Loading…
Loading…
4,251 results • Best match
Construction of Road from Naiful SK House at Uttar Dariapur NH-34 to Bagdogra Johari SK Land at Nawda Jodupur G.P at Kaliachak-I Block in the district of Malda (Length- 1.700 KM)
Special Repairing Work affected by flood within 5 Years Maintenance Work from L034-NH 31 AT JALDHAKA COLD STORAGE TO STATION PARA AT PAR KUMLAI Package No WB10131, Block Dhupguri under Jalpaiguri District
Construction of Concrete Road from Singher Bheri Durgapur Express NH 2 Bypass to Shop of Narayan Khan at Singher Bheri and Harharia Baroaritala to Rupnarayan Primary School under Gopalpur GP, Singur Block, Hooghly
Construction of Rigid Pavement from Shope of Santosh Mudi (NH-60) towards house of Nimai Das Adhikary at Mouza- Rupnarayanpur ,JL No. 212, within 7 No. Borkola GP under Kharagpur -I Panchayet Samity
Construction of 6.0 m span Slab Culvert at 0.262 Km of Road from NH 517 Gayerkata to Jogijhora additional Pry School (Kasiya jhora) under Sakhoajhora-I GP in Banarhat Block within Jalpaiguri District.
Digha Bypass Road of NH 116B, Locally known as Digha Foreshore Road, from 82.30 km. To 88.80 Km., Surfacing work under Tamluk Highway Division, in the district of Purba Medinipur. Project ID PD212244637S000
Cleaning and removing weeds and water hyacinth from Nona Khal from Khukabar to NH-6 for a length of 1.00 Km in G.P Kola-I, Block and P.S Kolaghat under East Midnapore Division
Repairing of Bituminus road from NH 31 to Bikash Bairagi and Gopal Sarkar house via Party Office ,at Khudiram Pally under Lower Bagdogra GP. Naxalbari Panchaya Samiti under 4TH. SFC Fund/20-21
Urgent Repairing work of NH 60 from 132.475 Km to 132.800 Km in stretches by providing repairing pot holes including applying tack coat with cationic emulsion of N H 60 in stretches etc
Repairing of Concrete Road by Bituminous Macadum and repair of road side Drain from Satsangah towards NH-06 within Ward No 06 of Kharagpur Municipality and Barkola GP of Kharagpur -I Panchayet Samity
AMC (year 2025-26) of North Saraswati River from Ch.25800.0 m (D/S of Swetpur NH Bridge) to Ch.24210.0 m (U/s of Bilkuli Bridge) within Chandannagar Municipal Corporation, Dist. Hooghly.
Re-excavation of Canal from Baruttarhingly to Iswardahajalpai Gangamore (Haldi River) via Kasthakhali (NH-41) in Mouza-Baruttarhingly and Iswardahajalpai under Baruttarhingly G.P. within Haldia Panchyat Samity in the District of Purba Medinipur.
AMC (year 2026-27) of North Saraswati River from Ch.25800.0 m (D/S of Swetpur NH Bridge) to Ch.24210.0 m (U/s of Bilkuli Bridge) within Chandannagar Municipal Corporation, Dist. Hooghly.
Setting Up of Control Room and CCTV Surveillance System covering the entire area from Outram Ghat to Sagar Island through DH Road and NH via all intermediate buffer zones during GangaSagar Mela 2022
Upgradation of Road from T03 Part II Sankarachak Rail Gate to Rupnarayanpur(NH 6) under Kharagpur I Block in the District of Paschim Medinipur. Length 16.600 Km. vide Package no. WB-20-1252
Civil work
1254/BPM/N-165/2024
Civil work
Civil work
ISI Marked HDPE/PP Bags For Packaging Foodgrains (Q3)
NH-2 to Durgapur Barrage Road from 0.00 kmp to 6.00 kmp with link of service road of Durgapur ROB (0.7 km), Surfacing work under Asansol Highway Division in the district of Paschim Bardhaman.
Construction of Pedestrain guard rail in between service road and raised concrete drain from 0.55 km to 1.55 km of NH-117(Kona Expressway) in the district of Howarh during the year 2021-22.
Installation of 10 Nos. Solar Light Post at Sansad - 11 NH of Samir Debnath, Prahlad Debnath, Biswajit Debnath, Shekhar Sharma, Premananda Mondal, Badal Das, Pradip Das, Ananda Debnath, Khokan Debnath, Swapan Das under MPGP
Old NH-34 Road from Km 433.510 to Km 441.890 (Surfacing work) and rehabilitation work of Bridge at Km 440.700 over River Sudani under Uttar Dinajpur Highway Division in the district of Uttar Dinajpur.
