Loading…
Loading…
2,995 results • Best match
CONSTRUCTION OF 1.5MX1.5MX1M WATER TANK IN DIFFERENT VILLAGES OF BEHTA BLOCK OF SITAPUR DISTRICT
CONSTRUCTION OF 1.5MX1.5MX1M WATER TANK IN DIFFERENT VILLAGES OF BISWAN BLOCK OF SITAPUR DISTRICT
AS PER TENDER DOCUMENTS
As per Tender Documents
tubewell, OHT, pump house, staff quarter, pipeline etc
OHT Tubewell Distribution System Pump House House Connection
OPERATION and MAINTENANCE OF SEWAGE TREATMENT PLANT (STP) AND WATER TREATMENT PLANT (WTP) including cleaning of sewer chambers, water tanks at SAI NSRC Lucknow
M/o W/s (Cleaning of OHT and UGR/CGR and Re-Development of TW and S/L Pea Gravel in Network Sector-83, Hosiery Complex and Village-Nagla Charandas, Illabans, Mangrouli Chhaprouli) Noida. (AMC for Two Years)
Pipe line Extension/Replacement 1.5 km, Repairing work of Pump house, Staff Quarter, OHT Boundary wall. Functional House Tap Connections (FHTC) works and other appurtenant works required with all materials, labour etc complete in Anda village w/s
Painting colour washing in boundry wall (Frant side) gate and gate piller check post Construction and Repair of CC Aproch road infront of Main Gate Painting and Colour Washing of 100 KL OHT 15M Staiging at NMY Chhutmalpur
Pipe line Extension/ Replacement 1.200 km, Repairing work of Pump house, OHT, Boundary wall. Construction of Staff Quarter 1 No. FHTC work and other related works required with all materials, labour etc complete in Abhaidepur village w/s
RE-DEVELOPMENT OF BOREWELL AT LOTUS NVL NEW HAVLOCK OLD HAVLOCK STA JAIL ROAD DAD GFA AND NVL INCL CONNECTED WKS AND CLEANING OF OHT IN THE AREA OF AGE EXT (W/S) UNDER GE E/M LUCKNOW
Pipe line Extension/ Replacement 4.36 km, rising main pipe line 0.22 Km, construction of OHT 200 kl/14mtr staging and Repairing work of Pump house, Boundry wall, FHTC works (694) and other related works at Bhendi W/s
Pipeline Extension 63mm Dia. and Functional House Tap Connections FHTC Works 1689 Nos. In New Existing WS Lines OHT repairing painting and other mentioned work in tender with all materials labour etc. Complete in PAKARI BUZURG PARASUPUR M
RE-DEVELOPMENT OF BOREWELL AT HRDC NEIL LINES AMC JCOS MESS OLD BS MARG 1MT AND SULATANPUR ROAD INCL CONNECTED WKS AND CLEANING OF OHT IN THE AREA OF AGE EXT (W/S) UNDER GE E/M LUCKNOW
PROVN OF SECURITY ENTERY AND EXIT INCLUDING MAIN GATE, ROAD FURNITURE AND SECURITY NEAR NH-709A FOR 8 EW BN, PROVN OF ADDN/ ALTN TO OR MESS AND PROVN OF PROTECTIVE MONKEY NETS FOR 115 X WATER TANK AND INSTL OF IRON NET OVER THE GARBAGE PIT AT 8 EW BN
Cleaning of Sump, desilting of Sumpwell, Effluent line, etc
Repair and maintenance of 33KV 6.6KV HT OH line and realignment, extension of HT OH lines feeding power to HT pumps and other HEMMs alongwith providing earthpits for pump motor starter Field switches to be installed in sump at Bina Project
Providing shelters for switch and transformer along with sitting arrangement and OB filled PVC bags at turra and purewa sump and Providing Gabion Wall along north and south dump, at central entry, around main sumps and various other locations at Bina
Cleaning of sump near ETP and Cutting of kutcha drain from mobile crusher to RCC box culvert and east section drain including protection work to arrest over flown silt from OB dump during monsoon in east section at Dudhichua Project.
Repair and maintenance of 33KV 6.6KV HT OH line and realignment extension of HT OH lines feeding power to HT pumps and other HEMMs alongwith providing earthpits for pump motor starter field switches to be installed in sump at Bina Project
REPAIR/MAINT OF AVIATION LIGHT ALONG WITH CLEANING OF OH TANK, UG SUMP OF MG ROAD EAST AND WEST AND OTHER MISC WORK AT DIFFERENT PUMP HOUSES IN THE AREA OF AGE E/M EXT (WS) UNDER GE E/M LUCKNOW
CONSTRUCTION OF RCC RETAINING WALL, ROOF TREATMENT, ROAD, SUMP TANK WITH DIESEL PUMP EARTH FILLING IN SWITHCH YARD FOR REMOVAL OF WATER LOGGING PROBLEM AND OTHER ASSOCIATED CIVIL WORKS AT 33 11 KV SUB STATION GIJROLI--II (OLD) DISTT. HATHRAS
Water Supply
Synthetic Net 38 feetx46feet, OP Pit Net, Water Heater Barrel 200 Ltr, Room Heater Single Rod, Water Tank Rectangle, Water Tank 200 Ltr, Steel Tea Container, Steel Tiffin 5 Stap, Beetel Phone M71, Plastic Tray
PROVN OF WATER PIPE LINE FROM MAIN WATER TANK TO TOILETS ,BATH ROOMS AND COOK HOUSE AT BONIYAR,PROVN OF TOILET NEAR BLDG NO T-64 OF INF BN AT URI,COVERED PASSAGE IN INF BDE CAMP AT RAMPUR ,PROVN OF TOILET FOR OR CVY LINE,FD REGT AT URI
AS PER TENDER DOCUMENTS
Pipeline Extension- 63mm Dia. and Functional House Tap Connections FHTC Works 799 Nos. In New Existing WS Lines, OHT repairing painting other mentioned work in tender with all materials, labour, tp etc. Complete in KAHINAUR, BELCHAURA and DUMRAON W
Leakage Repairing of 150 mm dia pipe line replacement of 150 mm dia M.S pipe line 6.50 mtr with searching leakage point and making interconnection 350 mm X 150 mm dia near OHT bhoot bangala barra 2 ward 77 .
