Loading…
Loading…
6,379 results • Best match
Engagement of user fee collection agency on the basis of competitive bidding through etender for Dularpur Fee Plaza in the state of Uttar Pradesh
Improvement and Upgradation of Existing Road to 2by4 lane with Paved Shoulder from Km 40.000 to 88.750 start of Khutar bypass to start of Shahjahanpur bypass of NH731 PKG-1 in the state of Uttar Pradesh
Engagement of user fee agency through E-Tender at Sabli in Shahjahanpur Distt. Fee Plaza at design existing km.61.500 for the section (Powayan Puranpur (2 lane with PS) of NH730A in the state of Uttar Pradesh
Engagement of user fee agency through EQ for Siwaya Toll Plaza in the state of Uttar Pradesh and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through EQ for Itaunja Fee Plaza at Km. 468.000 and Khairabad Fee Plaza at Km. 420.000 on the Lucknow-Sitapur section in Uttar Pradesh
Construction of 6-lane Greenfield Varanasi Ranchi Kolkata Highway from Donoreshan village to junction with NH20 in Bongabar village from km 288.600 to km 325.500 under Bharatmala Pariyojana in the State of Jharkhand on Hybrid Annuity Mode (PKG11)
Development of New A Site RO at Location WITHIN KM STONE 433-431,ON KANPUR JHANSI HIGHWAY (NH-25) LHS KNP TO JHANSI Dist.-Kanpur Rural under Kanpur Divisional Office of UPSO-1.
WIDENING AND STRENGTEHNING OF PALIYA LUCKNOW ROAD (NH-731) NANAKGANJ KHADRA GAUSHALA TO HARDOI PIHANI CHAPARTALA ROAD (MDR) CH 0.00 TO 6.400 UNDER RSN SCHEME(LENGTH 6.400 KM) IN DIST. HARDOI
Widening and Strengthening of road Emerging from NH-24 Sonauli Nautanwa Gorakhpur Green City Colony to Madhopur Bandha Via Patniya (02 lane work) (including Five year maintenance) Lot No 2/2
Widening Extension of RCC Slab culvert 1x5.0mx5.50m in chainage 416.700 LHS 1x5.2mx5.50m in Chainage 417.190 LHS 1x2.6mx2.00m in chainage 419.300 Both Side of NH 91 in the State of Uttar Pradesh.
Work 22 Planting of saplings on the central verge of Road No. 12 from Kanawani in Indirapuram Yojana to NH-24, and horticultural maintenance work for a period of 6 months.
25. Construction of Nagar Panchayat Sahajanwa me NH-28 se Babu Lal Complex tak pitch Road ka Chaurikaran and Divider and Nala Nirman by Hot Mix Plant in Dist. Gorakhpur L_25
Improvement Work of Black Spot No. UP 7096 Year 2024 located on Atal Road Shaheedpath near Lucknow Kanpur Road on Shaheedpath NH 56 A and B in Lucknow District Civil Work
PROTECTION OF BALLIA-BAIRIA BUND (NH 31) BY CONSTRUCTING SPUR AT KM. 26.900 AND REVETMENT KM, 26.720 TO 26.900 ON LEFT BANK OF RIVER GANGA IN DISTRICT- BALLIA (U.P.) L0t-03
WIDENING AND STRENGTHENING OF PALIYA LUCKNOW ROAD (NH-731) (FOUR LANE) CHAINAGE 158.500 TO CHAINAGE 169.000 (TOTAL LENGTH 10.500 KM) IN DISTT. HARDOI IN F.Y. 2025-26. (WITH FIVE YEARS MAINTENANCE)
Widening Strengthening of Lucknow Barabanki Gorakhpur Mokama Old NH 28 City Portion ODR from Km 22.700 to 26.000 Km 29.700 to 30.500 Asaini road Tiraha to Bahraich Tiraha in Distt Barabanki
Widening and strengthening of the road from Tarapur to Bhogaon old NH Change 9 200 to 12 via Salempur Padhina at Km 38 of Saurikh Mainpuri Aliganj Badaun State Highway 141
Work of Lighting and five year annnual maintenance of Gate to be built on from Chiragaon NH 27 to Bhander M P Road under the Interstate Connectivity scheme in District Jhansi
Periodic Renewal (PR) Work in the stretch from km 13.000 to km 21.000 and km 34.000 to km 56.800 on NH-328A in the State of Uttar Pradesh on EPC mode
Road Safety work from Km 0.000 to Km 38.600 of NH-124C (Tarighat-Bara Road) on EPC Mode in the State of Uttar Pradesh under Road Safety 2022-2023(2nd Call)
Patch Repair in Year 2022-23 on Bara Bypass road to Satelite Bareilly old Pilibhit bypass road NH 70 old city portion ch. 5.000 to 11.320 in Block kyara. With HMP
PMC for preparation of Detailed Project Report, Pre construction activity and supervision for the work of Elevated corridor from Ramadevi to Gol Chauraha on NH-91 in the state of U.P.
Periodic renewal (PR) work in the stretch from km. 57.346 to km. 78.00 of NH-92 in the State of Uttar Pradesh under EPC Mode on Engineering, Procurement, Construction EPC basis.
Supervision Consultant for monitoring (i) 5 nos. VUPs at km. 305.640, km. 307.630, km. 339.100, Km. 345.300 and Km. 364.200 and (ii) Strengthening and improvement of NH 27 for 36.616 km
Repair and painting of Culverts, Divider and ROB parapet between Ch 13.000 to Ch 40.000 of NH 328A under OR in the State of Uttar Pradesh in the year 2022-23.
