Loading…
Loading…
3,616 results • Best match
Improvement to Old NH 5 passing through Bhadrak Town (MDR 85) from 0/600 km to 2/000 km In the District of Bhadrak under State Plan for the year 2019-20.
Improvement to Riding Quality of ROB at Mancheswar at L.C. No.188 SPL-3E at RD 433-23.25 of Howrah-Chennai Railway Line. at RD 1.200 Km from NH-203 Bomikhal Square
Improvement such as widening and Strengthening to defunct NH-53 from 384/700km to 387/200km (inside Bhuban Town) in the District of Dhenkanal under State Plan for the year 2022-23
Construction of internal drain of Park Lane Khandagiri besides NH-16 and from Satya Sai Enclave to Brundaban Garden to Drain no. 9 including integration of internal drain in ward no. 49
NH-6 to Bisoi Hill Block Road Road Renewal coat SDBC and Side shoulder 0.266 to 0.643 0.795 to 2.195 2.500 to 3.013 3.120 to 4.322 4.570 to 5.075 5.125 to 5.447
Improvement such as widening and strengthening of NH-6 to Jamardihi road from 11/00 km to 18/00 km in the District of Angul under State plan for the year 2022.23
SR to NH 316 Puri Satapada Link such as providing 30mm thick BC from Km. 0.900 to 2.750 Km. and Km. 7.00 to 8.450 Km. in stretches for the year 2021 22.
Improvement such as widening and strengthening of Kantabanji-NH-59 Haldi via Chaulsukh-Pangnia-Muribahal road from 0/000 km to 23/984 km in the district of Balangir under State Plan
Construction of shoulder on both sides of road along NH-149 on a length of 2.5 Km between Pabitra Mohan Chhak to Bankadhara Chhak, Lingaraj Area as a CSR initiative of MCL
Construction of Bridge over Local Nallah on NH to Raniganja village road under Harabhanga Block road in the District of Boudh under BSY for the year 2023-24 (Span 1 x 32.04m)
SR to NH 5 A at Krushnadaspur to Udayagiri Ratnagiri road such as providing renewal coat with SDBC from13.450 to 13.600, 15.450 to 15.700 and 16.200 to17.300km. For the year 2019-20
S R to NH 215 to Balijoda to Baliposi via Bhaliadiha Road from ch 3 200 to 3 900 and CD 1 no at ch 3 700 for the year 2022 23
Construction of NH-59 to Jakabahali PMGSY Road in the district of Kalahandi under MMSY-Transferred Road Improvement Programme (MMSY-TRIP) in the district of Kalahandi Schemes for the year 2024-25
Shifting of Electrical utilities of NH-5 Puri main Canal Crossing to Balianta Bazar from 0.0KM to 1.600 Km due to widening and strengthening of the road for the Year 2022-23.
S/R to NH-59 RDC Residence Womens Home PWD IB near ROB Road such as Pothole repair from Ch-0/00 km to 1/300 km for the year 2025-26.
S/R to NH-215 (Janha Chhaka) to Pahanga Road Via- Khamana, Thakurpatana from CH- 2/400 km to 2/776 km in the District of Jajpur for the Year 2023-24.
Improvement such as widening and strengthening to 4-lane standard of Defunct NH-5 (Tangi Road) from 0/000 Km to 4/700 Km in the District of Khordha under State Plan
Improvement such as widening and strengthening of PWD Road to Dianpada via-Nabaghanapur to NH-57 from 0/000 km to 4/780 km in the District of Nayagarh under State Plan
Construction of RCC Box Cell Culverts at 14/960 km and 17/710 km on Ring Road from Tamando Square on NH-16 to Paikarapur in the district of Khordha under CRDP
Construction of Black Top road over existing moorum road in between oil odisha and IDCO land from NH-5 to back side of IDCO Plot No.D-24 at Khorda Industrial Estate, Khorda.
