Loading…
Loading…
6,379 results • Best match
IES for Supervision of i-Construction of 4-6 Lane Northern Ayodhya Bypass total length of 35.40 kms of Part-1 north of NH27 and Part2 south of NH27 ii-Construction of 4-6 Lane Southern Ayodhya Bypass from km 5.000 to km 37.172 of total length of 32.1
CONSTRUCTION OF BALANCE 03 NOs OF MAJOR/MINOR BRIDGES AT KM.327.545 KM.411.105 and KM. 415.865 and 01 VUP AT 416.685 AND 2LANE CROSS FLYOVER AT KM. 413.830 ON EXISTING 4LANING OF BAREILLY SITAPUR OF NH24 ON EPC BASIS IN UTTAR PRADESH.
Engagement of user fee collection agency on the basis of CB through for Pratappur FP in Mirzapur District at Km 27.275 for the use of four and more lane section of Varanasi-Hanumana in Uttar Pradesh
CS for AE for, 1. Development of 6Lane greenfield Ring Road(Pckg-I) starts from Ch. 0.000 to Ch 23.325(L-23.325kms) around Kanpur City in UP on EPC mode. 2. Development of 6Lane greenfield Ring Road(Pckg-IV) starts from Ch68.650 t
Engagement of Manpower Service Provider for collection of User Fee on Raibha FP at km. 10.800 new 4Lane Agra bypass connecting km 176.800 of NH2 to km 13.030 of NH3 in the State of Uttar Pradesh
Strengthening and improvement of Gorakhpur Kasia UP/Bihar Border Sec of NH27 from Ch. Km330.002 to Km 366.117 (TL 36.115 Km)on EPC Mode in the state of Uttar Pradesh
Construction of leftout portion of Agra Inner Ring Road connecting village Deori (Design CH.0.00) to NH44 (old NH03) village Bad (Design CH. 7.772) in the district of Agra in the state of Uttar Pradesh on EPC mode.
CS for preparation and approval of Detailed Design and Drawing of Various Standard Spans of ROB with Standard Deck Configuration of 2Lane one way and 3-Lane one way including Proof checking from (IIT)/ (NITs) and Approval from (RDSO Lucknow)
Consultancy Services for IE during ONM Stage for Delhi-Meerut Exp Pkg-I Km 0.00 to Km. 8.360 in the State of Delhi and Pkg-III Km. 27.740 to Km. 49.346 in the state of UP on HAM
Construction of new 4lane Prayagraj Southern Greenfield Bypass from km. 50.860 (Nababa urf Nibi Kala Uparhar) to km. 64.763 on NH19 (near Khodaypur Kasgaon) including Interchange loop at NH19 (design length 14.980 km) Pkg3 PhI in UP on EPC under BMP
CS for AE of Const. of a 4L Western bypass for Jaunpur city connect NH731 at exist. Ch.Km.223.200 to NH135A Eastern Bypass at Ch.Km. 107.780 TL 12.205 km in Uttar Pradesh on EPC mode
Engagement of user fee collection agency on the basis of CB through etender for Bamhori Kurmi FP at km 104.600 for the use of 2lane with paved shoulders of Harpalpur Sugira section on NH76 in the state of Uttar Pradesh
CS for AE for Development of 6L GF (PKG-IIA) starts from Design Ch.23.325 to Design ch. 32.090 around Kanpur city (8.765 kms) and Development of 6L GF (PKG-IIB) starts from Design Start from 32.090 to Ch. 51.200 (19.110 kms) in UP on EPC mode.
Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km.43.200 (near Mahuari) to design km.50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) PKG-2 under Ph-I on NH19 in UP under Bharatmala on EPC mode.
Independent Engineer Services during Operation and Maintenance period of 5 years for 6 Laning of Delhi Agra section from Km. 20.500 to Km. 200 in the State of Haryana and U.P on Design, Build, Finance Operate and Transfer (DBFOT) basis.
RFP for Design Supply Installation Testing Commissioning and Operation and Maintenance of Advanced Traffic Management System on Delhi to Agra Section of NH19 on EPC mode
Engagement of user fee collection agency on the basis of CB through etender for Ramnagar Gansiyari FP at km 118.400 on Pratapgarh to Allahabad Bypass Road Junc Sec of NH96 from km100.800 to km 135.200 in the Uttar Pradesh
Four Laning of existing road section of NH30 (Old NH24B) from km 162.000 (Lalgopal Ganj) to km 179.450 (Nawabganj) of Raebareli to Prayagraj section in the State of Uttar Pradesh on EPC Mode
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
Improvement and upgradation of NH74 (New NH30) stretch Pilibhit Sitarganj from Km. 32.500 to Km.64.800 and Ch.0.00 to 6.00 (Sitarganj Bypass) on HAM in Uttar Pradesh and Uttarakhand (Package 2 of Bareilly Pilibhit Sitarganj).
Consultancy services for AE for Development of 6-lane green field Ring Road (Package-III) starts from Ch.51.200-Ch.68.650 around Kanpur City and Construction of 4-lane Airport link road at 62.090 of Kanpur ring road in Uttar Pradesh on EPC mode
CS of AE for Const of 4lane Western side spur of Rampur Rudrapur sec connecting NH24 to NH87 bypassing Rampur town Km 00.000 to Km 13.700 on EPC and 2lane existing bypass of Rampur to be developed to 4lane on EPC in Uttar Pradesh on EPC.
