Loading…
Loading…
2,956 results • Best match
Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of a New 4-lane Outer Ring Road around Latur City in the State of Maharashtra-2nd call
O and M and other Road Safety Works on Muzaffarnagar Haridwar Sec of NH334 from Km 130.500 to Km 206.220 in the State of Uttar Pradesh and Uttarakhand on EPC Mode
Widening of the exis.2Lane Paved Shoulder sec of NH716 frm TN/AP border(Ex CH Km.338.030/Ch Km61.510)to Puttu (Ch Km.318.000/Ch Km81.540) to 4Lane Paved Shoulder(Des.l 20.030 Km) n widening of the existing 4lane Paved Shoulder sec of NH71
Providing the laying of Optical Fiber Cable from km 697.220 (MP-Gujarat) to km 844.800 of Delhi-Vadodara expr. and km 26.600-378.722 of Mumbai-Vadodara Expressway and from km 0.000-79.900 of spur to JNPT on EPC mode in Gujarat and Maharashtra (PKG-II
Development Operation and Maintenance of Ropeway from Varanasi Cantt. to Godowlia Chowk in the State of Uttar Pradesh on Hybrid Annuity Mode
Construction of Six lane access-controlled Highway from Km 0.000 to Km 40.080 (Paniyala to Mator Section) of Paniyala-Barodameo ICR in the State of Rajasthan under Bharatmala Pariyojana on EPC mode
CS for preparation of DPR for develop. of 6 lane GF highway from Ahmedabad to Godhra Tentative L 120 Km to connect Ahmedabad with Delhi Mumbai Expressway (DME)
Development of 6 lane GF(PKG IIB)starts from Design Start from Ch.32.090 to Ch.51.200 around Kanpur city(Length19.110 kms)in the state of Uttar Pradesh on EPC mode
Const of 4Lane CG/JH Border Gumla Bharda sec of NH43 from design ch.0.000 (Vill. Katkaiya) to design ch. 32.370 (Vill. Bharda) in the State of Jharkhand on HAM under Bharatmala Pariyojana
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Anarbansalea village (From KM. 116.000 to KM. 151.200 Pkg-6 Total Length 35.20Km) under Bharatmala Pariyojana in the state of Bihar on HAM
IE for Upgrade/Strengthen of Exist 2/4 Ln Carriageway to 4L Divided Carriageway from 132.32 (Exist Km 454.5) in Dhamasiya Vill in Naswade Taluka to 179.78 (Exist Km 506.66) in Bitada/Movi Vill in Netrang Taluka (L 47.46 Km) Sec of NH56 in GJ HAM Pkg4
Improvement of the service road i.e. conversion of flexible pavement to rigid pavement on the service roads of Package 1 2 and 3 of UER II in the State of Delhi on EPC Mode.
Request for Proposal for Empanelment of Transaction Advisory services for projects to be taken up for Assets Monetization through Toll Operate Transfer
Request for proposal for Selection of Chartered Accountant Firms for Engagement as Internal Auditor and GST Consultant.
Construction of 4-Lane Spur of Meerut- Garhmukteshwar Section of NH709A connecting NH119 near Village Salarpur Jalalpur (Meerut) to NH58 (New NH334) near Village Daurala, (Meerut) bypassing Meerut city(design km 0 to design km 12.828) under BMP in UP
Construction of 8 Lane access controlled expressway starting from junction with SH63 Pratap Nagar village ending junction with NE1 near Dodka of Vadodara District section Delhi Vadodara Greenfield Alignment on EPC Mode under BM Pariyojana in Gujarat.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-I (km 0.342 to Km 4.604)
Access Controlled Highway of 4 lane with paved shoulders from Walajapet/ Ranipet (Design Chainage km 106.800) to TN/ AP Border (Design km 134.879) of NH40 in Tamil Nadu on Hybrid Annuity Mode (Project Length 28.079 kms)
4 Laning of Paramakudi to Ramanathapuram Sec of NH49 New NH87 from Km 80.360 to Km 127.025 DC in Tamil Nadu on Hybrid Annuity Mode (Project Length-46.665Km)
Development of 8Lane Elevated Flyover at Tier1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg-1 12.190 to km 28.925) sec of NH60 in Maharashtra on BOT (Toll) Mode.
Development of 8-Lane Elevated Flyover at Tier-1 on Single Pier including Upgradation of Existing Road to 4/6 Lane with 2 Lane Service Road on both sides of Nashik Phata to Khed (Pkg2 28.925 to km 42.113) section of NH60 in Maharashtra on (BOT) Mode.
Construction of 6lane Greenfield Varanasi Ranchi Kolkata Highway from Deoria village to Donoreshan village from km 253.000 to km 288.600 under Bharatmala Pariyojana in the State of Jharkhand on HAM (PKG 10)
Const of 4laning of Kotdwar Bypass of NH119 (Design Ch. 0.000 to Design Ch. 5.950) connecting Najibabad Kotdwar to Kotdwar Pauri Road in the State of Uttar Pradesh and Uttarakhand on EPC mode
Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47.723 to Km 54.405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar.
