Loading…
Loading…
4,358 results • Best match
NCTPS I ES Circle EM I Dn SD I Annual Overhauling DG Set I II III Attending minor repair works Dismantling and cleaning of Heat exchanger coolant tank Replacement of coolant and painting of cooling tower and its pipelines during 2024 25
TTPS Mech II BM Unit II Replacement of wornout corroded structural supports painting of structurals removal of existing wornout G I. sheets and providing new galvalume sheets in 32 Mtr elevation above hot air duct and 52Mtr elevation above walk way i
TTPS Mech II AHP Dismantling the existing wornout MS Grill and wornout structural supports fabrication of new structural supports erection and painting of new MS grill and new MS structural supports in Ash slurry sump 4A Ash water tank manhole for Un
NCTPS I ES Circle EM II Dn SDn II Painting of HT and LT Switchgear panels 5 MVA Power Transformer 250 KVA Service Transformer VCB NGR NGT externally with two coats of Smoke grey paint at Recovery Water Pump House at NCTPS I
TTPS Operation Circle MPM-II ACP Rubber lining in the existing air duct at O mtr near sea water booster pump, New air duct fabrication, erection and painting the incoming duct of O mtr cable gallery at Unit V Air washer duct
El.D.C.NO.South /10797/2019-Provision of painting of 2165 nos 6/7 mtr lamp post and 143 nos 8mtrs lamp post and 2308 lamp post numbering at various streets at saidapet west cit nagar and kotturpuram in div 171 and 172 in zone-13
Sp. 46NCTPS II ES circle EM I Dn U II Turbine Motor Bearing inspection of HT motor for Boiler Feed Pump MDBFP 12MW 11KV Make Ms BHEL in Unit II and replacement of bearings with a new one if necessary and motor painting
Special Repairs of Civil and Electrical works at Ground floor car parking area including MS grill work in mortuary unit and cleaning painting of entire Academic block External and other miscellaneous work in laundry A Block etc in ESIC Hospital and M
El.D.C.No.Centre/5055/2024 Painting of 791 Nos of 3/ 9.5/11 mtr street lamp post at Kamaraj salai Both side Service Road Loop Road in view of Republic day 2025 to Division 114 116 120 121 125 and 126 in Zone 09
MTPSI TM Unit II Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air and renewal of Manhole door gaskets and Overhauling of Safety valves of Receiver Tanks Overhauling of Silica gel type Air drier accessories
El.D.C.No.South/ 0104/2023 Painting of 3607 Nos of 2/3/6/7/8 Mtr lamp post 251 Nos of KIOSK Pillar box and 7904 nos of Numbering of street lamp post at Various Location in Dn 185 186 187 188 Zone 14
MTPS I CA CWS II MTPS CA CWS II Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal and Painting of Intake Screens of CWP 4A 4B and 4C of Unit IV during AOH 2021 22
El.D.C.No.South/5208/2025 Replacement of 2 Nos of old damaged KIOSK pillar boxes erection of 3 Nos of 7 Mtr street lamp post Painting of 84 Nos of 9.5/11 Mtr Street Lamp post and Electrification Work in Dn 184 Zone 14
MTPS TM Unit I Cleaning and painting of inner and Outer portion of Receiver Tanks of 1 2 for Instrument Air system Service Air system renewal of Manhole door gaskets Overhauling of Safety valves of Receiver Tanks overhauling of 150mm Gate valve
Inter and External painting of Amber-A, Amber-B, Coral, Topaz, Ruby and OPAL-D Hostels at NIT campus, Thuvakudi, Trichy SH Rendering the services of Office Assistant in the O/o the Superintending Engineer Trichy for the period of 12 months
Renovation of central excise and customs office, Bibikulam, Madurai Providing vitrified tile / granite flooring, renovating toilets, aluminium windows,false celing, internal and external painting, SH: providing inspection vehicle for madurai central subdivision-I, CPWD, Madurai for the period from nov-2024-may-2025
External repair of main building including structure strengthening external plastering and painting replacement of water supply lines and sanitary lines in the terrace and Duct portions repair of aluminium window shutter by replacing EPDM Gaskets Nephrone at CIBA Hqrs R A Puram Chennai
