Loading…
Loading…
894 results • Best match
Development of New A site RO(287) at Mouza-Bongabar, between Km stone 75 and 80 on NH-33 on LHS while moving towards Ranchi, Dist.-Ramnagar under Ranchi Divisional Office of BSO.
Special repair and other Works in Barmasia More (RCD Circular Road) to Hadhadiya Bridge (RCD Road) and NH-333 (VIP Chowk) to Parmeshwar Dayal Road under Shrawani Mela for the year 2025-26
Taking Out 450mm and 350mm Dia Rising Main, Supplying and Laying Of 450mm and 350mm DI K-9 Pipe Along NH-32 Near Nehru Park At Kenduya, Dhanbad Under JMADA, Dhanbad (2nd call)
Reconstruction work of Khairbani (on NH-133A) to Sanmani (on RCD, ODR Road) via Jhumarbandh, Dibrikol, Chhota Orsa Pahar Road (Total Length-7.580 KM) under Road Division, Sahibganj for the year 2023-24
Const. of PCC road in NH 143 from Mukesh Sahu Houses to Late Bihari Bhagat Houses and RCC drain with cover from Bihari Bhagat houses to Nitin Pathak houses at ward no. 02
Four Laning from Bokaro Sector -6 (Shastri Chowk) to Telmachcho (NH-32) Road (Total Length 5.965 Km) Under Road Division, Bokaro for the year 2025-26 (Job. No. CRF-JHR-2025-26-77)
RWD/RANCHI/35/2022-23, Construction of Road from Village Balsokra (Urdu Middle School) to Chandabar via Bidra Balsokra (NH-75) to Pahan Toli via Ansari Mohalla and Badi Masjid (L-5.00 Km.)
Widening and Strengthening/Reconstruction to 2-Lane with paved shoulder from km 12.400(Godda) to km 30.400(design chainage km 30.535) (Sunderpahari)of NH-333A in the state of Jharkhand under EPC mode
Dense Avenue Plantation Advance field preparation planting and maintenance works along Barhi Km 0.000 to Hazaribagh 40.500 of NH 33 in Jharkhand under PIU Hazaribagh Regional Office Ranchi in the State of Jharkhand
Rectification of identified Accident Black Spots using Long term measures from Km. 27.925 to 29.065 near FUDI (ii) from Km.39.000 to 40.500 near Baazartand on NH-75E in the state of Jharkhand
Carrying out independent road safety audits and suggesting rectification measures for black spots in the State of Jharkahnd.
Carrying out independent road safety audits and suggesting rectification measures for black spots in the State of Jharkahnd.
Consultancy Services for Preparation of Detailed Project Report for strengthening and widening of road from19th km of Churchu Hatyari Road to Tati Jharia Road of NH 522 including Replacement of Culverts and Bridges Proposal
IRQP Work of Kallu Chowk MDR-070 to Sindur NH-33 Via Mandai Khurd Road from Km.-0.00 to Km-8.362 Total Length-8.362 for the Year 2023-24 Under RCD Road Division Hazaribag
RWD/DALTONGANJ/28/2022-23, Construction of Road from NH-75 Chiyanki Secret Heart School via Agriculture Research Center via Pipal Tree via Panchayat Sachivalay Chiyanki to Main Road Chiyanki Park (L-2.868 Km.)
IRQP work of Jamdih in KM 33 of Singhpokharia Jhinkpani Serengsia Jagannathpur Jaintgarh to Hatgamharia NH-75E Via Kendposi railway Station (Total Length-7.68 KM) Under Road Division Chaibasa for the year 2023-24
Consultancy Services for DPR Preparation on EPC mode for Construction in km 109.7 to km 158.50 of NH-343 (Ramanujganj to Garhwa Road) in the State of Jharkhand including Land Acquisition and Utility Shifting
ELEC, XUPER- 660 NH, 4MM, 350MM
RWD/GODDA/17/STPKG/03/2023-24, Strengthening of Road from (i) P.W.D road Sikatiya to Dhodhri (L-4.225 Km) (ii)Kalyani to sabaijora (L-5.550 Km) (iii)NH Godda pirpainti to Saidapur (L-7.25Km)
Construction of Supplying, Laying and Fixing 80mm Thick M35 Grade Paver Block in Mango Ward no. 9 Brahma Path Near NH-33 From Chauhan Tower to Main Road Pandey nivas Throgh House to Chhotu Rawat.
