Loading…
Loading…
2,956 results • Best match
Consultancy Services for IE during ONM Stage for Delhi-Meerut Exp Pkg-I Km 0.00 to Km. 8.360 in the State of Delhi and Pkg-III Km. 27.740 to Km. 49.346 in the state of UP on HAM
Development of Six Lane Chittoor-Thatchur Highway from km 0.000 to km 43.800 on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Andhra Pradesh and Tamil Nadu (Package-I)
Consultancy Services for Preparation of DPR for construction of 4-lane Southern Bypass of Jalgaon City in the State of Maharashtra
Const of 4L EC and atgrade improve from 0.0 to 19.87 of Danapur Bihta with connectivity to existing RoB 1.35 Km ramps and atgrade improvements to 4L and Upgrade of existing 2L-4L from 19.87-23.5 of Bihta Koilwar in Bihar on EPC (2nd Call)
Construction of 11 Nos of Standalone safety structures / works at different locations on various NHs in the state of Maharashtra on EPC Mode
CS for AE for Supervision of Construction of 4lane Greenfield Delhi AmritsarKatra Expway from Junction with Ludhiana Malerkotla Rd SH11 near Bhogiwal to Junction with Jalandhar Moga Rd NH703 near Kang Sahibu on EPC mode under BMP in Punjab
Construction of Eight Lane access controlled Expressway starting near Start of RoB (Ch.214.260-247.310) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
Construction of new 4lane Prayagraj Southern Greenfield Bypass from km. 50.860 (Nababa urf Nibi Kala Uparhar) to km. 64.763 on NH19 (near Khodaypur Kasgaon) including Interchange loop at NH19 (design length 14.980 km) Pkg3 PhI in UP on EPC under BMP
Engagement of Manpower Service Provider for collection of User Fee on Khimana FP and Undavariya FP under TOT and Transfer of Palanpur/Khemana to Aburoad to Swaroopganj sec(from km601.000 to Km677.000) of NH27 in Gujarat and Rajasthan
Construction of 8Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi and near Bhamaiya village in Panchmahal district (Ch.756.052-781.282) section of Delhi-Vadodara GAon EPC Mode under BMP in Gujarat
Operation and Maintenance of Jalandhar Amritsar section of NH03 from Km 387.100 to Km 456.100 Bidhipur to Verka junction in the state of Punjab for 7 years on Performance Based Maintenance Contract (PBMC) mode
CS of 2L VUP at Mukundpur junc 4L VUP at Lahra Mod junc 4L VUP at Eglas Chauraha junc 4L VUP at Kota Kapura junc 4lane VUP at Poiya junc and 4L of Malupur Tiraha as part of Rectification of MORTH identified BS in UP on EPC Mode
Const. of 4by6 lane access-controlled expway from Jn. with Pathankot Gurdaspur Rd NH54 near Balsua to Jn. with Hiranagar Rd near Gurha Baildaran 423.500 to 468.100 of Delhi Amritsar Katra Expway on HAM under BMP in Punjab and UT of JandK Ph2-Pkg14
Consultancy Services for Project Preparation of Feasibility Study Detailed Project Report of Road Safety Advocacy Park at Kanyakumari-End Point at Km 234/170 of NH7 in the State of Tamil Nadu
Construction of Six Lane Greenfield Patna Ring Road Highway (NH131G) from Kanhauli to Sherpur (from Km. 0.000 to Km 8.480) including Junction Development with Bihta Danapur elevated corridor (length1.5 Km) (TL 9.98 Km.) in Bihar.
CS for AE of Const. of a 4L Western bypass for Jaunpur city connect NH731 at exist. Ch.Km.223.200 to NH135A Eastern Bypass at Ch.Km. 107.780 TL 12.205 km in Uttar Pradesh on EPC mode
Four Lanning of Ratapani Stretch from Km. 8.300 to Km. 20.680 (length 12.380 Km.) of Obedullaganj Itarsi section of NH46 (Old NH69) in the state of Madhya Pradesh on EPC Mode
Construction of Six lane access controlled Highway from Km 40.080 to Km 86.513 (Mator to Barodameo Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (karvad to jujuwa section) in the state of Gujarat on Hybrid Annuity mode under Bharatmala Pariyojna (Phase I-Package IX)
Limited RFP for providing Manpower Services to Invit-Concessionaire for collection of User Fee at Dukkavanipalem FP of Anandapuram Pendurthi Anakapalle of NH16 in Andhra Pradesh
Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC Basis
CS for AE for Development of 6L GF (PKG-IIA) starts from Design Ch.23.325 to Design ch. 32.090 around Kanpur city (8.765 kms) and Development of 6L GF (PKG-IIB) starts from Design Start from 32.090 to Ch. 51.200 (19.110 kms) in UP on EPC mode.
Balance work of 4 Laning from Ramban Km 151.00 to Banihal Km 187.00 excluding realignment portions of NH1A Now NH44 with value addition at critical location on EPC mode in UT of Jammu and Kashmir under NHDP Phase 2
CS for AE for Supervision of Construction of 4lane Greenfield Delhi Amritsar Katra Expressway from Junction with Jalandhar Kapurthala near Khojewal village to Junction with Pathankot-Gurdaspur road near Gurdaspur) on EPC under BMP in Punjab
Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km.43.200 (near Mahuari) to design km.50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) PKG-2 under Ph-I on NH19 in UP under Bharatmala on EPC mode.
