Loading…
Loading…
2,584 results • Best match
Water tank maintenance
Water tank Maintenance
water tank construction
Annual Plan-2022-23 - Perinthalmanna Block Panchayath - Project No 027-23 - Construction At Drinking Water Tank Connection Extension In Kallu Vettu Kuzhi in Keezhattur GP (Pattikkad Division)-General Civil Work
Construction of a 110 mm diameter borewell at Manambuzha GWLPS and near Nilakkal Water Tank in Kunnathur Grama Panchayath and Pathanapuram Block Panchayath Office Compound, under the LSGD Deposit Work
S-763/23-SRV Govt(M) VHSS HSS ,Roof maintenance in main building, wooden stair maintenance, wash area near south gate,construction of water tank for kitchen-General Civil Work
Annual Plan-ANGAMALY MUNICIPALITY 2025-26 -Pandavath Paramb Road, Reethapally Bylane Road Retaring ,Water Tank Bylane Road Bakery Byroad Maintenance Ward 28 (PRO NO 197/2026)-AMC-General Civil Work
GENERAL-VBP 2023-24 Construction of side wall in Parayil thodu Near Pazhaveettumoozhy for easy flow of water to Kulakkode drinking water tank-SO- 183/24-General Civil Work-1
PW3-53030/22Annual Plan-TCR Corp2022-2023 Ollur Zonal Div 29 INTERLOCKING TILE laying at Aryankulangara Water Tank road, Edakunny Village Vazhy-PRO NO 912/2022-23-General Civil Work
Construction of drain (60m long apprx.) at eastern side of the cooling tower. Construction of dewatering sump adjacent to Pump house (3.9m x 1.4mx 2m). Construction of Kerb wall on top of pump house. Construction of cable tray footing near U
JJM WSS to Vellathooval Panchayath in Idukki District Package IIConstruction of OHSR cum Pump house near Kathippara and GLSR at SouthKathippara, Supply and erection of CF pumpset at Kathipara and laying distribution line to Zone 7 and 8
Supply and Laying CWPM from 8th Mile to Proposed GLSR at Pothenpuram, Design and Construction of 8.5LL GLSR at Pothenpuram, Supplying and Laying DI/PVC/GI Distribution Network and Providing FHTCs in ZONE 2 from GLSR at Pothenpuram
CONSTRUCTION OF NEW WELL, CONSTRUCTION OF NEW OVERHEAD TANK AND PUMP HOUSE, BOUNDARY WALLS (near drainage)
JJM 2020 21 Pallichal Panchayath Phase 2a 2b Water supply line extension providing water connections from existing and proposed pipelines to households in Pallichal Grama Panchayath and 300mm DI K9 from Channel Jn at Balaramapuram to 8.70 LL GLSR
State Plan-state plan 2024-25-Rehablitation / Improvement works of urban water supply scheme (Kasaragod WSS - 11 lakh Litre OHSR and 21 lakh Litre GLSR at Vidyanagar Providing Drainage System at KWA campus, Vidyanagar compound -Laying of new drainage
GENERAL-GO Flat Jawaharnagar-Providing and Fixing of New PVC Water Tanks with Pump and laying of PVC Pipes in connection with water tanks.-General Civil Work
fixing ferrous cement pump house construction of RCC platfrorm 10000 liters capacity HDPE water tank and 221 m pumping main and 400m distribution line etc
PROVISION OF WATER SENSOR AND CONTROLLER FOR OH AND UG SUMP FOR PROVISION OF DEFICIENT MARRIED ACCN FOR SAILORS UNDER GE FORT KOCHI
DEPOSIT-Providing Pump set to Sump near mens hostel at Govt Engineering college Thrissur-SITC of 10 HP pump set-General Electrical work
State Plan-State plan -2025- 2026-Maintenance of Roof slab of sump in NES block booster pump house at Nainamkonam in Kizhuvilam Panchayath
DEPOSIT-Construction Of Maternity Unit At THQH Peermade -Phase 3 And Construction of Sump and Pump house.- Balance Work.-General Civil Work-1
State Plan-2018-19-e-LAMS Providing new UV and GI Sheet roofing in sump of the main pump house at KVASU,Mannuthy
Construction of Bore well ,Sump well pipe line ,motor pump set,water supply arrangements for MRS Thiruvilwamala at chelakkara-providing motor pump set
500Ltr with ISI mark
JJM-2020-21-VAZHOOR PANCHAYATH-KOTTAYAM DISTRICT-Phase I-Package 2-SUPPLYING AND LAYING DI/PVC/GI DISTRIBUTION NETWORK FROM CHALLOLI GLSR ALONG NH 183 FROM 14th MILE-KODUNGOOR-19th MILE AND PROVIDING FHTCs IN VAZHOOR PANCHAYATH PHASE-II ZONE -3
Jal Jeevan Mission (JJM)-Providing FHTCs from WSS to Mulankunnathukavu Pt. in Thrissur District - Phase III-Laying of 200 mm DI K9 clear water pumping main from GLSR near Poomala Dam to OHSR at Chottupara 5th SLSSC Package VIII-Pipeline Work
JJM 2021 2024 Anad Nanniyode panchayaths CWSS to Anad Kurupuzha Palode villages Phase III Package I II Supplying Laying Testing and Commissioning of Clear Water Pumping Main Gravity Main Clear Water Pump Set at WTP to GLSR at Chullimanoor Clear
Work Name Annual Plan SO202 23 Ward 26 Installing water tank on Mannoppilly Common Facility Centre ang laying drinking water pipe line in ward 26 of Kalamassery Municipality General Civil Work
State Plan 2022-23- ISP /22-23/19- Maintenance to electrical installation and streetlight in all campus - Solar street lights to water tank area and ANP block at KVASU, Mannuthy Campus
Pandalam Valiyakoickal Devaswom in Aranmula Group- Urgent Repair and Maintenance to the Toilet Block, Cleaning Septic Tank and Water Tank in Connection With M and M Festival in 1201 ME Reg.