Dear Sir/Madam, SUBJECT: “PAINTING OF PRODUCT PIPELINE WITH COLOUR CODE/BAND AT BPCL IRUGUR TOP INSTALLATION” CRFQ NO: 1000459319 SYSTEM ID: 25802 due on 20.07.2026 @12:00 hrs 1. You are invited to submit your offer as E-bids for the above work on the terms and conditions contained in this tender document. 2. This tender document consists of the following annexure, which are enclosed: a. General conditions of contract b. Special condition of Contract c. Scope of work d. Tender Work Sheet (BOQ) e. Safety requirements (Health, Safety & Environment) f. Bid Declaration Form - Annexure-F g. Integrity pact (if applicable)- Annexure-G h. Deviation Sheet (if applicable) 4. Please visit the website https://bpcltenders.eproc.in/ for participating in this tender process and submitting your bid online. 5. Your online bid should be submitted on or before the due date of this tender. 6. E-tender system will automatically close on the due date and time and bidders will not be able to submit their bids after closing time. Bids not in the prescribed format are liable to be rejected. BPCL does not take any responsibility for any delay in submission of online bids due to connectivity problems or non-availability of site and/or other documents/instruments to be submitted in physical form due to postal delay. No claims on this account shall be entertained. 7. Bidders are requested to read carefully full scope, work Specifications and tender terms and conditions and understand and make site and participate. Pre-bid meeting will be from 07-07-2026 to 19.07.2026 at BPCL Irugur Installation. Please present without fail. ok
Custom Bid for Services - Reconfiguration of LR11350 heavy duty crawler crane application of lubricant on wire ropes and touch up painting ITEM NO1 Reconfiguration of LR11350 crane from SDWBW6660 to SDWBW6642 QTY 2 NOs, Custom Bid for Services - ITEM ... up painting on ...
BRUSH FOR PAINTING PURPOSE-100MM FLATSPL, BRUSH FOR PAINTING PURPOSE-75MM FLATSPL, BRUSH FOR PAINTING PURPOSE-50MM FLATSPL, BRUSH FOR PAINTING PURPOSE-25MM FLATSPL, BRUSH FOR PAINTING PURPOSE - 13MM FLATSPL, LETTER WRITING BRUSH - NO-12, LETTER WRITING BRUSH - NO-9, LETTER WRITING BRUSH - NO-7, LETTER WRITING BRUSH - NO-5, LETTER WRITING BRUSH - NO-3, LETTER WRITING BRUSH - NO-1, CLEANING NYLON SPL BRUSH - 100MM, CLEANING NYLON SPL BRUSH - 75MM, CLEANING NYLON SPL BRUSH - 50 MM
Cu slag Blasting SA 2 5 Preparation, Primer Inorganic Zinc Silicate, Manual or Power Tool St2 or St3 Surface Prepar, Primer Surface tolerant epoxy 2component, Midcoat H B GlassFlake Epoxy, Midcoat Polyamide Epoxy MIO, Finish 2 Pack PU finish
Painting one coat of Red Oxide metal primer for both Inner and Outer Surfaces of Pre fabricated M.S. Cooling water pipes, Raw material MS Plates lying in the Open Storage yard andFOPH area and wherever required at Boiler area, ESP area and mat
Special repairs to leaky roof and painting in PHC at Thirumazhisai
Special repairs to painting and other repairs in GHS at Goonankuppm.
Special repairs to leaky roof and painting in HSC at Kollapancheri
Special repairs to leaky roof and painting in PHC at Nemam
charges for, Supply and working, supply and installation, supply and painting
Civil- Improvement Works- Providing Acid proof enamel painting in MCR etc
Painting of quarters building at Zirconium Complex Township, Pazhayakayal, Tuticorin - 628152
Painting of 527 nos of 8mt octagonal lamp post and 264 nos of 3mt park light poles at Kamaraj salai Both side, Service Road, (from Napier bridge to Light House ) in view of Republic Day 2022 in Dn- 114, 116, 120, 121 and 125, zone 9
NCTPS ES Circle EM I Dn S Dn I Complete overhauling of spare 2 MVA Power transformer SL No 880C 017 2 including drying its core and windings in hot oven hot oil circulation painting complete testing and transportation charges from NCTPS I to wo
El.D.C.No.South/ 4996/2022 Painting of 121 Nos of KIOSK Pillar box 808 Nos of Construction of new plain cement concrete pedestal for 2/3/6/7/8/9/ 9.5/11 Mtr lamp post and 4956 nos of Numbering in Dn 171 173 174 Z 13
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
El.D.C.No.South/3235/ 2025 Painting of 1915 Nos of 6/7/9.5/11 mtr street lamp post 141 Nos of KIOSK pillar box and 4817 Nos of Numbering of Street lamp post at various locations in Narayanapuram and Jalladianpet in Dn 189 191 Zone 14
El.D.C.No.Centre/2200/2025/ Supply and erection of 16 Nos of KIOSK Pillar Boxes, Painting and Numbering of 1492 Nos of Street lamp posts and 50 Nos of KIOSK Pillar Boxes at Sathya Sai Nagar and Bus Route Roads in Div 101-108, Zone 8.
