Loading…
Loading…
894 results • Best match
IE Services for Supervision of Const. of 6lane GF Varanasi-Ranchi-Kolkata Highway from Deoria vill. to junc with NH20 in Bongabar viLL from km253.000 to km325.500 under Bharatmala Pariyojana in the State of Jharkhand on HAM
IE services for 4Laning of Urga Pathalgaon section of NH130A from design Ch. 70.200 to Ch. 157.745 under BMP (Raipur Dhanbad economic corridor) in the State of Chhattisgarh on Hybrid Annuity Mode
IE Services for Supervision of Const of 6lane GF Varanasi-Ranchi-Kolkata Highway from junc with NH19 and Varanasi Ring Road near Rewasa vill. to junc with Bhabhua-Adhaura road near Palka vill(from Km0.000 to Km.54.000)under BMP in UP and Bihar on HAM
IE Services for Supervision of Const. of 6lane GF Varanasi Ranchi Kolkata Highway from Pachmon vill. to Sagrampur vill. (From KM.116.000 to KM. 184.700)under BMP in the state of Bihar on HAM
Construction of Elevated Corridor in Ranchi city from km 0.00 to km 3.570 of NH75 including down ramp on NH23 from km 0.000 to km 0.610 in the State of Jharkhand on EPC mode
Const of 4Lane CG/JH Border Gumla Bharda sec of NH43 from design ch.0.000 (Vill. Katkaiya) to design ch. 32.370 (Vill. Bharda) in the State of Jharkhand on HAM under Bharatmala Pariyojana
Construction of 6-lane Greenfield Varanasi-Ranchi-Kolkata Highway from Pachmon village to Anarbansalea village (From KM. 116.000 to KM. 151.200 Pkg-6 Total Length 35.20Km) under Bharatmala Pariyojana in the state of Bihar on HAM
Construction of 6lane Greenfield Varanasi Ranchi Kolkata Highway from Deoria village to Donoreshan village from km 253.000 to km 288.600 under Bharatmala Pariyojana in the State of Jharkhand on HAM (PKG 10)
Construction of 6lane elevated flyover inclu reconst. rehab of exist pavement Km 406.100 to Km 411.150 at Gobindpur area in the Barwa Adda Panagarh sec of NH19 from Km.398.240 to Km.521.120 inclu Panagarh Bypass in the State of Jharkhand on EPC Mode
Four Laning with paved shoulder of section from km 21.110 (Bokaro (Jaina More) on NH320) to km 53.600 (Gola on NH320) in the state of Jharkhand on Hybrid Annuity Mode
Construction of 4 Lane Bypass to NH114A Connecting NH333 and NH133(Deoghar Bypass) frm design km 0.000 to design Km 49.000(Total Length 49.000 km)in the state of Jharkhand on HAM
Engagement of User fee collection agency on the basis of EQ through Kokpara Fee Plaza in the State of Jharkhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee collection agency on the basis of CB through etender at Tand Balidih Fee Plaza in the state of Jharkhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Construction of Four Lane Urga Pathalgaon section of NH130A from design Ch. 70.200 to Ch. 157.745 (from Bhaisma to Taruama) under BMP (Raipur Dhanbad EC) in Chhattisgarh on Hybrid Annuity Mode.
Construction of 6lane Greenfield Varanasi-Ranchi-Kolkata Highway from Jn with NH20 in Bongabar village to Jn with NH320 in Lepo village from km 325.500 to km 358.500 under BMP in Jharkhand on HAM (Package 12)
CONSTRUCTION OF P.C.C ROAD FROM BAJRANBALI MANDIR NH-33 TO DEVI MANDAP TO RAILWAY CROSSING VIA PANCHAYAT BHAWAN MARAR AND VIA KARMALI TOLA , GOSAI TOLA TO MISHRA TOLA PHASE-II
CONSTRUCTION OF P.C.C. ROAD FROM NH-33 BAJRANG BALI MANDIR TO RAILWAY CROSING VIA PANCHAYAT BHAWAN MARAR DEVI MANDAP AND VIA KARMALI TOLA, GOSAI TOLA TO MISHRA TOLA, PHASE- I
Widening and Strengthening Work of Meharma bypass starting from Sidhokanho Chowk to meet at Ch. 11.2 at Meharma from Km 9.300 to Km 11.200 of NH-133 (total Length- 1.710 Km).