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON DELHI MEERUT EXPRESSWAY ON LEASE BASIS.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-II (km 4.604 to Km 9.700)
REQUEST FOR PROPOSAL (RFP) FOR Development and Maintenance of NHAIs Data Lake and analytics engine
Six laning of Surat Nashik Ahmednagar Solapur MH/KNT Border Greenfield stretch Package XIV from km 512.000 (Hasapur) to km 548.400 (Badadal) in Maharashtra to be executed on HAM under BMP
Development of 6Lane Access Controlled Greenfield Highway from Vanavolu (Ch. 24.300) to Vankarakunta (Ch. 45.700) of Bengaluru Vijayawada EC on HAM under BMP Ph-I in Andhra Pradesh (PKG-2)
Balance work for Const. of 8L access controlled expressway from km 154.6 to Km 190.0 of Vadodara Mumbai Expressway (Jujuwa to Gandeva section)in Gujarat on EPC mode Pkg VIII
Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 28.500 to Km 73.744 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-2)
Construction of 6lane elevated flyover inclu reconst. rehab of exist pavement Km 406.100 to Km 411.150 at Gobindpur area in the Barwa Adda Panagarh sec of NH19 from Km.398.240 to Km.521.120 inclu Panagarh Bypass in the State of Jharkhand on EPC Mode
Construction of 4-Lane Expressway from km 96.000 to km 127.000 of Baireddypalle to Bangarupalem Section in the State of Andhra Pradesh of Bangalore Chennai Expressway on Hybrid Annuity Mode under Bharatmala Pariyojna (Phase-II Package-II)
Upgradation of Existing 2Lane Carriageway to 4Lane Divided Carriageway from Ch.179.780 (Existing Km.506.660) in Bitada or Movi in Netrang Taluka to Ch.208.900 (Existing Km. 535.930) in Nasarpore in Umarpada Taluka Sec of NH56 in Gujarat on HAM PKG-5
Six laning of Kagal Satara section of NH48 (old NH4)Package I from km 592.240 to km 658.000 in Maharashtra to be executed on EPC mode under Bharatmala Pariyojana
Construction of Eight lane access controlled Expressway from Km 20.200-Km 43.000 (Akloli to Amne Section-SPUR of Vadodara Mumbai Expressway) in the State of Maharashtra on Hybrid Annuity mode under Bharatmala Pariyojana (Phase II-Package XV)
Construction Operation and Maintenance of Public Amenities on DBFOT Mode on UER II near Mundka Industrial Area Metro Station in the State of Delhi.
RFP FOR ENGAGEMENT OF CONSULTANT FOR GLOBAL NAVIGATION SATELLITE SYSTEM (GNSS) BASED TOLLING
Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions (Package1, 2, 3, 4, 5 and 6)
RFP for Conducting Traffic Survey on Selected Toll Plazas using Portable Automatic Traffic Counter and Classifier ATCC system alongwith Videography
Consultancy Services For Identifying Potential Options for Land Monetization and Assisting in Acquisition of New High Potential Land Parcels at East(Package-1) West(Package-2) North(Package-3) and South(Package-4) regions
Consultancy Services for identifying potential monetization options for available land parcels in East, West, North and South regions and support in acquiring additional land parcels with high monetization potential
Request for Proposal for Consultancy Services for Impact Study of NETC Programme and other Management Consultancy Services for IHMCL
Legal and Arbitration case Tracking and Monitoring System (LATMS) 2nd Call
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Development of Six lane access controlled highway of Daat kali Tunnel Dehradun of Ganeshpur Dehradun section of NH72A from km 16.380 to km 19.785 Design Chainage in Uttarakhand under Bharatmala Pariyojana on EPC mode Package3
Construction of Six lane upgradable to Eight lane of Kanpur Lucknow Expressway including spur from Km 10.980 to Km 28.500 in the state of Uttar Pradesh on Hybrid Annuity mode under Bharatmala Pariyojana (Package-I)
CS for AE for Upgrad of Yagyi Kalewa sec milepost 40 0 to milepost 115 5 in Myanmar to Two lane with earthen shoulder on EPC Mode.
DEVELOPING OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON TRANS RAJASTHAN CORRIDOR FOR BUNDLE ABJ6 TO ABJ7 IN AMRITSAR BATHINDA JAMNAGAR SECTION ON LEASE BASIS
4laning of Ujjain Garoth Pkg-1 Chandesari to Khedakhajuriya from Km. 0.00 to (-)750 and Km 0.000 to km 41.400 section of NH148NG in Madhya Pradesh on HAM.