Loading…
Loading…
5,327 results • Best match
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of SANKAIL Water Supply Scheme of Habibpur Block . under Malda Division, PHE Dte. in the District of Malda. (2nd Call)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of PANNAPUR Water Supply Scheme of Habibpur Block under Malda Division, PHE Dte. in the District of Malda. (3rd Call)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bihari Piped Water Supply Scheme at Ratua-I Block of Malda District under Malda Division, PHE Dte.
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of WARI its adjoining mouza Water Scheme at Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. In the District of
Sinking of 200mm (all through) Big dia. Tube Well of 150 m Deep, Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement, Construction of Boundary Wall and Interconnection between New Tube Well an
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dalla Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Divisio
Construction of 02 nos. (4.80 Mtr. X 3.66 Mtr.) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) for 2nd and 3rd Tubewell sites of BAGI Pipe Water Supply Scheme to accommodate FHTC in Bishnupur-I Block
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Rampur Piped Water Supply Scheme at Chanchal-II Block of Malda District under Malda Division, PHE D
Construction of (Size 4.80m X 3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of ALIPUR Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11493)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Nemua Piped Water Supply Scheme at Old Malda Block of Malda District under Malda Division, PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of JIGIN Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte. (2nd Call)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with 2nd Tube Well Site of Bamangram Piped Water Supply Scheme at Bamangola Dev. Block of Malda District under Malda Division,
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of GANGRAI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11493) (2nd Call)
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Moyna Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division,
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Gun Sankrul Piped Water Supply Scheme at Old Malda Block of Malda District under Malda
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Kankot Piped Water Supply Scheme at Ratua-I Block of Malda District under Malda Division, PHE Dte.
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Mobarakpur Piped Water Supply Scheme at Old Malda Block of Malda District under Malda D
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Kadirpur Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Divi
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of AKALPUR Water Supply Scheme of Gazole Block .under Malda Division, PHE Dte. in the District of Malda. (3rd Call)
Construction of 2 (two) Nos 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Bahirgachhi Piped Water Supply Scheme at Gazole Block of Malda District under Malda Div
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of Bhaluka Fatepur Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Division, PHE Dte, Go
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of CHOUPALDANGA its adjoining mouza Water Scheme at Harishchandrapur-I Dev. Block under Malda Division, PHE Dte. In the Dis
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of KUTUB SAHAR Water Supply Scheme of Gazole Block .under Malda Division P.H.E Dte in the District of Malda. (2nd Call)
Construction of (Size 4.80mX3.66m Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of PIRKHALI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11731) (2nd Call)
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of DEULI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11498) (2nd Call)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Kendua Piped Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dt
Repair of roof by RCC works and APP membrane, plumbing and other tit bit civil works along with one wall of cable trench and cover slab at Joypur 33 by 11KV Sub station under Bishnupur Division in the District of Bankura
REPAIR TO LEAKAGE / SEEPAGE, ROOF TREATMENT, PLASTERING, BRICKWORK, FLOORING, PLUBMING, INTERNAL WATER SUPPLY, SANITARY FITTINGS, JOINERY, ATT, PERIODICAL SERVICES AND CERTAIN MISC REPAIR ETC TO OR MD ACCN AT BMC UNDER GE C) KOLKATA
C O 509 bops for BSF along to the IBB & IPB SH C o 229 BOP s in W B Sector C O 02 BOP s for BSF along IBBSH C O of BOP Sovapur TP P Level in Murshidabad distt in the state of W B i c internal water supply line sanitary installation and electrical works Subwork/Packages: Hiring of inspection vehicle use for AE IV BFD VII IBBZ I CPWD Malda
All as per BOQ
Construction of New Museum Building of Archeological Museum (S plus 3) at Tamluk (Nimtouri), Purba Medinipur, WB SH Building work including pile foundation, internal water supply, sanitary installation, drainage, pathway, internal & external electric installations, fire fighting system, fire alarm system, IP based EPABX, VRF air conditioning syetem, LAN, CCTV, 13 passenger lift, DG set, illumination signage, compound lighting, water pump set and solar photovoltaic generation system
C/o JNV at Balurghat, South Dinajpur, WB. SH: Guest House, Type IV Qtr, cum vice Principal Residential Qtr, Type III Qtr, Type II Qtr, Three storyed Girls dormitory , 02 storied all including sanitary installation etc. i/c electrical installation SW providing services of the inspection vehicle on hire basis for Executive Engineer, Malda Central Division, CPWD,Malda for 12 (twelve) months w.e.f 15.05.2023 to 14.04.2024.
Construction of A Type school building (G plus 2), 4 nos Type-III quarters (G plus 1), 01 no. Type-V quarter, Canteen, Electrical substation, underground sump, boundary walls along with gates & guard room including internal water supply, sanitary installation,...