Widening and Strengthening/Reconstruction of Chaipani (on NH-114A) to Mashniya (Aamgachhi to Kalyanpur Road, on ODR) Road (Total Length-6.670 Km) under Road Division Dumka for the year 2024-25
Construction of Covered drain at One side of PCC Road from NH-33 (Transformer ) to the House of Basudeo Saw (Bandh) at Mandudih under CSR19-20 Pundi Project of Kuju Area.
Development of New A site RO from KM stone no 11 to 14 on NH 23 while moving towards Gumla, Distt- Ranchi, Jharkhand under Ranchi Divisional Office of Bihar State Office
Consultancy services for preparation of Detailed project report for construction of road Village Dadha Saamtoli More (on Ranchi Gumla road (NH) to Ambera PWD main road via Amboa under Sisai Block
CONSTRUCTION OF P.C.C. ROAD PART III 1400x10 FROM NH-143 NEAR POLICE LINE BOUNDARY WALL TO TOWARDS THE LAST BOUNDARY OF NAGAR PARISHAD IN WARD NO 04 UNDER NAGAR PARISHAD SIMDEGA.
Construction of bypass around Giridih town of NH-114A to 2 lane with paved shoulder from Km 0.000 to km 23.835 (Design chainage) in the State of Jharkhand under EPC Mode
WIDENING AND EXISTING RUB (RAIL UNDER BRIDGE) BRIDGE NO.-1. GAYA BRIDGE OF RAILWAY AT KM 12.00 OF NH-32 IN DHANBAD UNDER DMFT FUND FOR THE YEAR OF 2023-24.
Temporary Arrangement of street light on Basukinath Ring Road, Shivganga Road and Parking near NH at Basukinath, Dumka on the occasion of Shrawani Mela 2026 from 29.07.2026 to 28.08.2026 (31 days).
Construction of Ramps Slip Roads to Kothar Bridge from km 89.500 to km 90.000 on NH 33 for rectification of Ministry identified Blackspot JH 02 33 in the State of Jharkhand
Widening, Strengthening and Reconstruction work of Kothiya (NH 133)-Dighi-Gadi Jhopa-Parariya-Champagarh Road (Total Length-17.2015 Km) for the year 2025-26. Job No. CRF-JHR-2025-26-73
Dismantling, Re-erection and Extension of section of 440V, 2 phase 3 Wire Overhead Distribution Line along NH-side from South Govindpur Sub-station under South Govindpur Colliery, Govindpur Area-III
IRQP/Strengthening work of Lalbandh (MDR-210) to Mohanpur (NH-80) Road via Babupur and Jonka Link Road (Total length-14.305 KM) under Road Division, Sahibganj for the year 2024-25
BSO ENGG Development of new A site RO (143) From Km Stone 145 And 150 On LHS On NH 33, Dist Ranchi, Jharkhand, under Ranchi Divisional Office of Bihar State Office
Carrying out independent road safety audits and suggesting rectification measures for black spots in 1.Jashpur Road Kali Mandir, NH-78 2.Dubdubi More NH-78 3.Bazar Tand ,Silam Raidih,NH-78 4.Silam, Gumla-Jashpur Road, NH-78 5.Jorda Jaam, Gumla,NH-78
Widening Strengthening and Reconstruction Work of Ishakpur Saithankhana More to Manirampur Chandpur on NH 133 A Road and Link Road Length 10.145 KM for the Year 2021-22. Under Road Division, Pakur.
