Loading…
Loading…
894 results • Best match
Construction of PCC road from house of Mohan Rajwar to Adam Ansari at Village Bhauri (Chauratar Muslim tola NH 343) GP Chutiya under Ranka Block of Garhwa District
Widening / Strengthening and Reconstruction of Barlanga - Nemra -Pirgul - Kasmar (Bahadurpur (on NH-23) - Kasmar - Kherachater upto West Bengal Border) road (Length-27.608km.) into 2 lane with pave shoulder
RWD/DALTONGANJ/30/2022-23, Construction of Road from NH-75 Chiyanki Road to Amresh Yadavs House via Baiga Tola, Chandrika Singhs House Dashgatra Mandap (L-2.030 Km.)
Construction of P.C.C Road From Village Chota mahuldiha Tola Dhipasai NH-75 To Village Kasira tola Churlasai in Panchayat Chota mahuldiha at Jagannathpur Block under West Singhbhum District
PBMC work from Km 216.00 to Km 242.45 (Length 26.45 Km) and Km 251.40 to Km 290.6 (Length 39.20 Km) of NH-114A in the state of Jharkhand
Widening, Reconstruction of Existing Pavement to Two Lane with Paved Shoulder from Km 60.50 to Km 79.00 of NH-99 in the state of Jharkhand under EPC mode
Four Lanning of NH-114A from Km 65.500(Tower Chowk, Dumka) to Km 87.475 (Basukinath) (excluding 84.950km to 85.785km) in the State of Jharkhand under Hybrid Annuity Mode.
IRQP of Kolebira(SH-04)-Gangutoli-Jamdih (NH-143) Road (Part-A KM 0.00 to 10.36 and Part-B KM 22.00 to 38.95) (Total Length- 28.31 km) (Carriage-5.5 m)
Improvement of PCC Road from NH Highway to house of Kajal Mundu and Construction of RCC Drain from house of Kajal Mundu to main drain under ward No-12
Consultancy services for preparation of detailed project report for development of NH-133 from Km 94.00 to Km 131.00 in Dumka and Deoghar district in the State of Jharkhand
Laying of 3LPE coated carbon steel pipeline in the new utility corridor of NH 320B from Vill Maganpur to Gola, under Block Gola, Dist. Ramgarh, CGD Bokaro Geographical Area
Construction of Drain from baba Clinic to temple both side and shiv temple to main drain near NH in old katras topchanchi road in ward 01 under DMC Dhanbad
Laying of paver block from house of rajeev ali to NH-80 and slap at one side of that paver block at ward no -02 under Nagar Panchayat, Rajmahal
Complete repairing of SHANTHI Make Gear Box, type-SBH320F, Ratio-16/1, Sl.No-NH/01323 for controlling of crusher unit of feeder breaker no-1 of Muraidih, AMP Colliery.
Mid term measures for Road Safety in Dhanua Ghati section of NH 19 old NH02 from km. 249.525 to 261.150 Total Length 11.625 km in the state of Jharkhand
Reconstruction of CRPF Camp-Near Giridih Bust Stand-Officers Colony- S.P. Kothi (On NH-114A) Road (Total Length - 1.20 Km.) Under Road Division, Giridih for the year 2021-22.
Widening/Strengthening and Re-construction of Lokesai Main Road (NH-75E)- Tonto-Rengarahatu (Chaibasa- Tonto-Roam) Road (Total Length 25.105KM) under Road Division Chaibasa for the year 2024-25
Laying of Paver Blocks and other beautification works at Km 173(P) and 174 (P) (Near Dubey Baba Mandir) of NH-114A for the Shravani Mela year 2026-27
Complete Dismantling and Re-Erection of 70 Nos.11KV OH line poles from Bhurungiya check post to 4 poles near Kandra Panchayat Bh. and NH 32 to Pathergoria Incline in 15 No. feeder and Muchraidih Rly. Crossing in feeder no.1and2 due to NH 32 widening
RWD/EE/GODDA/11/2024-25, Construction of Road from NH-133 Phirojpur Patati Chak to Urja Nagar Coloni via Tagore School via Anganbadi Kendra Tak Sadak (L-1.400 Km.)
Reconstruction/Widening and Strengthening Four Lane work of Dumka Bypass on Phulo-Jhano Chowk, Dumka to Dumka Rampur Road (NH-114A) (Total Length-7.315 Km) for the year 2022-23.
Development of New A site RO within 5 KM from Tamar More at Khunti towards tamar on NH 143 AG (OLD SH-3) on Khunti -Tamar Road, Distt- Khunti, Jharkhand
Construction of PCC road from House of Vashishit Vishwakarma to House of Benjamin Dodrai at 22 Plot near NH-343 at Village Vishrampur under Panchayat Bishrampur block Ranka, District Garhwa
Construction of Service Road from Km. 35.840 to Km. 37.240 Both side in Barhi Hazaribagh Section Hazaribagh Bypass of the NH 33 in the State of Jharkhand on EPC Mode
Widening to two lane with paved shoulder from Km10.000 to Km 37.420 of NH-218 in the State of Jharkhand under EPC mode (Total Length of the project 27.420 Km).