Constrution of 3x18 mtr span Bridge approach road, protection work at NH 731k Barkhera kalan to Bisalpur Puranpur road on Mala River Near Village Buhita Under State Sector year 2019-20
Construction of NH-730 Km-195 to Left Gurh Harkhapur road Km 3 to left Naubna link road KM 3 to left Sampatpurwa Revenue Village Naubana Link Road. By Departmental H.M.P.
Strengthening work from km-159.00 of Mau Dohrighat Road (NH-29) to Azamgarh Dohrighat Road via Victory Inter College on the left side (Length- 0.850 km) (Including five year maintenance cost)
Construction of Widening and Strengthening of NH-730 S to Etahiya-Shiv-Mandir-Indo Nepal Border Road (ODR) Year 2019-20 in District Mahrajganj. (Length-9.000 Km.) lot No 2/3
Development of New A-RO Between KM no 759-762 on NH 2 LHS while moving from Allahabad to Bihar Border, Dist. SRD Nagar. Under Varanasi Divisional Office under UPSO-I
Under OR Patch repair work in damaged portion Between Km 42 43 56 57 61 62 63 72 73 74 75 76 on Newly Declared NH 321G (Agra Jalesar Etah) road
RFP for Construction of 4 lane Mirzapur bypass including bridge over river Ganga from km 0.000 to km 15.000 of NH 135A in the State of Uttar Pradesh on HAM Mode.
Design and Construction of 02 lane ROB at LC 136 SPL/3E On Bahraich Tulsipur Marg (NH-730) Near Jharkhandi in Tulsipur Assembly Constituency of District Balrampur, U.P. on EPC Mode.
Construction of 6 X 5 meter span small Bridge at km- 5-20 of kushinagar bypass road from NH-28 four lane Jhungwa to Gopalgarh via siswa intersection in District Kushinagar
Construction work of covered drain and interlocking road till NH-29 via the house of Dihababa at the house of Mohalla Revaridih Ramkrit Pal in Maunath Bhanjan Ward No. 11 Khwajajahanpur.
Construction of NH-31 KM 480.00 Left Side Via (Sagarpali Ballia Garwar) Road to KM 2.20 Right Side Pandeypur to Primary School Via Malikpura Taluka Via Nasirabad Railway Crosing Link Road
Stage strengthening from km. 0.000 to km. 43.750 Mohanganj to Lalgopalganj section and km. 52.200 to km. 96.600 Muratganj to Mahewaghat section of NH-731A in Uttar Pradesh on EPC mode
PROTECTION OF BALLIA-BAIRIA BUND (NH 31) BY REPAIRING OF REVETMENT FROM KM 27.090 TO 27.160 AND 27.230TO 27.470 ON LEFT BANK OF RIVER GANGA IN DISTRICT BALLIA (U.P.) LOT 07
On Occasion of organizing of G-20 Summit and Global Investors Summit in Lucknow city, Road Safety work in Km 494 and Km-495 (600) of Delhi-Bareilly Lucknow (NH-24).
Renewal work of NH-2 Bhagupur to Agwar Nagla Mani Garhi Prathvi Lakhnamai and Village Siktara Road Km. 1(300), 2(300), 3(100), 4(700), 5, 6, 7, 8((500)
24. Construction of Ward No 1 me NH-28 se Murari Inter Collage se Kali Mandir tak Pitch Road and RCC Nali Nirman by Hot Mix Plant in Dist. Gorakhpur L_24
Renewal with General Repair of Following roads (1) Km-304 of NH-28 to Narayanpur link road (2) Sursar Deuri link road (3) Dudi Nagar link road (4)Rampura link road
Ward No. 09 Muhalla Chandrbhanpur/Khwajajahanpur Me NH-29 Madhav Place Se Ajay Rai Ka Makan Hote huwe Vishnu Rai ke makan Tak RCC Nala patiya va cc ka nirman karya
construction work of link road from km 1 of Bhatwalia link road to NH 28 via Bhatwalia No.3.under NABARD funded RIDF scheme in district Kushinagar in FY 2023-24
Improvement Work of Black Spot No. UP 7082 Year 2024 between km 12.500 to 12.700 of Lucknow Kanpur Road on Shaheedpath NH 56 A and B in Lucknow District Civil Work
On Occasion of organizing of G-20 Summit and Global Investers Summit in Lucknow City, road signage work at Delhi-Bareli-Lucknow Road (NH-24) in Km 488(470) to 493.
Construction of four lane Gola Flyover at Km 99.850 of NH 730 Major Junction with state highway 93 on Engineering Procurement and Construction EPC Mode in the state of Uttar Pradesh
Pot Holes and Patch Repair of Bachhrawan-Rajamau Neewan Ichauli (ODR) Road Pot Holes and Patch Repair of Bypass between NH-24B and Bahraich Banda SH-13 Road near Bachhrawan Kasba
Construction work of covered drain and interlocking road till NH-29 via the house of Dihababa at the house of Mohalla Revaridih Ramkrit Pal in Maunath Bhanjan Ward No. 11 Khwajajahanpur.
Repair of damaged drain on the service road of Ward-02 Rahul Vihar NH-09 and covering the slab after puncturing it and laying of R.S.C. culvert near the straw warehouse.