Loading…
Loading…
5,327 results • Best match
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Mahendrapur Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under M
Construction of 5.40 mtr.X 3.6 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work Site of KHARBA Water Supply Scheme at Chanchal-I Block of Malda District under Malda Division, PHE Dte.
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of RAJARAMPUR Water Supply Scheme of Habibpur Block . under Malda Division, PHE Dte. in the District of Malda.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sailpur Piped Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of KASTHAMAHAL Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11733)
Construction of Two storied switch room 5.4 x 3.6 with water supply and sanitary arrangement cum godown at 2nd Tube well site of Dakhin Harishpur W/S scheme under Uluberia Sub-Division under the Howrah Division, P.H.E. Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Brindabanbati Piped Water Supply Scheme at Habibpur Block of Malda District under Malda Div
Augmentation of SAJIARA Piped Water Supply Scheme with LDS, Rising main Switch room with and without water supply and sanitary arrangements Construction of 300 cum capacity OHR with 20.0 mtr. Staging height inclusive of soil test and Construction
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dahara Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divisio
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of RAJARAMCHAK Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Uttar Kumedpur Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Dakshin Gouripur Piped Water Supply Scheme at Harishchandrapur-I Block of Malda District under Mald
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Sadlichak Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divi
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of BIJOYRAMPUR Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11496)
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of SALPUKURIA Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11783)
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of KAIKHALI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11730)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at Head Work site of MIANAGAR Water Supply Scheme of Habibpur Block under Malda Division, PHE Dte. in the District of Malda.
Construction of Operator cum Guard Room with water supply and sanitary arrangement for Shyamsundarpur (Zone- IIA and IIB) Water Supply Scheme under Raipur Water Supply Scheme (BRGF Ph-I) under Khatra Sub-Division of Bankura Division, P.H.E. Dte.
Construction of switch room ( 5.40m x 3.60 m) with water supply and sanitary arrangement at Head Work site of Maju Khetra w/s scheme at J.B pur Block under Howrah Sadar Sub- Division under Howrah Division, P.H.E. Dte
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of LAKSHMIKANTAPUR Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11502)
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of DILALBATI Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of JULPIA Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/12234)
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of SAPHKHALI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11781)
Construction of 5.40 mtr.X 3.6mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site of Talbangura its adjoining mouza Water Scheme under Malda Division, PHE Dte. In the District of Malda.
Construction of (Size 4.80mX3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of PANAKUA Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte. (SM/11494)
Construction of (4.80 Mtr. X 3.66 Mtr.) Pump House with water supply and sanitary arrangement at CHAK PARANKANTA KHALI Head Work site of MOGRAHAT-II Block for implementation of JJM under augmentation of surface water based WS scheme
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site at Deonapur Piped Water Supply Scheme at Kaliachak-lll Block under Malda Arsenic Area W/S Division, P.H.E.Dte.
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 3rd Tube Well site of Deonapur Piped Water Supply Scheme at Kaliachak-lll Block under Malda Arsenic Area W/S Division, P.H.E.Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Talsur Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divisio
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement at 2nd Tube Well site. of JOTGOPAL Water Supply Scheme at Englishbazar Block of Malda District under Malda Division, PHE Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Arjuna Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divisio
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Malipakar Piped Water Supply Scheme at Harishchandrapur-II Block of Malda District under Malda Divi
Construction of (Size 4.80m X 3.66m) Pump House with water supply and sanitary arrangement (as per Deptt. drawing) of MATSYAKHALI Pipe Water Supply Scheme in Bishnupur-I block under South 24-Pgns W/S Divn-I, PHE Dte.