Re-e-tender- DEPOSIT-Utility shifting- Work under SC development Ambedkar Grama Vikasana Programme at Kundayittammal colony, Concrete road - From Shanmuga house to Kunnath Ambootty house (Water tank road)-Pipeline Work
Annual Plan-KDSY 2025-26 PRO NO 412/26 Dismantling and removal of debris drinking water project from the old water tank of soubhaghya-KODASSERY GP CHALAKKUDY BP-General Civil Work
Providing Community Micro Irrigation Construction of sump, Fertigation Room, Water Conveyance Pipe and Electrification for Micro Irrigation work
ARMO to FCI depot at Valiathura for the year 2022-23-Pre-monsoon Repair works, providing eave gutter to MG-1 and 2, replacement of two overhead water tanks, rectification of sunken verandah at MG IV and other urgent maintenance works of the depot
Supply and laying clear water pumping mains construction of sump cum pump houseconstruction of GLSR at various zone supply and erection of pump sets andproviding distribution system and providing FHTC to various zones of Kanthalloor Panchayath
JJM 2022 24 CWSS to Peringamala Grama Panchayath in Thiruvananthapuram district Supplying Laying testing and Commissioning of 150mm DIK9 for 17.4 km Clear Water Pumping main from Sump at Ayiravallykunu WTP to proposed GLSR at Madathara
CWSS to Nattika Firka -Annual maintenance of 400mm Premo Gravity main From Agastheswaram Temple to Mathilakam Sump - Mathilakam section for the year 2021-2022
DEPOSIT-Mathaimotta-80 mm GI pumping line from the proposed sump at Mathaimotta to the existing tank at Mathaimotta - Reach 2-General Civil Work
Annual Plan-2022-23 PROJECT NO.273-CONSTRUCTION OF SUMP TANK AND ALLIED WORKS IN LIFE FLAT AT WARD NO.16-General Civil Work
GENERAL-Action Plan 2024 2025-MVIPPalakkuzha LI Scheme-Urgent Removal of silt and cabomba (water born plant) in the sump well-General Civil Work
Balance work of sump at Mini Civil Station Kunnamangalam , Kozhikode- Overhaulling motor pumpset and providing KSEB Service connecton to Common Area- General Electrical Work
GENERAL-IG safe house and IG camp office, Florican Hill road, Malaparamba.-Urgent repairing of damaged pump set in the sump - General Electrical Work
DEPOSIT KIIFB Muzhapilangad WSS to Anjarakandy Peralassery and adjoining panchayath water supply arrangement to sump at KTDC beach resort in Muzhapilangad panchayath Pipeline Work
JJM-CWSS to Kuttippuram Thirunnavaya Athavanad and Marakkara Panchayaths-Package 2 - Construction of Sump and OHSR at Kinfra Park and Clear Water Pumping Mains
DEPOSIT-Mathaimotta-80 mm GI pumping line from the proposed sump at Mathaimotta to the existing tank at Mathaimotta - Reach 1-General Civil Work
Repair/replacement of water supply pipe line, fittings etc and Cleaning of RCC OH reservoir, UG sump etc at Kannur under AGE (I) Cannanore.
REPAIRS AND MAINTENANCE OF WATER SUPPLY LINES, CI/GI LINE SLUICE VALVE UG SUMP AND REPAIRS TO PUMP SETS UNDER AGE B/R ALWAYE
GENERAL-Directorate of Health Services - Construction of a sump - Providing supply connection to newly installed water pumpDHS- water Pump - Electric supply -General Electrical Work
WATER TANK COMPLETION,PIPELINES