Loading…
Loading…
3,616 results • Best match
P.R to NH 316 from Km.8.500 to 28.500 Puri-Satapada Link and Km.61.900 to 81.900 Km Puri Konark Link for the year 2019 20 in the state of Odisha on EPC mode.
Construction of road side drain along NH-326 near newly constructed police quarters of OSAP 4th (SS) battalion, Malkangiri from Km 420/010 to 420/530 (RHS), Malkangiri town for the year 2025-26.
Improvement to BT Road from NH-55 to project side (RD 00 M to 1840 M) of Khajuripokhari MIP in Athagarh Block of Cuttack District under CAPEX ROAD scheme for the year 2025-26.
S/R to NH-59 such as construction of rod side concrete drain with cover slab at km 343.600 to 343.850 km and 343.925 to 344.175 km in stretches for the year 2025-26
Improvement such as widening and strengthening of Kanika PWD road to NH-49 Vhikampali via Lipaspali and Julumbahal from 0/000 km to 21/800 km in the district of Sundergarh under State Plan
Improvement of NH Toyaput to Koraput via Dasamantapur Lulla road from 0/000 km to 5/200 km and 25/236 km to 34/917 km in the district of Koraput under State Plan
S/R to NH 157 B to Helei via Belataila road such as construction of 2x1000 mm. dia Hume pipe culvert at 6/375 km and 6/460 km for the year 2021-22
Construction and maintenance of road from NH-326 to Sargiguda via Rukniatal Disariguda, Tanginigadana road in the District of Malkangiri under Connecting Unconnected Villages in Difficult Area (MMSY-CUVDA) for the year 2024-25
Shifting /relocation of existing electrical SS, HT and LT Lines due to construction of alternative road from NH-53 to Balichandrapur from 0.00 km to 0.480 km by (R and B) under Chhatia Section
Construction of Bridge and Weir adjacent to Bridge over Bauri Nallah at 1st Km on NH-55 to Jeeranga Dehury Sahi road in the District of Angul under SBY for the year 2024-25.
S.R to damaged wearing coat of Mahanadi Bridge located within Ch 114.024 to Ch 115.882 km of NH-153 B by providing 50mm thick Bituminous Concrete in single layer for the year 2023-24.
CLEARING OF WATER HYACINTH IN SALANDI AND NALIA RIVER BED AT (GOBINDAPUR, GABASAHI, NH-16, NARIPUR, RAJGHAT, KUANSH ,SANTHIA, DHANATOLA, GANDHI GHAT, GARADAPUR, DURGAPUR, MOUDA, UTTARBAHINI PWD BRIDGE, UTTARABAHINI PARIDA SAHI, AHARAPADA, BARIKPUR, S
Improvement of NH-42 to Ogipara Tainsi Jagannathpur road (ODR) from 23/100 Km to 25/000 Km and 28/500 Km to 29/500 Km under State Plan for the year 2022-23
S/R to NH-215 ( Janha Chhaka) to Pahanga Via- Khamana, Thakurpatana) Road Ch from- 2/800 km to 3/300 km in stretches for the Year 2024-25 in the Dist. of Jajpur.
Improvement to road from Saradhapur chhak on NH-149 to Bela chhak on Kantiapashi - Kunjam road via Paunsia from 0/000 Km to 6/000 Km in the district of Angul under State Plan
Repair and Restoration work to defunct NH-316 From Rasulgarh Square to Laxmi Sagar Square from RD 0.00 Km to 2.100 Km both side due to heavy rain fall during the year 2024-25
Construction of Bolagarh Block Chhak (NH-57) to Baghua Pokhari,Nandapalli via Budhabudhiani Temple road Road in the District of Khurda under MMSY-Transferred Road Improvement Programme (MMSY-TRIP) for the year 2025-26
Periodical Maintenance of 5Yrs. Completed PMGSY Roads-A-Kusumita to Talakampadihi, B-Nuagan to Hatikucha, C- NH-215 to Jogimatha, D-Patung to Kalanda, E-P.W.D Road to Kanchandumuria in the District of Keonjhar.
Approach Road (4 lane) from NH-55 and Internal Peripheral Spine Road (2 lane) with Drains and Street Lights and Junction Development and Gate without roof to IDCO Industrial Area at Choudwar, Cuttack, Odisha.
Improvement such as widening and strengthening of Chandanpur (at NH-49) to Sankhabhanga road via Bedhakudar and Joka from 0/000 km to 18/660 km in the district of Mayurbhanj under State Plan
Improvement to road from NH-49 Ganthibud to Katapali via Kuturcha from Ch-0/000 Km to Ch-2/000 Km in the District of Jharsuguda under State Plan for the year 2019-20
Improvement such as widening and strengthening of road from NH-26 to Randapalli, Sanakaudi, Badakaudi, Ekamba, Railway Station from 0/000 km to 7/120 km in the district of Koraput under State Plan
IMPROVEMENT OF ROAD SAFETY THROUGH PROVIDING THRIE METAL BEAM CRASH BARIERS FROM KM 311/900 TO KM 312/900 OF NH-326 IN THE STATE OF ODISHA UNDER ROAD SAFETY ANNUAL PLAN 2022-23.
