Loading…
Loading…
2,956 results • Best match
O and CM of DG Sets EE-Electrical Installation Heating Ventilation and Air Conditioning Fire Protection Works Water Treatment Plant-Systems UPS System Cleaning of Glass Curtain and Maintenance of Landscape Horticulture Works at New Delhi
O n M of 4lane of Harike Faridkot Kotkapura Bathinda sec of NH15 New NH54 from Km.168.400 to Km287.215 excluding Km. 170.000 to Km.171.900 in Makhu town in Punjab on PBMC mode Flexible Pavement 28.663 Kms Rigid Pavement 88.252 Kms (2nd Call)
AE for Supervision of Development and Upgradation of 4lane AC Expressway from Km 530.000 to Km 545.300 (Sidhra to Ban Vill Sec of NH44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JnK (Ph2-Package XVIII)
Development Operation and Maintenance of Ropeway between Ujjain Jn Railway Station and Mahakaleshwar Temple in Madhya Pradesh on HAM.
Strengthening or Overlaying on Six lanes Gurgaon Kotputli Jaipur section of NH48 Old NH8 from Km 42.700 to Km 107.100 in Haryana at the Risk and Cost of Concessionaire.
Development of Six Lane Chittoor-Thatchur Highway from km 43.800 (Kumarajapet) to km 61.380 (Veera Kaveri Raja Puram) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package- II)
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Construction of Balance Work of ROB at km 290.445 of Bareilly Sitapur Section of NH24 in the State of Uttar Pradesh.
Development of Jhajra - Asharori Link Road (Design Ch 0.050 to Ch 12.220) in the State of Uttarakhand on EPC Mode
Consultancy services for IE for supervision of Construction of Eight lane access controlled Expressway from Km 190.00 to Km 254.430 of Vadodara Mumbai Expressway (Gandeva to Kim Section) in the State of Gujarat on HAM under BP.
Construction of 4L of Patna Arrah Sasaram corridor PKG2 Sec 1 Garhani at Ch. Km 73.700 Patar at Ch. Km 84.300 and Sec 2 Greenfield from Sadisopur at Patna Ring Rd NH131G) Ch. Km 0.000 to Asani (at NH319) at Ch Km 35.800 of NH119A in Bihar on HAM Mode
Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor in Uttar Pradesh and Uttarakhand on HAM under BMP (From Ch. 0 to Ch. 50.700)
Permanent rectification of 3 no of black spots in NH27 of UP border Dewapur Kotwa seC from km360.915 to km. 440 and5 no of black spots of project Highway NH27 of Kotwa Mehsi Muzaffarpur Sec from km 440.00 tokm 520.00(Total Length 80.00 Km)in Bihar
Development of Six Lane Karki Kaliagura Section of NH130-CD Road from km 226.500 to km 249.000 under Raipur Visakhapatnam Economic Corridor in the state of Odisha on HAM (Package OD-4)
Engagement of Safety Consultant Services during Operation and Maintenance of Delhi-Meerut Expressway Package-I (km 0.000-km 8.360) Package-II (Km. 8.360-Km. 27.740) and Package-III (Km. 27.740-Km. 49.346) on HAM in Delhi and Uttar Pradesh
Development of 4 lane Economic Corridor from Before Mayurakshi Bridge Approach to Moregram section Km 180.000 to Km 230.957 of NH116A (Package 5) in the state of West Bengal under HAM Mode.
Consultancy Services for AE for Supervision of Construction of 8-lane access controlled Greenfield Delhi-Vadodara Expressway starting at Rajasthan-MP Border to Bardawadi village of Mandsaur district in Madhya Pradesh on EPC mode under BM Pariyojana
Construction of Eight lane access controlled Expressway from Km 190.000 to Km 217.500 of Vadodara Mumbai Expressway (Gandeva to Ena Section) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana (Phase I-Package VII)
CS for Preparation of Feasibility Study for Development of MMLP and Detailed Project Report for external trunk connectivity infrastructure to the Multi Modal Logistic Park Site at Anantapur and Visakhapatnam in Andhra Pradesh(3rd Call)
Development Operation and Maintenance of the MMLP Indore near Pithampur in Dhar District in Madhya Pradesh through PPP on DBFOT basis
IE for Upgrade of Exist 2L Carriageway to 4L Divided Carriageway from Ch 208.90 (Exist Km 535.93) in Nasapore Vill in Umarpada Taluka to Ch 269.11 (Exist Km 608.51) in Malotha Vill in Vyara Taluka (L 60.21 Km) sec of NH56 in Gujarat on HAM (Pkg VI)
O-M including Strengthening through Performance based maintenance contract (PBMC) of Raebareli to Banda section of NH232 from Km 148.993 to Km 285.818 excluding bypasses at Lalganj and Fatehpur in the state Uttar Pradesh
Consultancy Services for Preparation of Detailed Project Report (DPR) for elevated corridor for connectivity from AIIMS to Mahipalpur Bypass project with further extension to Gurgaon- Faridabad Road.