Balance work of Median Plantation Advance field preparation, planting and maintenance works along Km. 113.700 to Km.140.000 section of NH 33 Package I under PIU Ranchi, Regional Office Ranchi in the state of Jharkhand
Widening and Strengthening/ Reconstruction of Matkamma Chowk(SH-2) - Pali - Sanki - Chuttupalu (NH-33) (Length-20.760 km) and Kodi Bazar to Chikor via Suddi link road (Length-4.430 km) including bridges, (Total Length 25.190 km.)
Short Term Maintenance Contract (STMC) work for the stretch from Km 39.10 to Km 85.56 of NH-143AG in the state of Jharkhand for the year 2024-25 (Job No.- STMC-JHR-2024-25-04)
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation/Upgradation from Lagam to Alapalli to 2L.PS / 4 lane configuration section of NH-353 C in Gadchiroli District in the state of Maharashtra on EPC mode
Consultancy Services for DPR Preparation on EPC mode for Construction of RoB at Railway level crossing in Km 40.30 of NH 218 near Bhowra in the State of Jharkhand including Land Acquisition and Utility Shifting
Consultancy Services for DPR Preparation on EPC mode for Construction of RoB at Railway level crossing in Km 37.80 of NH 218 near Manpur in the State of Jharkhand including Land Acquisition and Utility Shifting
Special Repair of Road 1. NH-99 Gonia to Sibla road ( L- 2.025 KM), 2. NH-99 to Chumba road ( L- 4.100 KM) and 3. NH-99 to Gurwe Road ( L-5.700 KM)
Dense Avenue Plantation Advance field preparation, planting and maintenance works along 4L of Palma to Gumla from km. 40.000 to km.54.000 of NH 23 under PIU Gumla, Regional Office Ranchi in the State of Jharkhand
Construction of RCC Retaining wall in 4th Km RHS of Hazaribag (St. Columbas College)-Churchu-Hatyari Mode (NH-33) (Total Length 30.08 Km), Under RCD, Road Division, Hazaribag for the Year 2025-26 (Under Non Plan)
Construction Supervision Consultancy Services for Widening and Strengthening/ Reconstruction of Matkamma Chowk(SH-2) - Pali - Sanki - Chuttupalu (NH-33) (Length-20.760 km) and Kodi Bazar to Chikor via Suddi link road (Length-4.430 km) including bridg
RWD/GARHWA/33/SRPKG-04/, (A) HASANDAG NAHAR TO KJRATH (L-2.780Km.) (B) NH-75 MERAL TO MERAL PURANI BAZAR VIA SARSWATI NADI SHAMSHAN GHAT (1.655 Km) (C) GARHWA CHINIA ROAD TO BHUYAN TOLI (2.115 Km)
Dense Avenue Plantation Advance field preparation, planting and maintenance works along 4L of Palma to Gumla from km. 26.000 to km.40.000 of NH 23 under PIU Gumla, Regional Office Ranchi in the State of Jharkhand
diesel generators- DG Sets Experience with Gov. Required 8 Year (s) Diesel Generators- DG Sets ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values * Bold specifications are the golden parameters. Consignees and ... 834002, NATIONAL HIGHWAYS AUTHORITY ...
