Loading…
Loading…
106 results • Best match
A M I No -14.191/2024-25 Cap/Tab Imipramine 25mg, make/brand -ANTIDEP 25 MG TAB, Mfg by- TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH 10, East District, Gangtok, Sikkim 737135
(AMI No. 9.158) (2024-25) Tab/Cap Prucalopride 1mg, MAKE/BRAND: PRUVICT 1 TAB, Address of Mfg unit: TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH 10, East District, Gangtok, Sikkim 737135, Mktd
A M I No. 14.165 / 2024-25 Tab./Cap. Duloxatine 20mg Make/Brand:- Symbal 20 Tab Mfg. By:- M/s TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH 10, East District, Gangtok, Sikkim 737135
A M I No. 10.80 / 2024-25 Tab/Cap. Bisoprolol 2.5mg, Make/Brand:- CORBIS 2.5MG TAB, Mfg by:- M/s TORRENT PHARMACEUTICALS LTD. 32 No. Middle Camp, NH-10, East District, Gangtok, Sikkim-737135
MAX30102 Heart Rate and Pulse Oximeter Sensor Module, AD8232 ECG Sensor Module, Adv Tech EMG Muscle Sensor V3.0 With Cable And Electr, Muscle BioAmp EMG Band, Raspberry Pi 5 Model 8GB, Raspberry Pi Camera Module 3, OffRaspberry Pi Micro SDCrd 128GB A2 Class, Raspberry Pi Case, Mini HDMI To HDMI Cable, Bread Board Jumper Male to Male, Bread Board Jumper female to female, Nano BLE Iot 33 board, Micro USB-A to Micro-B Cable, Raspberry Pi Pico 2 W with Header, Wire Cutter, Bread Board
A M I No. 14.207 /2023-24 Levosulpiride 75mg Sustained Release Form Make/Brand:- Levazeo SR 75 Mg. Mfg. By:- M/s Torrent Pharmaceuticals Ltd. 32 No. Middle Camp, NH-10, East District, Gangtok Sikkim -
A M I No. 10.56 / 2023-24 S-AMLODIPINE 2.5 MG TAB Make/Brand:- Esam 2.5 Mg. Tab Mfg. By:- M/s Torrent PharmaceuticalsLtd. 32 No. Middle Camp, NH-10, East District, Gangtok, Sikkim-737135.
A M I No. 10.81 / 2024-25 TAB/CAP. BISOPROLOL 5 MG, Make/Brand:- CORBIS 5MG TAB, Mfg by:-M/s TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH-10, East District, Gangtok, Sikkim-737135
PMC Services for Up-gradation to 2 lane with paved shoulders configuration of NH310A starting from its junction with NH 310 near Tashi View Point connecting Penengla, Kabi, Phensong, Phodong, Namok, Rangrang and terminating at Mangan
Special Repair for Teesta Riverbank Protection Works by Construction of Gabion Spur at Bardhang Km 60-480 NH-10 under the Jurisdiction of PMU-Ranipool NHIDCL on Percentage Rate Contract Basis in the State of Sikkim
A M I No - 14.196/2024-25 Cap/Tab Lamotrigine 25mg Dispersible, Make/Brand - LAMITOR 25 DT TAB, Mfg by - M/s TORRENT PHARMACEUTICALS LTD 32 No. Middle Camp, NH-10, East District, Gangtok, Sikkim 73713
A M I No. 14.193 / 2024-25 Lacosamide 100mg strip of 10 Make/Brand :- Lacosam 100 Mg Tab Mfg. By:- M/s TORRENT PHARMACEUTICALS LTD PLOT NO. 725 & 726, 32 No. Middle Camp, NH 10, East District, Gangto
Consultancy Services for Preparation of DPR for major bridge connecting NH-10 with NH-510, realignment from Ch. 0 to Ch. 3.074 on NH-510 into 2LPS and permanent mitigation measures on sinking sliding zones 2ND CALL
CONSTRUCTION/IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE
Short Term Maintenance Contract (STMC) on NH-10 for the section from km 53 Rangpo to Km 64 Singtam Bridge under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
Balance work for rectification of damages caused to bituminous pavement and road side drain for laying of PHED pipelines in connection with the project work of Ravangla Tunnel PKG-III (Design Chainage from KM 32.500 to Km 33.600) of NH-510
Work for Provision of Paved Shoulder in Selected Length Footpath Road Safety and Road Furniture and other miscellaneous items from Rangpo to Ranipool from Km 52 to Km 80 of NH10 in the State of Sikkim on Item Rate Contract
Const. of 2-lane specification road with PS as realignment(Greenfield alignment)of existing stretch between Legship toGyalshing of NH510(designchainage km75.000 tokm90.210) under SARDP-NE Phase A on the EPC basis in the state of Sikkim (PKGVI)
(STMC) on NH-717B for the section from Km 20.340 (Rongli Bazaar) to km 26.588 (Rongli Bypass End) and upgradation of existing road at Km 20.600 Km 26.400 for length of 0.520 km 0.554 Km of Rhenock- Menla spur under jurisdiction of PMU-Rhenock
Short-Term Maintenance Contract STMC on NH-510 for the section from km 58.840 to km 90.210 under PKG-V and PKG-VI, under the jurisdiction of PMU-Gyalshing, NHIDCL, on a Percentage Rate Contract basis for FY 2026-27 in the State of Sikkim
Short Term Maintenance Contract (STMC) on NH-10 for the section from km 64 Singtam Bridge to km 80 Indian Oil Fuel Station Ranipool under the jurisdiction of PMU-Ranipool, NHIDCL on Percentage Rate Contract Basis for FY 2026-27 in the state of Sikkim