Pipeline Extension- 63mm Dia. and Functional House Tap Connections FHTC Works 923 Nos. In New Existing WS Lines, OHT repairing painting other mentioned work in tender with all materials, labour, t p etc. Complete in SEMARI JAMALPUR and LAKHANAUR
Pipe line Extension Replacement of 63 mm Dia Pipes 0.500 km Repairing work of Rising main Pump house OHT. Construction of Boundry wall Functional House Tap Connections (FHTC) works (466) and other appurtenant works in Somai village w.s. Scheme
Supply of all materials, labour for Construction of OHT, CWR, PH, SQ, BW, Distribution System, RM, TW with SCADA automation as per specifications in tender document complete in all respect Sahabad NPP Phase - I Reorganization WSS under AMRUT 2.0
C/O WORKSHOP,PUMP HOUSE, GAURD ROOM, OHT WITH BOARING AND TUBEWEL, RAIN WATER HARWESTING, FIRE FIGHTING, EXTERNAL and INTERNAL ELECTRIC, WATER SUPPLY and SANITORY WORK AND BALANCE WORK OF MAIN BUILDING AT GOVT. GIRLS POLYTECHINC HARDOI(ATARAULI) ALI
Pipeline Extension- 63mm Dia. and Functional House Tap Connections FHTC Works 958 Nos. In New Existing WS Lines, OHT repairing painting other mentioned work in tender with all materials, labour, tp etc. Complete in RUKUNPURA and FATEHPUR TAL NARJA
M/o W/s (Two year Maintenance, Repairing Replacement of Old Chocked and damaged PVC, M.S., C.I./D.I. Water line Ranney Well, OHT/UGR main raising water line and chamber at different place in Sub-Division Jal-I) Noida
Pipe line Extension/ Replacement of 63 mm Pipes 1.500 km Repairing work of Pump house OHT Construction of Staff Quarter 1 No. Functional House Tap Connections (FHTC) works (304) and other appurtenant works in Udotpura Jagir village ws Scheme
Provision of 225Kl RCC OHT in lieu of old dilapidated steel tank along with pump house to cope-up with emergencies &replacement of damaged/wornout pipe lines and fittings in South colony, HRH and RG under Sr.DEN/HQ/MB.
Custom Bid for Services - Sludge Removal Vacuum and High Pressure Jet Cleaning Antibacterial Chemical Treatment with Altraviolet Radiation Treatment of 10 Nos OHT and 1 No S Well as per Annexure A Similar Category Collection & Disposal Waste Management Service
A/R AND M/O TO GPRA COLONY AT SULEM SARAI BEGUM SARAI AND CPWD STAFF COLONY AT JAYANTIPUR ALLAHABAD DURIN G2023-24 (SH CLEANING OF SEWERLINES OVER HEAD TANK SUMP AND OPEN DRAINS FOR GPRA COLONY PRAYAGRAJ) Subwork/Packages: CLEANING OF SEWER LINE
MAINT AND REPAIR OF LOWERING / LIFTING OF SUBMERSIBLE PUMP AND MOTOR, CENTRIFUGAL PUMP AND MOTOR, INCL REPLACEMENT OF PARTS, CLEANING OF OVER HEAD TANK/SEMI UG SUMP AND ALLIED WORKS OF WATER SUPPLY AT HQ UB AREA UNDER GE (EAST) BAREILLY.
2- Boundary wall work in the water tank complex near Municipal Council Khair Purani Tehsil
Construction of Pump House (3.60x3.00M) with chloronome (1.80Mx1.20M) at Haidrabad Unnao (Near Old Water Tank)
Instalation Work of Submersible pump And Water Tank At 10 Different Places of NP Nagram
Dismantaling old Pump house (3.60x3.00M) with chloronome (1.80Mx1.20M) at Haidrabad Unnao (Near Old Water Tank)
CONSTRUCTION OF OHT PIPE LINES PUMPHOUSE CONNECTIONS AND OTHERS
T.w, Pump House, OHT, Pipe Ling, Boundary wall etc.
Repairing of leakage, connection of OHT, CWR, Feeder main
PROVN OF WATER PIPE LINE FROM MAIN WATER TANK TO TOILETS ,BATH ROOMS AND COOK HOUSE AT BONIYAR,PROVN OF TOILET NEAR BLDG NO T-64 OF INF BN AT URI,COVERED PASSAGE IN INF BDE CAMP AT RAMPUR ,PROVN OF TOILET FOR OR CVY LINE,FD REGT AT URI,PROVN OF STORE
PROVN OF MOBILISATION STORE AND 54 BARS/GRILLS AT 609 EME BN, PROVN OF 01 X COVERED CYCLE/SCOOTER PARKING SHED AT 522 ASC BN, AND ADDL/ALTN OF STATIC WATER TANK OF STOCKING WING OF RAPID (S) UNDER AGE B/R-IV AND AGE E/M-II OF GE (SOUTH) MEERUT CANTT
Pipe line Extension Replacement of 63 mm Dia Pipes-1.400 km Repairing work of Pump house OHT Construction of Boundry wall Staff Quarter 1 No Functional House Tap Connections (FHTC) works (428) and other appurtenant works in Naraul village ws Scheme