Loading…
Loading…
3,606 results • Best match
Construction of New RCC Drain with RCC Chamber and cover slab from Km. 181.550 to Km. 181.640 (LHS) of NH.26 for the year 2025-2026
Improvement of NH-149 to Srikantpur via Gotamara-Salagadia road from 1/200 km to 3/888 km in the district of Angul under State Plan
S/R to NH-5 to Khajiripur road from 2/000 km to 2/245 km in the District of Jajpur for the Year 2025-26.
S/R to road from NH-6 to Khairdihi Road for laying SDBC and Pavor Block in the District of Sambalpur for the year 2023-24.
Strengthening to NH-326(A) from km(70/000-102/900) in the state of Odisha for the year 2019-20 (07 CENH of 2019-20)
Strengthening the existing B.T. carriageway from Km 338/450 to 351/113 of NH-59 inside Berhampur city in the state of Odisha on EPC basis
Improvement to L038 NH-5 Kimbhiripada to Lambodarpur road in the Dist. of Khordha under MMSY- Impvt. to Existing RD road for the year 2025-26
Improvement to NH-5 to Patrapada via Sarakantara Road in the District of Khurda under MMSY-Improvement to Existing RD Road for the year 2025-26
Improvement of L057-NH 5 to Janakideipur Road Road under MMSY-Improvement to Existing RD Road in the District of Mayurbhanj for the year 2025-26.
Improvement to L-029 NH-201 to Bagjore Road in the district of Bolangir under MMSY-Improvement to Existing RD Road for the year 2025-26
Construction of Road NH-16 to Belamala Village Road Via- PWD Road Barikpur under MMSY- TRIP in the Dist. of Bhadrak for the year 2023-24
Const. of H.L.Bridge over Drainage Nallah on JTR (NH-316) to Poparanga Pachalpur road in the dist. of Puri for the year 2021-22 under BSY.
Construction of Road from NH-49 to Ramatirtha (Crocodile Project-Cum-Eco-Tourism Complex) under OMBADC in the District of Mayurbhanj for the year 2021-22.
Construction of H.L. Bridge over Local Nallah at 1st Km on NH-60 to Gohiraguda road in the District of Balasore under BSY for 2022-23
Construction of Bridge over Kukudakhumpi at 1.400km on NH-18 to Jamda (PMGSY Road) in the District of Mayurbhanj under BSY for the year 2023-24.
Construction of road from NH-60 to Ranamundali Road in the District of Balasore under MMSY-Improvement to Existing RD Roads for the year 2025-26
Widening and Strengthening of from NH-53 to Reamal via Kansar from Km 27/000 to 37/855 Km in the district of Deogarh under CRIF
Construction of Byepass road connecting NH-55 (RTO Office Square) to Angul-Chhendipada (SH-63) (Majhika) for a length of 4.500 km under MCL Deposit Scheme
Periodical Renewal to NH-316 from 28/500 to km 33/00 and Km 35/500 to km 48.000 (Puri -Satapada) in the State of Odisha
CONSTRUCTION OF CEMENT CONCRETE ROAD WITH SIDE DRAIN OVER COVER SLAB AND RCC CULVERT FROM NH 26 TOWARDS ELECTRICAL OFFICE AT COLLEGEPADA IN WARD NO 02
Construction of Underpass at LANGALKANTI from km. 88.690 to km. 89.470 on Panikoili Rimuli section of NH 20 in the state of Odisha on EPC Mode
Construction of 6L LVUP at Binjhabahal along with approach road in Singhara binjabahal section of of NH 49 in the state of Odisha on EPC Mode
Construction of 2 no of FOBs at Satsang Vihar and Nayapalli on Chandikhole Jagatpur Bhubaneswar of NH 16 in the state of Odisha on EPC Mode
Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 60.000 to 113.300 PKG II in the state of Odisha
S/R to road from NH-200 to Bamandagarh Ch 1/500 to 7/665 Km in the district of Sambalpur for the year 2026-27.