Diversion and erection of 440V Overhead line which was previously power supplied through 190sqmm, underground cable to NH Road side BCCL Quarter, Surendra Market,Sinidih Colony and Sinidih Basti under Govindpur Area
BSO ENGG Development of New A Site RO within 5 Kms from Jarmundi Chowk towards Deoghar on either side of NH 114A, District- Dumka under Dhanbad Divisional Office of Bihar State Office.
Development of New A RO at Location Between Milestone 43 To 46 on NH 43 Saraikela Kandra Road Old SH 05 Serial No 27 under Ranchi Divisional Office of Bihar State Office
REPAIR ROOFING CEILING FLOORING AND CERTAIN B/R WORKS AT KHOJATOLI POCKET AND REPAIR/ REPLACEMENT OF PLASTERING FLOORING SANITARY FITTING ETC 12 NOS NH SURFACE OF SHO AREA NAMKUM UNDER GE RANCHI
Reconstruction work of Baba Ji Kutiya More (On SH-13)-Mugpiti-Narendrapur Open Cast Mines-Paparwatand (On NH-114A) Road (Total Length - 6.05 Km.) (With Land Acqujition) For the Year 2022-23
Construction of Box Cell Culvert (8x5m) and Protection Wall in Approach Road of Shiv Ganga to NH 114A at Basukinath Dham under Non Plan (Shrawani Mela 2024) for the year 2024-25.
(a)IRQP of Ghatshila Link Road (Length 1.175 KM ) (b)IRQP of Ghatshila Market to Kashida Chowk on NH-33 and Extending the Other Part to Civil SDO Office (Length-3.383 KM )
Construction of PCC road from NH-33 Murpa kuju bypass to durga mandir via kuju koylari to house of rajita keshri in black top road, vill/G.p-Murpakuju, Block-mandu ,Dist- Ramgarh.
Construction of P.C.C. road from Shivshanker Chawrisya house to Mahabir oraon house via Swayambhu Mandir , Shachi Devi house to Dillip oraon house and NH Road) to Teli Dharamsala in ward no 21
Special repair and other Works in 2nd KM of Seeta Hotel (Sheetal Mallick Road) to NH 114 A Via Bilasi Road (Length 1.70 KM) under Shrawani Mela for the year 2026-27
DEVELOPMENT OF NEW A SITE RO P.S. VASHISHT NAGAR, BETWEEN KM STONE 24 TO 29 ON NH-99 TOWARDS ZORI, DIST. - CHATRA, STATE JHARKHAND UNDER RANCHI DIVISIONAL OFFICE OF BIHAR STATE OFFICE.
Handling, Transport and Other Mining Services - Percentage quote based - Rate Contract for Pond Ash Transportation from NKSTPP Ash Pond to NHAI PWD Road Construction Sites
RECONSTRUCTION OF APPROACH ROAD AND FOUR LANE BRIGDE OVER RECONSTRUCTION OF APPROACH ROAD AND FOUR LANE BRIGDE OVER SWARNREKHA RIVER AT 2ND KM OF BHUIYADIH LITTI CHOWK TO BHILAI PAHARI NH -43 LENGTH 3.681 kM - 2024-25
Carrying out independent road safety audits and suggesting rectification measures for black spots in the state of Jharkhand
IRQP/ Strengthening work of Road from 16th km of Godda- Pirpainti road at Doe to 31th km of Godda- Pirpainti road at Diyajori chowk via Amoar, Khiroandhi, Khatti, Balbadda, Marpa, Madhura Road (Total Length- 28.00 Km) under Road Division, Godda.
Reconstruction of NH-23 to Radhagaon Railway Station via BPCL LPG Plant and Retail Depot Road (1.879 km out of total Length 7.179 km) for the year 2023-24 under Road Division, Bokaro
Development of New A site RO within 3 KMS from DC Office gate Chaibasa towards NH-220 on chaibasa bypass road , Distt.- West Singhbhum, Jharkhand under Ranchi Divisional Office of Bihar State Office