Construction of 480 Nos. type II G plus 3 storeyed, 24 Nos. Type III G plus 3 storeyed, 12 Nos. Type-IV G plus 3 storeyed and 4 Nos. Type V Duplex Qtrs. including internal water supply, sanitary installation, drainage and electrical installation for Group Centre, CRPF at Musabani, Jamshedpur Jharkhand. SH Providing service of Architectural Assistant for office of SDG, PRK, CPWD, Kolkata.
Construction of Girls Hostel including Internal Water Supply, Sanitary Installation, Drainage, Internal Electrical Installation, Solar Photovoltaic Power Plant and Furniture for IHM (Institute of Hotel Management), Kolkata campus at Taratala, Kolkata. SH:- Construction of Under Ground Sump, 300mm X 200mm dia. Deep Tubewell , R.O Plant and Iron Removal Plant of 35 Cum per hour and Installation of Water Pump Sets at IHM. (Civil & Electrical).
CLEANING/REPAIR OF SEWAGE LINES, MANHOLES, SEPTIC TANKS, SOAK WELL AND CONNECTED WORK AT KATRE VIHAR AND OMQ AREA, REPAIRS/MAINT OF SUNKEN, FLOORING AND ALLIED WORKS IN KV AREA, REPAIRS/MAINT PLUMBING AND SANITARY FITTING AND ALLIED WORKS AT KV AREA
REPAIR CLEANING AND MAINT OF SEWAGE LINE, MANHOLE, SEPTIC TANK INCLUDING PLUMBING TOILET AND PATH, CULVERT, FENCING AND MISC WORK AT MES COLONY AREA AND ADJACENT AREA AND REPAIR/MAINT OF SIGN BOARD AND DUCT COVERS AND REPAIR/MAINT OF E/M INST
REPAIRS TO LEAKAGE/SEEPAGE IN ROOF, CHAJJA, BALCONIES, PLUMBING AND CERTAIN WORKS OF B/R NATURE IN KV AREA, PERIODICAL SERVICE IN RS AREA, TIPNIS AREA ALONGWITH CONNECTED ITEMS, REPAIR /REPLACEMENT OF SEWAGE DISPOSAL SYSTEM AT OMQ AND SMQ AREA AND RE
REPAIRS/MAINT TO PLUMBING AND SANITARY FITTING AND ALLIED WORKS AT OMQ AREA, REPAIR/MAINT OF LT UG CABLE AND CONNECTED ITEMS IN TECHNICAL AREA AND REPAIR/MAINTENANCE AND CONVERSION OF OLD U/S ALUMINIUM WIRING TO FRLSH COPPER WIRING INCLUDING REPLACEM
REPAIR/MAINT OF BLDG ROOFS INCL ROOF TREATMENT/REPAIR TO DAMAGED ROOF SHEETS AND ALLIED ITEMS IN VARIOUS OFFICE BLDGS AT BASRA AREA, REPAIRS CLEANING AND MAINT OF SEWAGE LINE, MANHOLE, SEPTIC TANK INCL PLUMBING TOILET AND PATH,CULVERT,FENCING AND MIS
PERIODICAL SERVICES IN VARIOUS BLDGS IN MES AREA, REPAIRS/MAINT OF JOINERY AND ALLIED WORKS OMQ AREA, REPAIRS/MAINT OF TILING, PLASTERING AND ALLIED WORKS AT RS/TIPNIS, ARJAN AREA, REPAIRS/MAINT OF PLUMBING AND SANITARY FITTING AND ALLIED WORKS AT RS
Civil, Plumbing and Electrical works for Construction of Model AYUSH OPD Building G plus 1 Roof Shed including Borewell pump, SITC of Air Condition and Power backup system at Jiagnaj RH SHD at Jiagnaj RH in the district of Murshidabad, West Bengal un
Day to Day Emergency Maintenance work of Plumbing, Civil and Electrical in Ground floor to Fourth floor including Roof of Hemanta Bhavan,12 B.B.D. Bag, Kol 01, Head Quarter of West Bengal Khadi and Village Industries Board during the year 2024 25 on
Replacement old floor tiles of front waiting zone and fixing joints below the roof along with necessary sanitary fittings at critical care unit training centre of BIjoygarh S G Hospital during the year 2025-26 .
Inside repairing of damaged walls doors windows and sanitary fittings of all toilet blocks of Rabin Hall hostel building (G-4 storied) of Bankura Sammilani Medical College under Bankura Division PWD (Rattierer Saathi) (Civil work)
PURCHASE OF TUBEWELL MATERIALS AND PLUMBING MATERIALS 58794068/2022-23
Improvement of Sanitary, Plumbing and sewerage system at Khidderpore Depot.
Maintenance of various Sanitation and Plumbing under Baruipur Panchayat Samity
Installation of Submersible Pump and Plumbing System at Bhandergacha Boropota
1. GM LOOSE RING FLANGES 2. Stud for Sea Chest Valve 3.Cu Ni deck BHD PCS with GM flange 4. CuNi Dk Bhd Piece with GM Flange, MS/ Al Pad 5. CS Dk Bhd Piece with CS Flange, MS/ Al Pad 6. Al pad for A type projector