspots Accident spots under Annual Road Safety plan for 2024-2025 in the stretch of Walayar Vadakancherry and Thrissur Angamaly Sec of NH544 in Kerala on EPC mode
Engagement of Manpower Service Provider for collection of User Fee on Raksha FP at km. 1374.650 from Shivpuri to Jhansi sec from km 1305.087 to 1380.387 on New NH27 in the State of MP
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai Chennai Kolkata Kolkata Agra Agra Delhi Corridors of Golden Quadrilateral
Construction of bypass to Mozari town on NH53 (Old NH6) Taluka Tiwasa Dist. Amravati (Existing km. 118.700 to km. 124.400) (Design km. 0.000 to km. 6.100) in the State of Maharashtra on EPC mode
IE services for Supervision of Construction of 4lane Greenfield Delhi Amritsar Katra Expressway from Jn. w/ Ambala Hissar NH152 near Kharak Pandwa to Jn. w/ Patiala Patran SH10 near Ghagga 120.250 to 157.920 on HAM under BP in Haryana and Punjab
Improvement and Upgradation of NH734 sec of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPC basis in Uttar Pradesh and Uttarakhand PckgIII Kashipur BypassLength14.490 km. Starts from Ch.38.770 near UP UK Border a
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Appointment of SC for Construction of 6lane access controlled highway from DND-Faridabad Ballabgarh Byp. to Junction near KMP Exp. with NH148NA Delhi Vadodara Expressway section of NH148NA Ch.0.000 to 59.063 in Delhi and Haryana on HAM under BMP
Construction of 4 lane Vehicular Underpass VUP at Aler Jeedikal Cross Road at Km 72.010 along with Slip or Service Roads on Hyderabad Warangal section of NH163 in the state of Telangana on EPC mode.
Const. of 6L EC from KM 12.695 to KM 14.100 in Kuwarbav sec of NH166 Descoped work of Ratnagiri Package1 in the state of Maharashtra on EPC Mode
CS for Preparation of DPR for (a)Development of new GF High speed corridor from Nanded-Degloor along with spur connecting to Jalna-Nanded Expre.(b)Elevated viaduct-flyover in AusaTown and (c)Flyover-Trumpet Interchange at Waranga Phata T-Junc. in MH
Development of 6Lane Access Controlled Greenfield Highway from Vankarakunta (Ch.45.700) to Odulapalle (Ch.72.000) of Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh (PKG-3)
Providing laying of Optical Fiber Cable from km 0.000-km 59.100 of DND-Faridabad bypass KMP and km 0.000-km 31.100 of GFC to Jewar IA from DND-FBD-Ballabhgarh Bypass KMP Link and km 0.000-km 697.220 of DVE on EPC mode in Delhi UP HR Raj. and MP PKG-I
Two Lane with Paved Shoulders of Roshni to Ashapur (Betul to Khandwa Pkg III) from Design Km 89.900 to Design Km 114.000 section in the State of Madhya Pradesh on EPC Mode.
IE Services during Operation and Maintenance stage of Development of Delhi Meerut Expressway Pkg 1 2 3 from Km. 0.000 to Km. 50.270 Nizamuddin Ring Road or Delhi to Hapur in Delhi or Uttar Pradesh. Total Length 50.270 Km
Engagement of user fee collection agency on the basis of CB through open bidding for Milk Majra FP at Km 98.750 on UP/Haryana Border Yamunanagar Panchkula Section from Design Km 70.830 to Km 176.400 in Haryana.
Hiring of techn. manpower for Supervision of day-day maintenance repairs renovation of Furniture Furnishing CP Sanitary Plumbing Sewerage Services AC system DG transformer and electrical panelsResidential Complex Sec-17 Dwarka and Other in New Delhi
4laning of Haridwar Nagina sec of EUP mitigation measures on NH74 in Uttarakhand under NHDP ph4 on EPC design ch LME km 13.829 to km 17.110 and km 26.077 to km 27.508 and design ch RME from km 13.839 to km 17.120 and km 26.078 to km 27.509
Consultants for Preparation of Feasibility Study Report for development of Inter modal station (IMS) including development of Commercial Zone at Nagpur Maharashtra
Construction of 3 lane western side flyover from Design Km 0.300 existing Km.1098.680 (Before Jyothi Mahal Junction) to Design Km 2.770 existing Km.1096.210 (Beyond Ramesh Hospital Junction) on NH16 in Andhra Pradesh on EPC mode.
Construction of 6 lane Elevated Structure along with its approaches from Km. 142.000 to Km 144.800 Total Length 2.80 km on NH27 in the state of Gujarat
Routine Maintenance works for Palanpur/Khemana to Abu Road to Swaroopganj section (from Km. 601.000 to Km. 677.000) of NH27 in the State of Gujarat and Rajasthan
Four Laning of the Project Highway from End of Pinjore bypass Baddi Nalagarh Section Km 4.200 to 35.395 of NH21A New NH105 in Haryana and Himachal Pradesh on the EPC Mode
Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch. 61.878 and 63.845 for Jamb Junction in the State of Maharashtra on EPC mode. Regarding appraisal by IAC
Construction of Eight Lane Access Controlled Expressway from Km 69.800 to Km 79.783 (Bhoj to Morbe Section-SPUR of Vadodara Mumbai Expressway) in the state of Maharashtra on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase II-Pkg XVII)
Rehabilitation and upgradation for 4Lanning of Saha to Sahabad Section from Km. 14.840 to Km 31.760 of NH444A including Saha Southern Bypass connecting NH73 to NH444A (Total Length-21.05 km) under Bharatmala Pariyojna in Haryana on EPC Basis
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI MUMBAI EXPRESSWAY FOR BUNDLE DD1 TO DD4 IN DELHI DAUSA SECTION AND BUNDLE VK1 AND VK2 IN VADODARA KIM SECTION ON LEASE BASIS
Engagement of Manpower Service Provider for collection of User Fee on Madai Fee Plaza under Tolling Operation Maintenance and Transfer of Lakhandon to Mahagaon section of NH07 in the State of Madhya Pradesh
Const of 4laning of Bakarpur Manikpur road sec starting from vill Chitarsenpur(Km.0.000)and terminating at SH74 near Manikpur(38.814) at NH139W under Bharatmala Pariyojna on HAM mode in the State of Bihar.
Improvement works of Chittorgarh Bypass to Kota Section (from km 891.929 to km 1052.429) of NH27 in the State of Rajasthan on EPC Mode
CS for SC of Strengthening Road Safety works Including improvement and Routine OM of Delhi Gurgaon sec. of NH48 and works along the project highway from 14.300 to Km. 42.000 (Rao Tula RamMarg in Delhi to KherkiDhaula FP in Haryana) in Delhi Haryana
4laning of Aligarh Palwal Sec from Km.46.390 (DC) to Km. 69.110(Terminating at junc EPE)(PKG-II from Kurana Eastern Peripheral Expressway)of NH334D in Uttar Pradesh and Haryana on HAM
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai, Chennai Kolkata, Kolkata Agra, Agra Delhi Corridors of Golden Quadrilateral
Development of 6_lane access controlled Ludhiana Bathinda Greenfield highway section of NH754AD from junction with Amritsar Bathanda Greenfield Road (NH754A) near village Tallewal as a part of Ludhiana Ajmer Economic Corridor in Punjab on HAM PKG_I
Limited RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Veeravalli Fee Plaza of Gundugolanu Devarapalli Kovvuru section of NH16 in the state of Andhra Pradesh
Construction of External road connectivity to the proposed Multimodal Logistics Park at Nagpur-2nd call