Cons. of Long Term Remedial measures of River cut/bank erosion at identified 12 locations (i.e. RC-18 A-RC-22 RC-20 A-RC-25 A-RC-26 A-RC-24 A-RC-19 A-RC-20 and A-RC-21 RC-21 RC-23 RC-25) KULLU TO MANALI on K-M Sec. of NH03 (OldNH21) in HP on EPC
Engagement Of Manpower SP For Collection Of Fee On Daroda FP At Km. 92.500 Of Borkhedi Wadner n Kelapur FP At Km 150.000 For Sec From Km 36.600 To Km 174.750 Borkhedi Yerla MH or TG Border Sec Of Nagpur Hyderabad Sec Of NH44 In Maharashtra
Consultancy Services for AE for SC of 8-lane access controlled Greenfield Delhi-Vadodara Expressway at Junction with MDR-1 (Baonli-Jhalai road) to Major Bridge on Mej River (Ch.247.310-Ch.331.030) in the State of Rajasthan on EPC mode under BMP
2 Lane Existing Bypass of Rampur to be Developed to 4 Lane in the State of Uttar Pradesh on EPC mode
Construction of Eight lane access controlled Expressway from Km 43.000 to Km 69.800 (Amne to Bhoj Section-SPUR of Vadodara Mumbai Expressway) on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XVI)
IE services for Construction of 6Lane Greenfield spur from Delhi Vadodra Greenfield expressway near Bandikui to Jaipur in Bharatmala Pariyojana Phase I on Hybrid Annuity Mode in the state of Rajasthan
Design-const of 26 VUPs and 4SR Instal of Metal Beam Crash Barrier (for PKG C3-C9) and Demolition and Reconst of Distressed Bridge at ch 402.987 (LHS) on Lalitpur-Sagar-Lakhnadone from Km 99.005 to Km 415.089 Sec of NH44 (Old NH26) in UP-MP on EPC
Development of 6_lane Amritsar Bathinda Greenfield sec of NH754A to junction with Bhagta Bhai Ka Bhadaur Road near Mandi Dabwali Bathinda Road on NH54 near Sangat Kalan as a part of AmritsarJamnagar in Punjab on HAM under BP PhaseI (Pkg3)
Limited RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Maigalganj Fee Plaza of Bareilly Sitapur Section of NH30 (Old NH24) in Uttar Pradesh (From Km 262.000 to Km 419.590 of NH24)
CS for AE for Supervision of Construction of 4lane Greenfield Delhi AmritsarKatra Expway from Jn. with Jalandhar Moga rd NH703 near Kang Sahibu to Jn. and Jn. with Jalandhar Moga rd NH703 near Jn. with Kapurthala Sultanpur Lodhi rd NH703A on EPC unde
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
Development of Six laning of Chittoor-Thachur road from km. 96.040(Pondavakkam) to km. 116.100 (Kannigaipair) on Hybrid Annuity mode under Bharatmala priyojana, in Tamil Nadu (Package-IV)
Improvement and Rehabilitation of Lucknow-Ayodhya Section of NH28(New NH27) from Existing km68.900 to km121.600 in Uttar Pradesh on EPC Mode.
Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500 km 126.500 to km 158.500 including ACC link road from km 0.00 to km 2.003) Greenfield Alignment (Package2) in the State of Himachal Pradesh on HAM.
Const of 4by6 lane access controlled expway from Jn with Hiranagar Rd near vill Gurha Baildaran to Jn with Jammu Ring Rd NH244A near Jakh vill 468.100 to 503.250 of Delhi Amritsar Katra Expway on HAM under BMP in the UT of JandK Ph2 Pkg15
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Pariyojana from Junction of EPE Design Ch 0.000 to Design Ch 27.000 (Vill.-Lohadda) in the state of UP on EPC Mode (Package-I) 2ND CALL
Construction of Elevated Corridor in Ranchi city from km 0.00 to km 3.570 of NH75 including down ramp on NH23 from km 0.000 to km 0.610 in the State of Jharkhand on EPC mode
4laning of Harda to Temagaon from km 0.000 to km 30.000 (Harda Betul PkgI) on Hybrid Annuity Mode under Bharatmala Pariyojna PhaseI.
Consultancy Services for preparation of DPR-Feasibility Report of projects in the State of Kerala
BW under Phase-II for 4-laning of Khed Sinner comprising of the stretches of Kalamb bypass (km68.576 to km72.390) Linear length of Bhatkalwadi (km89.550 to km90.400) and Alephata bypass (km 92.030 to km 96.000) in Maharashtra on EPC Mode
Completion of balance works pending in bit and pieces(Incomplete stretch at 7 locations) and other listed balance works from km274.800 to 338.030 in AP Portion and other listed balance works from km0.000 to km43.950 in TN portion of 4 and 2 laning of
REQUEST FOR PROPOSAL (RFP) FOR SERVICE PROVIDER FOR IT FACILITY MANAGEMENT-2nd Call
Develop. of 6lane GF PKG-IIA starts from Ch.23.325 to Design ch. 32.090 around Kanpur city (Length 8.765 kms) in the state of Uttar Pradesh on EPC mode (2ND CALL)
Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (12.190 to km 42.113) section of NH60 in Maharashtra on BOT (Toll) Mode.
Short Term Improvement and Routine Maintenance work of tolling reach of Ramnagar FP from km 1251.814 to 1305.087 L53.273 Km on Baran Shivpuri Sec of New NH27 in Madhya Pradesh on PBMC Mode.
4Laning of near Satai ghat to Chowka sec NH34 from D.Ch. 89.875 to DCh. 145.000 (Total Length 55.125 kms) in the State of Madhya Pradesh (PKG3) on HAM.
Const of 4lane Pathalgaon KunkuriCG/JH border sec of NH43 starting from end point of NH130A design Ch.00.000 to Ch. 104.250 (from Turua Ama vill to Putrichoura vill)under Bmp (Lot5 Pkg7)in the state of Chhattisgarh on HAM