SUPPLYANDSTACKING OF S.AGG OF 11.20MM,6.70MM,S.DUST 5.00MM,BL AT KM 84.00 (HMP SITE)ON RRK RD FOR BC 40MM THICK FOR ADDL RESURF WKS INCL CORR WK F/Y 21-22 ON JNM (NH-310)(BET KM24.250 TO KM40.240 ON GS RD)AND(0.00-3.675 ON SN RD)130/764 TF (P) SWTK I
SUPPLY AND STACKING S.AGG 13.20-10, 10-5, 5 MM AND BELOW AT KM 84.00 (HMP SITE) R-R-K RD BC 40 MM TH, RE-SURF WKS INCL CORR. WKS 22-23 ON JNM NH-310, KM 38.580-48.250 RD G-S, BT KM 3.00-4.450 RD S-N,130 RCC/764 TF(P)SWTK IN SKM
Consultancy Services of AE from Ch.0-2 MajorBridge of 680m (ii)Construction/Upg of Existing Road to 2L PS from Ranipool to Pakyong from Km 2-16.167 (Balance Work) of NH-717-A Construction of 48m Chuba Khola Bridge fromKm 75.300 - 75.800 on NH-10
Truck Mounted Suction Machine (Medium) (Q3)
Strengthening works on NH-10 from km. 52.000 to Km 80.000 on Item Rate Contract Basis in the state of Sikkim for FY 2021-22
FROM KM 80.000 TO KM 92.040 ALONG NH-10 RANIPOOL TO GANGTOK ROAD IN THE STATE OF SIKKIM UNDER ANNUAL PLAN FOR ROAD SAFETY 2021-22
AnnualMaintenance Work on NH-10 from Km 52 Rangpo to Km 66 Singtam Shanti nagar in the state of Sikkim on Percentage Contract Basis for FY 2022-23.
All in One PC (V2) (Q2) (3 (3 ))
All in One PC (V2) (Q2)
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Manpower Outsourcing Services - Minimum wage - Skilled; Secondary School; Others
Manpower Outsourcing Services - Minimum wage - Unskilled; Secondary School; Others
Monthly Basis Cab & Taxi Hiring Services - SUV; 2000 km x 320 hours; Local 24*7
Security Manpower Service (Version 2.0) - Office/Commercial/Institutions/Residential; Unarmed Security Guard
Maintenance and Repair work of Ranipool to Pakyong stretch from km 2.000 to km 6.000 at NH-717A on Percentage Rate Contract in the state of Sikkim for FY 2021-22.
Annual Maintenance Work on NH-10 from Km 66 Singtam Shantinagar to Km 80 Indian Oil Fuel Station in the state of Sikkim on Percentage Contract Basis for FY 2022-23.
Construction of 2-lane with paved shoulder including Geometric improvement from Km 16.000 to Km 32.500 of stretch Tarku Rabongla of NH-510 on EPC basis under SARDP NE Phase A in the state of Sikkim
Roller, bearing pin, friction washer, nozzle injection, vane pump, sealing kit, minor rep kit for clutch m cyl, stator comp, hub RR wheel NH 25m, Gasket set, sprocket final driven 43t, panelsub comp fr brake cnh35m
Rehabilitation and Up-gradation to 2 lane with Paved shoulder of NH-510 (Singtam-Tarku-Rabongla-Legship-Gyalshing) Package -IV (Design Chainage from Km 33.600 to Km 58.840) in the state of Sikkim in EPC mode
Widening and Up-gradation of existing carriageway into 2-lane with PS configuration from Reshi to Rhenock from Ch. 96.254 to Ch. 101.554 along NH-717A in the State of Sikkim on EPC mode 2nd call
on EPC mode. Job No. 310A/SK/2021-22/07
Construction / Upgradation of existing road to 2-lane with paved shoulder including geometric improvement from Ranipool to Pakyong from km. 2.00 to km. 6.00 on NH- 717-a on Item rate basis under SARDP-NE phase A in the state of Sikkim.
Consultancy Services for AE for Supervision of Construction and Upgradation of existing road to 2- lane with paved shoulder configuration for Package II-A, II-B, II-C, III-A and III-B of Rhenok - Menla spur (NH-717B) in the state of Sikkim
CS for AE for 1. 2lane with paved shoulder including geometric improvement from Ranipool to Pakyong from Km. 0.000to Km. 16.167 of NH-717-A and 2. Const. of 48m Bridge over Chuba Khola from km 75.300 to km 75.800 on NH10 on EPC Basis in Sikkim
Const. and up gradation of existing road to 2-lane with PS including geometric improvement of section from start of Pedong Bypass to Reshi Border Km79.700 to Km96.254 of NH-717A under SARDP-NE Phase A on EPC basis in West Bengal-PKG VB (2nd Call)
Hiring ofMachine/Labour etc for clearance of landslides in Rainy Season 2020 on NH-10 from Km 52 to Km 66 Km 66 to Km 80 Indira Bypass 0.00 to Km 10.117 Sirwani Km 0.00 to Dalep Km 2.30 for PMU at Ranipool in the state of Sikkim 2nd call
Title1, Title2, Title3, Title4, Title5, Title6, Title7, Title8, Title9, Title10, Title11, Title12, Title13, Title14, Title15, Title16, Title17, Title18, Title19, Title20, Title21, Title22
Multifunction Machines MFM (Q2) MSE Exemption for Years of Experience and Turnover
Multifunction Machine MFM (V2) (Q2) MSE Exemption for Years of Experience and Turnover