I.R.Q.P work in NH-32 Saraidhela-Sugiadih to Hirak point Road (length 2.230 Km) And Central hospital to Co- operative colony Road (Length-1.30 Km) Total length 3.530 Km under Plan head for the year 2024-25
Development of A site RO start of Gridih District(while moving from Barhi to Gridih) till Kilometer stone number 339 on either side of NH 19 Old NH2 Sr.55 under Dhanbad DO of Bihar state Office
Widening and Strengthening Reconstruction to Four Lane Road of Starting Point Hazaribag bypass to End Point of Hazaribag Bypass Old NH Alignment under RCD,Road Division, Hazaribag Under CRIF Total Length 9.284Km for the Year 2025-26
Consultancy Services for DPR Preparation on EPC mode for Construction of Minor Bridges at Km 265 Pandaydih Km 268 Manjhidih and Km 277 Chhachando of NH 114A in the State of Jharkhand for the year 2021 22
Compact power supply l/P 120V/240V AC, O/P 24V DC, Output Current - 3.9 A, 95W, Cat No.- 1606-XLP95E . Suitable for ELGI air compressor Model no. NH 107. Make - Allen Bradley or Similar. Accepted make
Widening, Strengthening/ Reconstruction work of Ring Road for Digghi (Barharwa) NH-80 to Kesro (Barhait-Barharwa More) via Kumhariya-Buddi Pahar-Amberi Pahar-Chapandey Road (L-11.736 Km, C.W. - 7.0m) and Barmasiya to Maa Binduwasini Mandir Link road
Widening and Strenthening, Reconstruction work of Karamjora More (on NH-114A)-Genro-Patro River of Approach Road (on Jamui-Deoghar Road) (Total Length - 11.125 Km.) (Including Land Aquesation Work) Under Road Division, Giridih For the Year 2022-23
Consultancy Services for DPR Preparation on EPC mode for Construction of High Level Bridge over Damodar River beside existing Birsa Bridge at Km 39.700 of NH 218 in the State of Jharkhand including Land Acquisition and Utility Shifting
Reconstruction of Existing Major Bridge including Bridge approach from km 171.246 to km 171.774 on Ranchi-Rargaon-Mahulia Section from Km 114.000 to Km 277.500 of NH-33 in the State of Jharkhand on EPC Mode 3rd call
IRQP work in (i) Daladali chowk (on Ranchi Ring Road)- Prem Nagar (on NH-23) road ,(ii) Hazi chowk to Brambe road and (iii) Bijuliya chowk - Mahadev Tangra road (Total Length- 23.44 km) for the year 2025-26.
Improvement of Riding Quality -Strengthening work of (A) Hurhuri more chowk - Thakurgaon chowk (Length-10.40 KM) and (B) Brambe (on NH-75)- Thakurgaon- Ithe (Burmu road) (Length-8.40 Km.) (Total Length -18.80 KM) for the year 2021-22.
Construction of R.C.C drain and S/S/Fpaver block In, Mango ward No-9, Jawahar nagar road no.6 Rose colony Diff Cross Road, Mango Pardih NH Colony Salauddin House To MD Adil Rasid House And Different Cross Road.
Consultancy Services for preparation of DPR of Rehabilitation of Birsa Bridge in Km. 39.70 of NH-218 including Land Acquisition, Forest Clearance, Rand R and Utility etc. all complete work as per latest guidelines of MoRTH, GOI, New Delhi.
Consultancy Services for DPR Preparation for Widening to 4-lane with paved shoulder from Km 57.049 to Km 79.147 of NH-98 in the State of Jharkhand on EPC mode including Land Acquisition, Forest Clearance and Utility Shifting etc.
Cradling of 11KV O/H line 2 span (NH Road Crossing) and Erection of 2 span 550V O/H line (MMV room to IV seam UG incline mouth) for rectification of violation identified by DMS (Elect.) under ABG Colliery
RWD/GARHWA/32/SRPKG-03/2022-23, (A) NH-343 NARAYANPUR ANCHLA MORE TO ANCHLA GRAM (L-1.785Km.) (B) SUKHBANA GATE NO-6 TO GURDI GORA RIVER (5.590 Km) (C) KALYANPUR HIGH SCHOOL TO BALHI DAM KOTWARI HELIPED ROAD (2.310 Km)
Carrying out independent road safety audits and suggesting rectification measures for black spots in 1.Jorajam Silum, Gumla, 43 (Old NH- 78), 2. Patiratoli, Gumla NH- 78, 3.K.O college Palkot road, Gumla NH-143, 4.Ursuline School Between Johnpur, Gum