S/R to Road from NH-200 to Khuntlabahal Ch-0/000 to 1/530 KM in the District of Sambalpur for the year 2026-27.
Repair to Bridge over Mendhakhai on 2nd km on NH-5 Champapur Anandabazar road_Road_Approach road with PMC and Seal coat, painting,Boulder pitchingRA-0.000 to 0.500
Construction of New drain in Balisira from km 144.100 to 145.000 km (RHS) of NH-157(left over by EPC project) for the year 2025-26
Construction of HL Major Bridge across Dahuka River at Km 226.377 (Design Chainage) of NH-57 including approaches in the state of Odisha on EPC mode
Improvement to Colony road from NH to Division office at Rengalbeda and PWD office to Sub-Division office at Dam site under Deogarh Irrigation Division, Deogarh.
Construction of NH-16 to Binchanapalli via Purunabandha, Pallibandha, Gokharkuda to PMGSY road in the District of Ganjam under MMSY-TRIP for the year 2023-24
Impvt. to NH-5(Janla Outpost) to Dariani temple via. Uttar Mundamuhana road in the dist. of Khurda under State Plan for the year 2020-21
Construction of Road from NH-217 to Sindhibahali Road under MMSY-Improvement to Existing RD Roads in the district of Bolangir for the year 2024-25
Improvement to NH-217 to Satakutuni via Badagumula road in the District of Ganjam under MMSY-Improvement to Existing RD Road for the year 2024-25.
Improvement to Gopal Jew Temple to NH 203 Road in the District of Puri under MMSY-Improvement of Existing RD Road for the year 2024-25
Construction of road from NH-5 to Nereda Road in the District of Bhadrak under MMSY-Improvement to Existing RD Roads for the year 2025-26
Construction and Maintenance of Champapur on NH Gopapur to Kelakata at Boudh Dhalapur RD road in the District of Boudh under Transferred Road Improvement programme (TRIP)
Impvt. To NH-215(Baliguda) to Baliaposi via Bhaliadihi road from ch-2/585 km to 2/660.7 km under CWA for the year 2019-20
Construction of road from NH-49 to Netidihi road under scheme Mukhya Mantri Sadak Yojana (MMSY) in the district of Jharsuguda for the year 2026-27.
Improvement to NH-217 to Narendrapur via Naupalli road in the District of Ganjam under MMSY-Improvement to Existing RD Road for the year 2025-26
Construction of NH-18 Asanjoda Girls H/S to Palasbani via Badjanbani road under MMSY-TRIP in the District of Mayurbhanj for the year 2023-24.
Construction of H.L. Bridge over Handighosh Nallah at 1st Km on NH-60 to Gundrisahi road in the District of Balasore under BSY for 2022-23.
Construction of road from NH-49 to Kandadehi road under scheme Mukhya Mantri Sadak Yojana (MMSY) in the district of Jharsuguda for the year 2026-27
Strengthening of Pavement with DBM and BC of Panikoili Rimuli section of NH 20 from km 113.300 to 166.173 PKG III in the state of Odisha
Construction of road from NH-26 to Sandaibhata under MMSY-Connecting Missing Road Links (MMSY-CMRL) in the Districts of Nabarangpur for the year 2025-26
Construction of Bridge over river Kulerjore on Nh-53 to Bhoitikira road in the district of Sambalpur under Setu Bandhan Yojana for the Year 2024-25.
S/R to road from NH-6 to Bandhabhuin Ch 0/000 to 1/443 Km in the district of Sambalpur for the year 2026-27.
Repair to Bridge over Banuguni Nallah at 4.500 KM on NH-23-USRA- to Kheraposh road Road Painting,wearing Coat-Mastic Asphalt-,Retaining wallAt 4.500 Km
Construction of road from NH to Lathiguda road via Barniput Badiguda Nuageda Dangarabeda under MMSY-TRIP in the District of Koraput for the year 2025-26.
Construction of HL Bridge over Mandamba Nallah at 0/047 km of NH-55 to Mandamba in the district of Angul under State Plan for the year 2022-23