Restoration of damage of Link Road to NH 41 along the bank of Sankarara Khal Road caused due to laying of PHE pipe line under Tamluk Highway Division in the District of Purba Medinipur
Potholes Repair along the stretches of NH 60 from Ch 408 000 Km to 409 000 Km in the district of Birbhum in the State of West Bengal in the financial year 2020 2021
Hiring of Machinery for Clearance of Landslides and Miscellaneous works from km 26 to km 52 on NH-10 in the State of West Bengal on percentage Rate Basis during the FY 2025-2026
Maintenance of PMGSY Road from NH-41 Connector to Dakshin Osutput under Sahid Matangini Panchayet Samity in the Purba Medinipur District , PACKAGE No-WB-19-73, Total Length 1.70 KM (Proposed Length.1.70 Km. )
Potholes Repair along the stretches of NH 60 from Ch 405 000 Km to 406 000 Km in the districts of Birbhum in the State of West Bengal in the financial year 2020 2021
Emergency rain damage restoration and allied works from 0.00kmp to 3.80kmp of NH-31 to Madhupur Dham Haripur Dham Road under Cooch Behar Highway Division, PWD (R) Directorate in the district of Cooch Behar.
Upgradation of road with Cement Concrete from NH - 512 to the house of Bimal Halder at Shibpur ward no. - 06 , for infrastructure Development under House for All Scheme . Under Buniadpur Municipality. Dist. - D/Dinajpur.
FDR repairing and maintenance work over the damage surface in stretch between Km 7.500 to Km 8.000 on N.H. 512 of Balurghat NH Sub Division Under N.H. Division No. VII, P. W. Roads Directorate
NH-34 Gadamarahat to Mondouri Road from 0.00 kmp to 9.00 kmp (Except from 2.071 km to 3.704 km), Surfacing work under Barasat Highway Division No. II in the district of North 24 Parganas
Construction of Bituminous road from NH-34(near Khagra ghat Rail Gate) to Bagmari village under Berhampore and Msd-Jiaganj block (Savings Fund of R/M of Rural Road other than PMGSY 27.30 Crore)
Repair and stitching of of stretches from Ch 49 00 Km to 50 00 Km of NH 2Bin the districts of Birbhum in the State of West Bengal in the financial year 2021 2022
FDR repairing and maintenance work over the damage surface in stretch between Km 15.000 to Km 17.000 on N.H. 512 of Balurghat NH Sub Division Under N.H. Division No. VII, P. W. Roads Directorate
Repair and stitching of stretches from Ch 319 00 Km to 320 00 Km of NH 60 in the districts of Birbhum in the State of West Bengal in the financial year 2021 2022
Restoration of Different dia Distribution Pipeline (Zone - II) of Balarampur Water Supply Scheme due to upcoming NH-32 Road Project from KM- 113.000 to 126.000, Block - Balarampur, Dist - Purulia, Under Purulia Division, P.H.E. Dte.
Potholes repair along the stretches of NH 60 from Ch 406 000 Km to 407 000 Km in the districts of Birbhum in the State of West Bengal in the financial year 2020-21
Repair of Potholes and Stitching of stretches between 317000 Km and 318 000 Km of NH 60 in the districts of Birbhum in the State of West Bengal in the financial year 2020 2021
Construction of B.P. Road from Shop of Niranjan Debnath near NH to the house of Paban Ojha connection Concrete road with a link road from the land of Bidesh Das to connecting PMGSY road
Rajganj - Sankrail Road Link To NH-6 from 0.00 Kmp. to 4.250 Km., Pot-Holes and Patch Repair work under Howrah Highway Sub-Division of Howrah Highway Division in the district of Howrah, PWRD
Emergent Repairing work from 0.00km to 0.800km at NH 2 By Pass to Naity Road Via Gobra R.S. Road by patching potholes with Stone metal consolidation Premix carpet and Seal Coat work in patches
Construction and Repairing of boundary wall and approach road providing Brickwork, Plastering, concrete work etc. at Nabagram Stack-yard under NH Division No-I, in the district of Hooghly during the year 2023-24.
Repair and rehabilitation of damaged deck slab 4th no vent towards Rampurhat of Kargil Bridge at 354 70 Km of NH 14 in the district of Birbhum West Bengal in the year 2024 2025
Potholes Repair along the stretches of NH 60 from Ch 403 500 Km to 405 000 Km in the districts of Birbhum in the State of West Bengal in the financial year 2020 2021
Repairing of Post 5 Years Maintenance Works under PMGSY from VIP PARA TO DANGA LINE (L039 TO MANGALBARI HAT) (L025-NH 31 TO MANGALBARI HAT) Package No WB10-17(B), Length 4.000km, Block Matiali
Preparation of Project Report for both Strengthening and Performance Based Maintenance Contract PBMC of NH 14 for the stretch 374 00 kmp Mollarpur 401 00 kmp Nalhati in the District of Birbhum West Bengal
Restoration of Different dia Distribution Pipeline (Zone - I) of Balarampur Water Supply Scheme due to upcoming NH-32 Road Project from KM- 113.000 to 126.000, Block - Balarampur, Dist - Purulia, Under Purulia Division, P.H.E. Dte.
CONSTRUCTION OF CC DRAIN FROM BIJAY CHHETRI HOUSE TO NH 31 BRIDGE AT SANSAD 14 (20/14) UNDER BAGRAKOTE GRAM PANCHAYET, Mal Block, Jalpaiguri. (15TH FC,TIED GRANT,Activity ID- 112578791 of 2025-26)