Loading…
Loading…
6,379 results • Best match
Renewal work with General Repair Work in the Badi Taparian link road from Km. 0-23 of NH-86 to Km. 0-2 of Kaimah road
Work number 24 - NH 9 se sankhya Shri Punit ki dukaan Tak Aadi Galiyon Mein Mohalla sarvoday Nagar CC Sadak V Nali Nirman aadi ka Karya
construction work on the road connecting NH 28 to Koindi Laxmipur Bujurg (Pandey Tola) under NABARD funded RIDF scheme in district Kushinagar in FY 2023-24
Work No92 Gram Sabha Sarai Mahesha Me Raebareli Sultanpur Highway Nh 128 Se Pure Udvat Guzran Vaya Pure Korin Ko Jaane Wali Sadak Lepan Marmmat Kary
01 - Muzaffarnagar ke NH-58 per bhopa road flyover bypass se dwarika city main gate se hote huye sahawali nale tak RCC nale ke nirman karya.
Construction of Gorakhpur Maharajganj Nichlaul (NH-81) Km-11 to Revenue village Gulhariya in Mahawal tola link road (including 5 year maintenance) (Lot No-14/26)
Painting on median and ROB, white and colour washing on tree bands, painting and lettering in km 80 to 107 of NH-731K under OR Head.
Ward no 08 me main road NH 58 Rajveer ke makan se Aman ke house tak rubber moulded ISI mark CC interlocking tiles and nali nirman
Ward No 2 Dostpura Uttar me NH 29 se Sunil Jaiswal ka Makan hote huye Ajay Maurya v shulabh Shauchalay Tak Coverd Nali V interlocking kary
Repair work of damaged culvert situated at chainage 19.500 of Basandih Ballia Ghosi NH 107 via Parsia Khadsara Sultanpur Bachaipur from Pakwainar Chandrawar Raghopur Marg (ODR)
Road safety work at 01 T-junction (Ch. 5.747) falling on NH-91 Bulandshahr Aabadi Part (Maharana Pratap Chowk) (city road) under PWD in District Bulandshahr
Constrcution of gate on 04 lane road on the border of Lucknow Gopalganj Muzzaffarpur NH-27 Intersate- International Road in Dist Kushinagar in FY 2023-24
Widening and Strengthening of NH-24 Dhaneli Poorvi to Patia via Bhopatpur Road (ODR) from Ch. 10.300 To 19.600 in District Rampur (including 05 years maintenance)
Filling of Pot Holes and Patch Repair work (by Paver finisher laying material from HMP) of NH-227A in Km. 108 to 118 (As per BOQ)
6- Construction of Widening and Strengthening of NH-730 S to Thuthibari-Indo Nepal Border Road (ODR) Year 2019-20 in District Mahrajganj. (Length-0.800 Km.)
Lot no.4 NH 31 par sita kund dhale se shri jhangar baba ke chabutre hote hue Vinay Tiwari ke ghar tak Marg ka nirman kary
Construction of NH-730 to Banakata Sangad Kewatalia link road under PVN Scheme(State Share) in District Gorakhpur in F.Y. 2022-23 (LOT NO. 03/05)
Ward No 7 Sardar Patel nagar me NH 730 se pokhra hote hue brijkishor ke ghar hote hue NP Office tak RCC Nali ka nirman Karya
Year 2025-26 SR of Madhan to Moradabad sambhal road (ODR) Km 7.500 to NH-9 via Saidnagli Manota Chaudharpur road (ODR) ch 6.771 to 10.295
Work of Barbed wire fencing of 20-20 meter wide green belt located on both side of 100 meter road from NH-9 to Greater Noida
Repair and painting of road dividers from Yamuna Kinara Marg (From NH-2 to Warter Works Square to Taj Mahal West Gate via Belanganj) (City Road).
Repair and restoration of 12x30.00mtr span R.C.C. Bridge, Approach road and Add. Approach road at NH-29 to Rakhat Ghat at Kauriram Block in Distt. Gorakhpur
Surface Repair and Construction of Rest portion of NH-29 at Kauriram By-Pass road in Distt. Gorakhpur in F.Y. 2019-20 Lot No 1/1
SR of Jhansi Mirjapur NH-76 Km-210 to Dureni Itwa Lohra to Parampurva Road in km-8, 9, 10, 11(960) including 5 year Maintenance
Work of new construction of connectivity road from Km 17 of Jhansi Mirzapur NH-35 to Shaheed Smarak Mataundh Rural via Power House on the right.