S/R Hanspal- Banamalipur to abhayamukhi road such as Village approach to Andilo at RD-1/583 Km at RD-1/584 of NH-5 to Jayadev Pitha, Bhubaneswar for the year 2022-23
Improvement of road from NH-203 to Gadamahavir Chhak (Garage Chhak to Sisupalgarh)from 0/000 km to 1/138 km in the district of Khordha under State Plan for the year 2025-26
S/R to NH-5 to SP Office to Khandarapur via- Panikoili, Altiri, Kankala Patala, Khajiripur road from 0/640 to 0/945 km in the District of Jajpur for the Year 2025-26.
Improvement such as widening and strengthening of NH-215 (Salapada) to Patharada via Sarein Bhagani and Madaupur road from 0/000 km to 11/380 km in the district of Keonjhar under State Plan
OM work of selected stretch of total length 66.507 Km including incident management services in Balasore Baripada Jharpokharia section of NH 18 from Km 0 to 80.60 in the state of Odisha 2nd Call
Development and Maintenance of Potholes-free roads and Covering of slab in open drain in RMC road (NH service road to IPS School via Arnold School) of Ward No.13 under Sambalpur Municipal Corporation.
OSO ENGG Development of new A site RO at location within 5 km from Ambedakar Chowk Khariar towards Titilagarh on RHS on NH-59 District Nuapada under Sambalpur Divisional Office of Odisha State Office.
Improvement such as widening and strengthening of NH-55 to Saplahara via Kumka Dadalmunda Khairmal and Kulsar road from 0/000 km to 13/460 km in the district of Sambalpur under State Plan
Development of New A Site RO at Location Deoghar New Byepass on NH49 Old NH 6 on RHS while going from Sambalpur towards Keonjhar Dist Deogarh under Sambalpur Divisional Office of Odisha State Office
Construction of H.L.Bridge over Kalipen River at 1st Km on Kundaidara on NH-59 (Mahasingh) to Sainipada road in the District of Kandhamal under BSY for the year 2023-24 (Span 4 x 25.36m)
SR NH-217 to Phatamunda Road Pothole repair with PMC and SC, Berm filling, Painting to culverts, Flank dressing, Fixing of road furniture 0.000 to 2.000 under Muribahal Block for the year 2026-27
NH-16 to Prayagi via Kantiagada
L032-NH 157 (Sanaadabadi ) to Majaganda
Construction of 03 nos. of VUPs at Km. 429.570, Km. 429.961 , Km. 430.380, along with Approaches and Service Roads near College Square and DRDA square in Puintola to lcchapuram Section of NH 16 in the State of Odisha on EPC Mode.
OR-05-402/B-II, NH 217 at Tarasingha to NH 217 at Chormara via Thubding , Balpadar ,Ghukhrunga, Kengmundil
Construction of RCC Drain from 0/000 Km to 2/575 Km on Original Defunct NH-215 (Lahangapada to Rajamunda Chowk) road in the district of Sundargarh under State Plan for the year 2024-25
Improvement such as widening and strengthening of road from Electric office Chawk (Old NH-53) to Kalpana-Gundichanali PWD road at Kamakhyanagar in the district of Dhenkanal under State Plan for the year 2023-24
Strengthening and widening of Suakati - Dubuna - Kalimati Road NH-49 to OMC mines from Ch. 0/000 km to Ch. 3/400 km in the District of Keonjhar for the year 2022-23 under CSR
Construction of RCC retaining wall along with sand filling to safe guard the road of NH-5 to Ardalua from 3/250 km to 5/940 km in the district of Jajpur under State Plan
SR to NH 316 Temple Link such as laying 30mm thick BC from Km. 0.000 to 1.600 and Km. 59.000 to 59.900 in stretches from Temple Office to Gundicha Temple for the year 2025 26.
Rectification of accident prone area with widening of curve and Re-alignment to the road of Jeypore ghat area at ch. 349/000 and ch. 347/800 of NH-26 in the State of Odisha
Repair to Old NH-5 Balasore Bye Pass Road Anada Bazar Chhaka to Nuniajori Bridge from7.00 km to 8.200 km for 2019-20 Such as Cleaning B.T. surface Tack coat B.M. SDBC and Road Marking
Shifting and Construction of 11 KV 3 Ph 3 W Line from existing alignment on the road MRL.16- NH-16 to CHASANGARA BLOCK BOUNDARY under PMGSY-III-B-II Package No-OR-18-218
Improvement such as widening and strengthening of Sribantapur to NH-16 via Khanditara, Sanatrilochanpur (OAE on Kharsua right) road from 0/000 km to 11/840 km in the district of Jajpur under State Plan
Repair to Old NH-60 Jaleswar Byepass Road such as repair to carriageway with SDBC from 4.000 km to 6.800 km , 10.550 km to 11.350 km and 12.600 km to 13.500 km for 2019-20.
Improvement such as widening and strengthening of NH-353 Airport Chowk Sarabong via Dumerpani, Bhajipala, Bhaisamundi, Silda and Haldi from 0/000 km to 8/000 km in the district of Nuapada under State Plan