Loading…
Loading…
6,379 results • Best match
Patch repair work by hotmix plant from NH-58 to Janta Colony Railway Gate in Pallavapuram Phase-1 word 27 pallavpuram
Centre line and edge line work on Roonkata Kirawali road to NH-3 Nehar Patri and Chandausi-Agra-Tatpur Kot road.
Renewal with general maintenance of NH 730 to Kasimpur Link Road (VR) in financial year 2025-26 (Lot No. 26/72)
Special Repair of NH-24 Km. 315 to Bakhtyarpur Link Road Km. 2 Link Road at Abadi Portion in Distt. Shahjahanpur
Potholes Patch Repair work in Km. 7, 14, 17, 18, 42, 50, 51, 52 and 53 of NH-931 under OR
Strengthening and Widening work of Jugsana baldev Baroli Kailash NH-2 Road (MDR173) at Ch. 14.250 to 37.800 in District Mathura
Gram Panchayat Bharwal Mein NH-29 Par Setu Bandhu S Ghar Se Anand Chaudhary ke ghar Tak CC Road Ka Nirman
Road improvement work from NH-09 to Gali No. 07 B Block (Bees Foota Main Road) in Ward 02 Siddharth Vihar.
Vikaskhand swabhav ke Gram Panchayat nasirpur math NH 31 se Lalji Yadav ke ghar korandadi Nahar ki or CC ka karya
Widening of constructed section on NH-31 from Km 481.766 of Maldepur to Kadam Chauraha Km 486.421 and construction of drain
Construction work of drain from NH-927 to Munna Kotedar house in Ward No-09 Moh-Deendayalnagar of Nagar Panchayat Rupaidiha
Repair work of damaged road from NH-09 to (Rathi Road) near Liquor Contract Kotgaon Gate in Ward-25 Industrial Area.
Constrution of NH-26 Km 417 to Laxmanpur se hote hue Bahrampur to Tagahwa hote hue Kakrahwa(Bhadi Khurd) Link Road
Construction of the harat Ratna Atal Bihari Vajpayee Memorial Gat on NH-30 in the Nagar Panchayat Fatehganj East. (M.L.A-Faridpur)
55 - Nagar Palika simantargat NH 9 sthit gram Kheda gate ke nikat palika bhumi pr Commercial Complex dukano ka nirman karya.
WORK NO. 02 MATHURA STHIT YATAYAT NAGAR ME NH-19 SE SAUKH ROAD KO JODNE VALE MUKHYA MARG KA NIRMAN KARYA
Special Repair of Gorakhpur Deoria NH Km-1 to Khorabar link road Km-1 to 6 Lot No-8 of 87
Road safety work on the bypass road from NH-58 to Nangli Hospital via Sakoti, Mandaura, Nangla Rathi in Meerut district
sr of tahsil muhhamadabad power house to nagar palika gate bittal chauraha greriya ka pura NH 29 to Ahirauli link road
Repair work by DBM and BC with Hot Mix Plant in KM 31 and 32 on NH 730B Under OR Head
Construction of Ayodhya Faizabad NH-70 se nikalkar rampursaraydali patawa sampark marg sampark marg Under RIDF-26 in year 2020-21
Vikash khand Chhata ke gram Ajijpur mai NH-19 se modern school ke piche ke gate ki aur interlocking inrman karya.
Work of enamel painting on electric poles located from NH-2 Meera Square to Bashan Hospital. (18 meters on each pole)
Repairing of damaged stretches between Km 15.000 to 30.000 on Newly declared NH-730C under Flood Damage Repair in 2019-20
Strenghtening of Road (P/L DBM and BC on road No.-06 from Sector-61 Underpass to NH-24 Underpass), Noida.
Const. Of C. C Road from G.T. Road NH 34 To Virangana Abantibai Lodhi Inter collage in village Asokpur Khatakani Mainpuri.
Renewal work of NH-29 hote hu Gagupar Missing Road in District Gorakhpur in FY 2025 26 Lot 01 of 02
WORK OF SURVEY/MAKING PROFILE AND SCHEDULE AT 220 KV NEHTAUR-MATAUR LINE FOR NH-119 BROADENING WORK UNDER ETD DHAMPUR.
Construction of Lucknow Prayagraj Road (NH) Km-104 to Kusumi Link Road to Hathkui Link Road. Km-1 to 4(250)
WORK OF SURVEY/MAKING PROFILE AND SCHEDULE AT DIFFERENT 132 KV TRANSMISSION LINES FOR NH-119 BROADENING WORK UNDER ETD DHAMPUR.
janpad ayodhya mei NH-27 se ramghat digambar akhada hote huye ayodhya faizabad mukhya marg tak chaudikaran ewam sudrirhikaran ka karya.
GRAM PANCHAYAT KAURIRAM ME NH-29 SE RAM OMKAR RAY KE GHAR TAK C C ROAD AND BHUMIGAT NALI NIRMAN KARY
Repair and Improvement of NH-58 Modinagar to Begmabad Sauda Didoli Kakra Salemabad Jhal Rewadi Rewada Bihang in Km. 2(200)
Widening and Strengthening of NH-91 Bulandshahr Aabadi Portion from Ch. 1.270 to 4.445 and 5.450 to 6.990 in District Bulandshahr
Construction Of Bypass Between Lucknow-Prayagraj Road (NH-30) Km-53 and Banda Bahraich Road (SH-13) Km-175 Near Bacharawa
Construction of 1x600mm dia NP3 hume pipe culvert at NH-24 to Goola road in Distt. Bareilly (financial year 2025-26.)
Periodic Renewal work from Km. 72.505 to Km 91.075 of NH 727H under EPC mode in the State of Uttar Pradesh.
Maintenance of Km.107.350 to Km 175.000 of NH-727A under Performance Based Maintenance Contract in the state of Uttar Pradesh.
Strengthening Of Roads (Resurfacing of 30.00 mtr. wide road from Mamura electric sub-station to parallel road of NH- 24), Noida
Flood Damage Repair in year 2022-23 on NH-730B in km 31 and 32 in the State of Uttar Pradesh
Construction of Minor Bridge 1X30.00 mtr. at Km 214.704 on NH 730 under EPC mode in the state of Uttar Pradesh.
Road safety work on the bypass road from NH-28 four lane Jhungwa to Gopalgarh via Siswa intersection in Kushinagar district.
Work no-5 chata me NH-19 se chata railway station tak jane wali sadak par interlocking road ka nirman karya
Special Repair of NH-28C to Khesuwa Link Road Km-1_300 and 2_100 in Financial Year 2025-26. Vidhan Sabha Kaiserganj
Periodic Renewal work from Km 46.220 to Km 71.450 of NH-727H in the State of Uttar Pradesh under EPC mode
Renewal with general maintenance of NH 730 to Lalpur Link Road (VR) in financial year 2025-26 (Lot No. 27/72)
Renewal work of NH 28 to Pajupar Link Road in Distt Gorakhpur in FY 2025 26 Lot No 14 of 35
Strengthening Overlay on Lalganj Bypass and Fatehpur Bypass on Raebareli Banda section of NH 232 in the state of Uttar Pradesh
Renewal work of NH 29 to Pajupar Link Road in Distt Gorakhpur in FY 2025 26 Lot No 03 of 50
Janpad Kanpur Nagar Esthit NH-2 Ke KM-484 Se Chakeri Airport Tak 4 Lane Marg Par Prakash Vyavastha Ka Karya