Engagement of user fee collection agency on the basis of Competitive Bidding through ETender for Garhdevi FP at km 203.000 of Four laning between Km 196.870 (Sankha) to Km 219.600 (Khajuri) on NH39 in Jharkhand and Bihar
Engagement of user fee agency on the basis of EQ through etender for Navasari Fee Plaza in the state of Jharkhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency on the basis of EQ through e-tender for Medininagar Fee Plaza at Km. 156.850 of 4laning between Km 147.540 (Bhogu) to Km 196.870 (Sankha) on NH39(old NH75) (SecIII) in Jharkhand
Engagement of user fee collection agency on the basis of Competitive Bidding through E-Tender for Anjan Dham (Nagfeni) Fee Plaza in the state of Jharkhand
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway from Jn with NH320 in Lepo village to Kamlapur village (JH/WB border) from km 358.500 to km 387.200 under BMP in Jharkhand on HAM (Package 13)
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Bhabhua-Adhaura road in Bhairopur village to Konki village (from Km.54.000-Km.90.000 Pkg-3 Total Length 36Km) under BMP in the state of Bihar on HAM
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from junction with Chandauli-Chainpur Road near Khainti village to junction with Bhabhua-Adhaura road near Palka village (Km.27.000-Km.54.000) under BMP in Bihar on HAM
Four Laning of NH39 (old NH75) from design Km 147.540 (existing Km 148.020) (Bhogu Village) to design km 196.870 (existing Km 197.420) (Sankha Garhwa Road) in the State of Jharkhand on HAM (PKG-3)
Engagement of user fee collection agency on the basis of CB through etender for Medininagar Fee Plaza in the state of Jharkhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Anarbansalea village to Sagrampur village (From KM. 151.200 to KM. 184.700 Pkg-7 Total Length 33.50 Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Construction of 6-lane Greenfield Varanasi Ranchi Kolkata Highway from Donoreshan village to junction with NH20 in Bongabar village from km 288.600 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (PKG11)
Operation and Maintenance of 4 Laning of Kutchery chowk Ranchi Piska More Bijupara Kuru Section of NH75 (from Km.3.560 to Km. 55.000) and Piska More Palma Section of NH23 (from Km.3.600 to Km.26.000) (Length of 72.67 Km) in Jharkhand on PBMC mode
IE Services for Supervision of Const. of 6lane GF Varanasi Ranchi Kolkata Highway from Sonepurbigha vill. to junc. with NH100 in Deoria vill. from km184.700 to km253.000 under Bmp in Jharkhand on HAM
IE services for Four laning between Existing Km 55.000/Design km 59.000 (Kuru) to Existing Km 96.470/Design km 97.600 (Udaipura) on NH75 (New NH39) Sec I in the State of Jharkhand on HAM mode
CS for AE for Supervision of Construction of new link NH133B from Km 0.200 in Jharkhand to Km 15.885 including Ganga Bridge cons. of Manihari Bypass from 0 to Km 5.500 widening of NH131A from 5.500 to 6.000 in Bihar 4 lane standard on EPC Mode.
CS for preparation of DPR and Feasibility report for cons. of 4L tunnel and viaduct (205.26 to km 207.25 TL of tunnel 1.67 km and viaduct 320m) on NH33 and 4L spur connection from IWAI Sahibganj port to NH33(TL 2.8 including 1 ROB) in Jharkhand
CS for preparation of Feasibility study and detailed project report for up gradation of NH80 section from km 190.00 to km 215.00 into four laning including Sahibganj bypass(between km 197.00 to km 207.00)and from km. 260.00 to km 283.00 in Jharkhand.
IE Services for Construction and Upgradation to Four Lane from Manikpur (DC Km 0.000) to Sahebganj (DC Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call)
Engagement of user fee agency through etender at Tand Balidih Fee Plaza in the state of Jharkhand
Construction and Upgradation to Four Lane from Manikpur (Design.Ch. Km 0.000) to Sahebganj (Design. Ch. Km 44.650) section of NH139W in the State of Bihar on HAM Mode (2nd call)
6laning of Aurangabad to Bihar Jharkhand Border (Chordaha)Section of NH2 from km. 180.000 to km. 209.827 (PKGI) in the State of Bihar under Bharatmala on EPC Mode.
IE services for 4laning of Basukinath to Deoghar sec of NH114A from design Km 85.081 to design Km. 130.240(Design Length 45.159 Km.) in Jharkhand on HAM
IE Services for Supervision of Const. of 6lane GF Varanasi Ranchi Kolkata Highway from junc with Bhabhua-Adhaura road in Bhairopur vill to Konki village (from Km. 54.000 to Km.90.000) under BMP in the state of Bihar on Hybrid Annuity Mode
CS for AE for supervision of Construction of Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH75 including down ramp on NH23 from Km 0.100 to Km 0.600 in the State of Jharkhand on EPC mode
IE services for 4Laning of NH39 (old NH75) from design Km 97.600(existing Km 96.470)(Udaipura village) to design km 147.540 (existing Km 148.020)(Bhogu Village) in Jharkhand on HAM(PKGII)