Independent Engineer Services during Operation and Maintenance period of 5 years for 6 Laning of Delhi Agra section from Km. 20.500 to Km. 200 in the State of Haryana and U.P on Design, Build, Finance Operate and Transfer (DBFOT) basis.
RFP for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System on Delhi to Agra Section of NH19 on EPC mode
Development of 6Lane Access Controlled GFH from Audireddipalle(Ch160.000) to Mallapalle(Ch176.000) of NH544G Bengaluru Vijayawada EC on HAM Mode under BMP Ph-I in Andhra Pradesh (Pckg7)
Upgradation and Development of 1 Nos. at Grade Junction to Grade Separator Underpass Flyover structure of Jaipur Rajasthan 200 Feet Bypass Junction project at Km. 273.600 (Delhi Jaipur Ajmer Expressway) in Rajasthan on EPC mode
Four laning of Galgalia Bahadurganj section of NH327E from Km 0.000 to Km 49.000 (PackageI) on Hybrid annuity mode in the State of Bihar
Development Operation and Maintenance of Ropeway from Nature Park(Mohal) to Bijli Mahadev Temple in District Kullu in Himachal Pradesh on HAM.
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway Jujuwa to Gandeva Section in the State of Gujarat on HAM under BMP Phase I-Pkg VIII
Development of 6Lane Access Controlled GFH from Kavulakuntla(Ch196.000) to Narayanmpet(Ch203.500) of NH544G Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh(Pckg9)
Four Laning of existing road section of NH30 (Old NH24B) from km 162.000 (Lalgopal Ganj) to km 179.450 (Nawabganj) of Raebareli to Prayagraj section in the State of Uttar Pradesh on EPC Mode
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
Improvement and upgradation of NH74 (New NH30) stretch Pilibhit Sitarganj from Km. 32.500 to Km.64.800 and Ch.0.00 to 6.00 (Sitarganj Bypass) on HAM in Uttar Pradesh and Uttarakhand (Package 2 of Bareilly Pilibhit Sitarganj).
4 Laning with paved shoulders from Km 0.900 to Km 11.650, Missing Link Project (Budhel Junction to Nari circle including Flyover at Nari and its approaches) section of NH51 in the state of Gujarat on EPC Mode
CS for IE for SC of Four lane Bangalore Chennai Expressway from Km 156.000 to Km 180.000(Package-I).Km 180.000-Km 204.500 (Package-II).Km 204.500-Km 230.000(Package-III) and Km230.000-Km261.705 (Package-IV) in Tamil Nadu under BMP on HAM (Phase-III)
Limited RFP for providing Manpower Services to InvitConcessionaire for collection of User Fee at Marripalem Fee Plaza of Anandapuram Pendurthi-Anakapalle of NH16 in the state of Andhra Pradesh
Balance Work of Rehabilitation and upgradation to 4 laning of NH31D from Km 113.200 to Km 154.854 (Pkg IIA) Falakata Salsalabari Section in the State of West Bengal on EPC Basis
Independent Engineer Services during Operation and Maintenance (O and M ) for Conversion of Delhi Gurgaon section of NH8 into an Access Controlled Eight/Six lane Highway from km 14.300 (Rao Tula Ram Marg) to km. 42.00 gurgaon ) in Delhi and Haryana.
Structural rehabilitation of Flyover RAMP-A on Port Road, Visakhapatnam by using specialized techniques in the State of Andhra Pradesh
Operation n Maintenance of 4 lanes with Paved Shoulders of Lambra Shahkot Moga section of NH71 (New NH703) from Km 12.120 to Km 77.200 (Length 65.080 Km) in Punjab for 5 years on Performance Based Maintenance Contract (PBMC) mode
RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Tarpongi Fee Plaza of Raipur to Simga Section of NH30 (Old NH200) from Km.0.000 to Km.48.580 in the State of Chhattisgarh
Construction of Eight lane access controlled Expressway from Km 217.500 to Km 254.430 of Vadodara Mumbai Expressway Ena to Kim Section in the State of Gujarat on HAM under BMP I Pkg VI
Streth and Major maintenance work of 2Laning with paved shoulder of Chhapra Gopalganj sec of NH85 Km 0.000 to Km 93.500 and Km. 0.000 to Km. 94.258 (Total Design length 94.258 Km) in Bihar on PBMC
Output and performance based maintenance of Rd from Km 136.600 to Km 268.475 (Excluding from Km 200.600 to Km 215.300) Raising of Profile of submerging portion at Km 192.450 to Km 193.550 from Kerala Border to Kollegala Sec of NH766 in Karnataka.
Construction of 4 Lane Access Controlled Highway from Vakalpudi Light House to Annavaram (on NH16) Section of NH516F from Km. 0.000 to Km. 40.621 on HAM under Bharatmala Pariyojana Phase I in the state of Andhra Pradesh
Engagement of Manpower Service Provider for collection of User Fee on Raksha Fee Plaza at km. 1374.650 from Shivpuri to Jhansi section from km 1305.087 to 1380.387 on New NH27 in Madhya Pradesh
IE services for 4lane with paved shoulder from Km88.750 to 123.650 Shahjahanpur bypass to Shahabad bypass of Nh731(Pkg2A) and Shahabad bypass to End of Hardoi bypass of NH731 on HAM basis in UP(Pkg2B)