Improvement such as Widening and Strengthening of NH 217 to Narendrapur extended to Patharapunji chhaka road (ODR) from 0/000km to 7.890km in the District of Ganjam for the year 2024-25
Periodical Maintenance of 5 years completed PMGSY roads such as (A)L-43(Harachandi) to Sipasarubali(B)PWD road to Nishibaran and (C)NH-203A to Kahalapada under Package No.PM/PURI/31
Construction of H.L. Bridge over Local Nallah Huluhulia Nallah at 0.32Km on Foot over bridge on NH-60 to Nagram G.P. road in the District of Balasore under BSY for 2022-23
OSO ENGG DEVELOPMENT OF NEW A SITE RO AT LOCATION WITHIN 3 KM FROM PAPERMILL JUNCTION, JEYPORE TOWARDS BODIGUMA ON NH-26, DIST-KORAPUT, Under Sambalpur Divisional Office of Odisha State Office
Electrical works for illumination of street light at Chandanpur Bypass End, Service road of Sakhigopal VUP and Daya River Bridge on Bhubaneshwar- Puri section of NH-316 in the State of Odisha
Improvement of NH 217 (Bhalumunda) to Mahakhand road from CH 0/000 km to CH 8/961 km (ODR) in the District of Bolangir for the year 2023-24 under state plan.
Repair to H L Bridge over Machhakandana on NH 215 to Ambuapada via Bhaliadihi_Road_Mastic asphalt -wearing coat- Boulder pitching, Pot hole repair in approch road, Railing repairing and Painting etc_At 4.000 km
OSO ENGG DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN GOVINDPALLI FOREST GATE AND BALIMELA CHAWK ON RHS OF NH-326, DIST-MALKANGIRI, UNDER SAMBALPUR DIVISIONAL OFFICE OF ODISHA STATE OFFICE.
Widening to Double Lane with Paved Shoulder from Km. 294.280 to km. 319.280 Nabarangpur to Borigumma of NH 26 for the year 2019-20 in the State of Odisha on EPC mode.
P/R to NH-157 such as overlaying of Bituminous Concrete over existing BT surface from Km 81/0 to 91/0 for the year 2020-21 in the state of Odisha
Improvement to PWD road from Sinkhaman (connecting Balangir - Titlagarh NH to Deogaon) to Bhutiarbahal and Bhutiarbahal to Dhandamal from 0.0 to 10.870km in the District of Balangir for the year 2025-26
Construction of RCC box cell Drain from NH Culvert near Symphony all to toe of Puri Main Canal Left Embankment via Plot no 116,115 and 114 of Rudrapur Mouza Ward no 4
Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode.
Improvement such as widening and strengthening of NH-55 to Jujumura via Langabahal Andahari and Lipinda from 0/000 km to 10/280 km in the district of Sambalpur under State Plan
Construction of 11 KV, LT Line and S/S due to Improvement of NH -149 (Kulei) Manikamara-Jaka Road from 0/0 Km to 10/420 Km in the District of Dhenkanal
Construction of Pedestrian Underpass Box Culvert Minor Bridge and other Road Works between Km 34.510 to Km 35.100 near Vellora Chawk on NH 60 Balasore Kharagpur Section in the State of Odisha
Improvement such as widening and strengthening of NH-49 Thianal Chowk to Marha via Saruali road from 0/000 km to 18/750 km in the district of Deogarh under State Plan
Re-alignment of IWSS water pipeline from Railway gate near Renua to Zero point (Coal corridor NH- Junction) for supply of water to MCL Challan point and Talabeda village under Lingaraj Area.
Periodical Maintenance of 5 years completed PMGSY roads such as (a)Badaberana to Gomapur(b) Niamuhana to Goda via. Chhania(c)NH-224 to Dhanagar Nuagaon Sunalo under package No.PM/BBSR/40
Construction of Road from Nuapada NH-16 to Atapur via Raghunathpur patna PMGSY road in the District of Balasore under Special Assistance to States Capital Investment (SACI)for the year 2023-24.
Construction of connecting PCD road near Sai Mandir at Raghunathpur village and Chandaka Pitapali NH along the Southern boundary of Nandankanan Sanctuary in the Dist. Of Khordha for the year 2024-25.
Consultancy services for Construction of Jharsuguda Bypass including ROB including land acquisition on NH-49 from km 258.636 to km 283.300 design chainage 258.636 to km 289.876 in the state of Odisha.
Const of Drain at Ainlapali on NH59