Loading…
Loading…
5,047 results • Best match
Plz refer NIT
Please Refer BOQ
please refer BOQ
Plz refer NIT
Refer BOQ
Please Refer BOQ
REFER BOQ
PLEASE REFER NIT
Plz refer BOQ
please refer BOQ
Please Refer BOQ
Please refer BOQ
Construction
Please Refer BOQ
REFER BOQ
please refer BOQ
please refer BOQ
Renovation
AS PER NIT
AS PER NIT
As per NIT
AS PER THE NIT ATTACHED
AS PER NIT
as per NIT
AS PER BOQ
Refer BoQ
AS PER NIT
Please Read BOQ
refer to BOQ
PLS REFER NIT
PLEASE REFER NIT
Construction of 3 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, Construction of 3 Nos Pump Room, 2 Nos Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Mangota Chaprian (JJM).
Maintenance works including Petty works to be executed at site as per the necessity demands emergent nature for up keeping of Ranjan Canal and its distribution and Sump System Stage Contract 2022-23 for a period of six months
Construction of 0.18 lac Gallons SR,0.18 lac Gallons Sump, 02 NO Sluice valve chambers, Protection work,Chain link fencing around various structures and Laying Fitting of Supply main, Sub main and Distribution system for WSS NARSANGRI Kachwan JJM
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Basawa
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Kieur
Water Supply scheme Thandi Kassi under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, 1 No. pump room building, 1 No. 20000 Glns Sump Tank and 1 No. compound wall at WSS Thandi kassi
Construction Testing and Commissioning of Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall along with allied works for Jal Shakti PHE Division Akhnoor under JJM for WSS Chagyal
Retrofitting of water supply scheme by way of providing laying and fitting of pipes construction of 0.45 lacs gallons capacity RCC Sump and pump operator Quarter including installation of 286 Nos FHTCs with Electro/Mechanical Components for Lift WS
Construction of 1.00 Lac Gallons, 0.50 Lac Gallons, 0.30 Lac Gallons, 0.20 Lac Gallons Capacity RCC Service Reservoirs with Sluice Chamber Clear Water Sump, Chain Link Fencing Around Structures, Tiled Path and Anchor/Saddle Blocks for 100 percent FHT
Construction Of 0.15 lac Gallons SR, 0.15lac Gallons Sump, R-Wall, Chain link fencing around various structures, 02 No Sluice valve Chambers and Laying Fitting of Supply main, sub main and Distribution system for wss Inderbinthal GB Under JJM.
Construction of 09 Nos. (Nine Nos.) 5000 gallons per hour capacity Rapid Sand Filtration Plant along with Construction of Pump Room , Construction of 0.20 lacs glns cap. Sump Tank , Construction of Intake well , Compound Wall each under WSS Kalas,
Construction of 01 No.10000 gallons per hour capacity Rapid Sand Filtration Plant, along with Construction of Pump Room, Construction of 0.50 lacs glns cap. Sump Tank, Compound Wall, Const. of intake well under WSS Badhoon-B, (under JJM).
Construction of 1 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 20000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Dabber Potha B (JJM).
Augmentation of source, laying and filling of earth cushion over necked pipes at spots, protection to clear water sump at plant site, and rectification of damaged/ leaking pipe network, for smooth running of water supply at Sonamarg during winters
Water Supply scheme Draj-B under JJM , Components Construction of 4000 glns per hour capacity Slow Sand Filteration Plant, Dug Well, 1 No. Pump room Building , 1 No. 20000 Glns Sump Tank and compound wall at WSS Draj-B
CO Sentry post, strom water Drains, Main pathway, Connecting path way, underground water storage sump with water supply Distribution lines and supplying and installation of RO Plant including base ETC at BOP Pindi of Now 148 BN SH Electrical Work