NCTPS I Operation CAD CWPH Attending to leaks and puncture breakdown works at Cooling Water Pump House by welding in the worn out pipes and valves area and painting the corroded pipe lines for the period of six months from the date of taken o
MTPS I CA CWS II Overhauling of existing ID fan Gearbox for 3 Nos including static balancing of fan blades painting of gear box base frame channel structures fan blades hub and arm sleeves grills and hand rails etc in cooling tower Stage II
REPAIR AND REPLACEMENT OF LT OH LINES, LT UG CABLE, LT POLE, CROSS ARMS, LT INSULATORS, PAINTING OF LT POLES, APFC PANELS, STREET LIGHTS AND ALLIED SERVICES IN OD TECHNICAL AND DOMESTIC AREA AND REPAIR AND MAINT OF CEILING FANS AND ALLIED WORKS AT AF
ECHP-II- Complete releasing and relaying with provision of cable tray clamp for Tie to 7A and 7B HT cables of size 1C x 1000 Sq.mm in the cable gallery from TT-7 to JT-20 including painting of the cable gallery support structures.
TTPS Mech II BM Unit V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year 2
NCTPS I ES Circle EM I Division SDn I Painting of power transformers GT 2 ST 2 and UAT 2A 2B respective NGR NGT GT ST UAT bus ducts during Unit 2 Annual Capital overhauling period for the year 2023 24 at NCTPS I
TTPS Operation Circle Revenue MPM I Unit I Renewal of worn out support and damaged concrete pedestals and painting of newly erected supports for hot air ducts of mill 1A to 1F and providing supports for seal air fan discharge lines of 1C and1D at
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the year
TTPS Mech II BM Unit IV Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the ye
O and M Gap Filling fudn 23-24 Special repairs to the OHT at ward no 8 GKS Nagar, Ward no 09,Indhira Nagar , Ward no 6 SLV Nagar, Thirumagal nagar plastering and Painting , ward no 05 weekly shandy campus in Sulur Town Panchayat
NCTPS I Operation CA Dn CWPH Attending to leaks and puncture Breakdown works by welding in the worn out Pipes and valves area and painting the corroded pipe lines and general house keeping of pump and butterfly valve area at cooling water pump house
SPECIAL REPAIRS TO 4(T) MESS OF MTTI AND PROVN OF ROOF SHED FOR KEROSENE KERBSIDE PUMP FOR SLS AT 23 ED, SHOT BLASTING MACHINE AT PAINTING BAY AT 8 BRD AND IMPROVEMENT OF TOILET NEAR T/34 AT AF STN AVADI UNDER GE AVADI
El.D.C.No.Centre /321/2025/ Supply and Erection of 18 Nos of 9.5 mtr Street lamp posts, Painting and Numbering of 5583 Nos of lamp posts, 143 Nos of Kiosk pillar box at North Avenue, Ram Nagar and various locations in Div 79, 82, 84, Zone 7
Providing Painting and Replacing of Damaged Window and Laying of Electrical Arrangement and repair and Maintianance of 120 HP, 40 Hp , 3 Hp and Vacuum Pump 5Hp, and 3 HP and NRV Valve in HL Colony Water Supply Pumping Station Pammal Area Zone No.01
TTPS Mech II BM Unit IV V Painting of Condensate Storage Tank Outer area inner area and overhauling of boiler fill pump hot well make up pumps and related valves including the cost of paint and other all required materials during overhaul for the y