Unforeseen & emergency based petty repair/day to day maintenance of Emergency assets such as pipe line & sanitary installation, doors, windows, wooden structures, masonry structure, iron structure, roofing sheet, gutters, iron doors, grill gate etc. & Comprehensive operation of valves (round the clock) of existing water supply pipe lines in C & W Workshop/Liluah and Liluah Railway Colony under AEN/WS/Liluah for 03 years
Construction of Office cum Residential (OCR) complex (G Plus 2) for Subsidiary Intelligency Bureau at Medinipur, West Bengal. SH: Building Work including foundation, Internal water supply, sanitary Installation, drainage, Pathway, internal & external electric installations, fire fighting system, Fire alarm system, split type air conditioning system, LAN, CCTV, access control system, compound lighting, water pump set and solar photovoltaic generation system.
Special Repair of Existing Main Building of Central Store and Training Hall including Plumbing and Sanitary works and Land Development of the Belgachia Campus, 37, K. B. Sarani, Belgachia, Kolkata - 700 037 under WBLDCL for the F.Y. 2024-25.
Emergent replacement of concealed damaged plumbing lines and waste lines in the Toilets of State 6th Pay Commission office at 4th floor and other necessary works of Bikash Bhavan, Salt Lake City, Kolkata-700091,during the year 2025-2026
CLEANING REPAIR AND REPLACEMENT OF SEWAGE LINE SEPTIC TANK AND SOAKAGE WELL DRAINS AND REPAIR OF PLASTERING JOINERY SANITARY FITTING PLUMBING AND PERIODICAL SERVICES TO CERTAIN OTM ACCN AND CERTAIN MISC WORKS AT CHATTEN CHUNGTHANG RANGMA RANGE AND T
CONSTRUCTION CIVIL, PLUMBING and ELECTRICAL WORKS OF MODEL AYUSH OPD BUILDING AT DIFFERENT STATE AYURVEDIC DISPENSARY SAD AND STATE HOMEOPATHIC DISPENSARY SHD IN THE DISTRICT OF MALDA 2nd Call 1. SAD GAJOL AT NURPUR, 2.SHD BABUPUR AT BABUPUR
Civil, Plumbing and Electrical works of Model Ayush OPD at Raiganj SHD at Bhatol PHC including Borewell pump, SITC of Air Condition and Power backup system in the district of Uttar Dinajpur, West Bengal during the year 2025-26.
Urgent repairing of north side duct at main Building Replacement of sanitary plumbing fittings of Honble Justice at 3rd floor mosquito proof net with aluminium sliding at 5th Floor South of Bijan Bijan Bhavan during the year 2025 26
CONSTRUCTION OF A NEW ICDS (145 NO) BUILDING, INSTALLATION OF SUBMERSIBLE PUMP, SANIATARY, PLUMBING, ELECTRIFICATION WORK FOR ICDS BESIDE AMAR SANGHA CLUB, JL NO- 52, PLOT NO- 1455, KH NO- 01 IN BYABATTARHAT PURBA GP UNDER NANDAKUMAR PANCHAYET SAMITY
Civil, Plumbing and Electrical works of Model Ayush OPD at Kunor SHD at Kunor BPHC including Borewell pump, SITC of Air Condition and Power backup system in the district of Uttar Dinajpur, West Bengal during the year 2025-26.
All as per BOQ
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Mosimpur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Development of Land, Construction of Boundary wall (length 144.00m), Approach Road (length 30.00m) and Construction of Pump House (5.40 Mtr. X 3.60 Mtr.) with water supply and sanitary arrangement at OHR site (1st Tube well Site) for HERIA PWSS
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 3rd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 2nd Tube Well site of Alipur Piped Water Supply Scheme under Malda Arsenic Area W/S Division, P.H.E.Dte. In the District of Malda.
Construction of 3.6mtr.X 3.0mtr Switch Room cum chlorine room with Water Supply and sanitary arragement at 3rd Tube Well site of Uttar Jadupur Piped Water Supply Scheme at English Bazar Block under Malda Arsenic Area W/S Division, P.H.E.Dte.
Construction of 3.60 mtr.X 3.00 mtr Switch Room cum chlorine room with Water Supply and sanitary arrangement in connection with source Augmentation of Adhna Piped Water Supply Scheme at Gazole Block of Malda District under Malda Division, PHE Dte.