AE for Construction of 4 lane Greenfield North East side Gorakhpur bypass (26.616 kms) starting from NH29E (Km 83.308) and end at NH28 (Km 285.100) in the state of Uttar Pradesh under Bharatmala pariyojana on EPC mode.
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in Uttar Pradesh on EPC Mode (Package-I)
Engagement of Manpower Service Provider for collection of User Fee on Raksha Fee Plaza at km. 1374.650 from Shivpuri to Jhansi section from km 1305.087 to 1380.387 on New NH27 in Madhya Pradesh
Construction of Rudrapur Bypass section from Km.0.000 to Km.20.640 in the State of Uttar Pradesh and Uttarakhand on Hybrid Annuity mode
IE services for 4lane with paved shoulder from Km88.750 to 123.650 Shahjahanpur bypass to Shahabad bypass of Nh731(Pkg2A) and Shahabad bypass to End of Hardoi bypass of NH731 on HAM basis in UP(Pkg2B)
Improvement and Upgradation of Existing Road to 4lane with Paved Shoulder from Km 229.070 to 260.800 End of Hardoi District to Lucknow of NH731 Pkg4 on EPC basis in the state of Uttar Pradesh
CS for AE for Development of 6 lane GF (Pkg-IIA) starts from Ch.23.325-ch.32.090 around Kanpur city (8.765 kms) and Development of 6L GF (Pkg-IIB) starts from Design Start from Ch.32.090-Ch.51.200 around Kanpur city (19.110 kms) in UP on EPC mode
Engagement of user fee collection agency on the basis of CB through etender for Bamhori Kurmi FP at km 104.600 for the use of two lane with paved shoulders of Harpalpur Sugira section on NH76 in the state of Uttar Pradesh
Construction of Greenfield Connectivity to Jewar International Airport from DND-Faridabad Ballabhagh Bypass KMP Link Spur to Delhi Mumbai Expressway on HAM under Bharatmala Pariyojana in Uttar Pradesh n Haryana
CS for IE for Supervision of Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor from Design Chainage O (Delhi-Dehradun) to 50.700 (Bahadrabad) in UP and UK on HAM under BMP DS/PKG-III
Engagement of Manpower Service Provider for collection of User Fee on Raksha FP at km. 1374.650 from Shivpuri to Jhansi sec from km 1305.087 to 1380.387 on New NH27 in the State of MP
Engagement of user fee collection agency on the basis of CB through etender for Chitora Fee Plaza in the State of Uttar Pradesh and Madhya Pradesh
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai Chennai Kolkata Kolkata Agra Agra Delhi Corridors of Golden Quadrilateral
Consultancy Services for preparation of DPR cum feasibility report for 4-laning green field highway from Meerut-Haryana border in the state of Uttar Pradesh.
Improvement and Upgradation of NH734 sec of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPC basis in Uttar Pradesh and Uttarakhand PckgIII Kashipur BypassLength14.490 km. Starts from Ch.38.770 near UP UK Border a
Engagement of user fee collection agency on the basis of CB through etender for Bakori Fee Plaza in the State of Uttar Pradesh and Madhya Pradesh
Engagement of user fee collection agency on the basis of CB through etender for Maigalganj Fee Plaza in the State of Uttar Pradesh and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
IE Services during Operation and Maintenance stage of Development of Delhi Meerut Expressway Pkg 1 2 3 from Km. 0.000 to Km. 50.270 Nizamuddin Ring Road or Delhi to Hapur in Delhi or Uttar Pradesh. Total Length 50.270 Km
IE Services for Supervision of Const. of 6lane GF Varanasi Ranchi Kolkata Highway from junc with Bhabhua-Adhaura road in Bhairopur vill to Konki village (from Km. 54.000 to Km.90.000) under BMP in the state of Bihar on Hybrid Annuity Mode
IE Services for 4 Laning of Behsuma Bijnor Section of NH119 from Ch.39.250 km (Existing chainage 39/240) to Ch. 78.810 km (Existing chainage 89/590) with Design Length 39.560 km in Uttar Pradesh on HAM under Bharatmala Pariyojna
4laning of Aligarh Palwal Sec from Km.46.390 (DC) to Km. 69.110(Terminating at junc EPE)(PKG-II from Kurana Eastern Peripheral Expressway)of NH334D in Uttar Pradesh and Haryana on HAM
Cashless Treatment Scheme for road Accident Victims on the Delhi Mumbai Chennai, Chennai Kolkata, Kolkata Agra, Agra Delhi Corridors of Golden Quadrilateral
IE Services for Supervision of Const. of 6lane GF Varanasi-Ranchi-Kolkata Highway from Deoria vill. to junc with NH20 in Bongabar viLL from km253.000 to km325.500 under Bharatmala Pariyojana in the State of Jharkhand on HAM
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Construction of Balance Work of ROB at km 290.445 of Bareilly Sitapur Section of NH24 in the State of Uttar Pradesh.
Independent Engineer Services for supervision of Agra Bypass(From Km.0.000 to Km.32.800) in the State of Uttar Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2)
IE Services for Dev of 6lane of AC Agra-Gwalior GF highway from km 0.000 to km 88.400 in UP Raj. and MP including overlay/strength n other road safety and improv. works inclu. OnM on exis Agra Gwalior sec 1058.00 to 1148.00 of NH44 on DBFOT pattern
Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor in Uttar Pradesh and Uttarakhand on HAM under BMP (From Ch. 0 to Ch. 50.700)