Shifting of 11KV over head line on 60 Mtr wide road due to constructions of new U Turn in alignment NH-24 link road, Greater Noida
Widening to four lane with paved shoulder from Design Km 49.200 to Km 89.285 of NH-731B on EPC Mode in the State of Uttar Pradesh
Periodic Renewal work in Km 13 to 18 and 22 to 39 of newly declared NH 731K under EPC mode in the state of Uttar Pradesh
Condition Survey and Non destructive testing of Deck Slab Piers and Abutment of Major Bridge over River Chambal at Km 78 of NH92 (New NH 719)
Rehabilitation and Up gradation to Four Lane Road from km 70.500 to km 78.600 of NH 92 under EPC mode in the State of Uttar Pradesh
Providing and laying 30mm Bituminous Concrete in Km.116, 117, 131 AND 132 of NH-227A in the State of Uttar Pradesh (Renewal work under O.R.)
Short Term Maintenance Cost Estimate of NH 330(Prayagraj-Sultanpur- Ayodhya-Gonda-Balrampur road) from Ch. 189.230 to Ch. 224.830 in the state of Uttar Pradesh.
Short Term Maintenance Cost Estimate of NH 330(Prayagraj-Sultanpur- Ayodhya-Gonda-Balrampur road) from Ch. 142.000 to Ch. 189.230 in the state of Uttar Pradesh.
Strengthening of Gangajal (Shifting of 1400mm dia G.Jal line along NH-24 near village-Chajjarsi and 300mm dia near Carl Huber School in Sector-62) Noida
Construction Of one Flyover at Km 2.735 and one Major bridge at Km 31.260 on NH 730 In the state of Uttar Pradesh under EPC mode
Patch repair work on Villages roads in Madnapur Block (on the left side of the Katra-Jalalabad Road NH-730C) Distt. Shahjahanpur Fin. Year 2026-27
Patch repair work on Villages roads in Madnapur Block (on the right side of the Katra-Jalalabad Road NH-730C) Distt. Shahjahanpur Fin. Year 2026-27.
Construction of Retaining wall parallel to Pandu River and Drain alongside 45.0 mtr. road between railway line and Lucknow Agra NH in Mahaveer Nagar Vistar Yojna.
Under District Sultanpur, Construction of interlocking road from Kaushar Ali house to NH 731 via Manikapur Parasin in village Hanumanganj under Khand Bhadaiya, Lot No 3
Maintenance work of existing project highway of Haridwar-Nagina, Section of NH-74, Km.0.000 to Km.73.000 in the State of Uttar Pradesh and Uttarakhand
Construction of RCC Drain from Km.23.600 to Km.33.410 on Ghaziabad-Aligarh Section of NH-34 in the State of Uttar Pradesh on EPC Mode
Raising of Existing CC road, Providing and Laying Interlocking tiles and Construction of RCC drain from Shakuntla School to NH-91 in Village Chhapraula, Greater Noida.
Annual repair work of residential building of type-4 (at District hospital, Stadium Ground, Company Bagh, Mahuli Tiraha, Krishi Bhawan, NH Campus) of departmental / pooled housing.
Construction work of Main Road (NH-35) Nahar Patri to the house of Ravendra Mishra in village Byur in Block Manikpur under Twarit Arthik Vikas Yojana
Road safety work at 01 intersection and 13 Tjunctions on Kharkhauda Mohiuddinpur Geja Siwalkhas road NH 234 other district roads under provincial Division in Meerut district
Development of New A site RO Between KM 621 KM - 626 KM on NH 19, Village- Bidanpur Distt- Kaushambi under Allahabad Divisional Office of UPSO-I
Special repair work in km. 1 to 7 (Abadi portion of Hamidpur and Jewar) of NH-334DD in the State of Uttar Pradesh on EPC mode.
Replacement of old damage street light pole and fitting on 60 Mtr wide NH-24 link road from Amrapali rotary to Gaur City rotary, Greater Noida
Construction of FOB with ramps across 6 lane HandiaRajatalab section at Ch 735.100 (Jangiganj Market) of NH-19 in the state of Uttar Pradesh. (2nd Call)
Widening Strengthening of section from Bharthana Chowk to Kodarkoot Km. 0.00 to Km. 40.00 of NH 91A in the state of Uttar Pradesh on EPC Mode.