Loading…
Loading…
11,296 results • Best match
Construction of 3 No 5000 Gln GSR, 2 No 10000 Gln GSR/Sump Tank 1 No 20000 Gln GSR, 1 No Pump Room and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Dabber Potha-A (JJM).
Custom Bid for Services - REPAIR AND OVERHAULING ROTARY PUMP EDC TYPE SRL NO 55912004 AND SIX 06 NOS INJECTOR MAKE STANDYNE OF MAHINDRA DUMPER TORRO BA No 16E 72859 of 56 RCC Similar Category Repair and Overhauling Service
Custom Bid for Services - REPAIR AND OVERHAULING ROTARY PUMP EDC TYPE MAKE BOSCH SRL NO 71801268 AND SIX NOS INJECTORS OF TATA TPR SAK 1212 BA NO 17E 73696X OF 109 RCC Similar Category Repair and Overhauling Service
Providing of Brush holder assembly along with carbon brushes for 1000 HP /750 KW HT slip ring Induction motors and rubber bearings for VT pump of 900 VM-2, 60 cusecs ,32.30 mtr Head installed at TPH Jammu
Providing, fitting of fuel injection pump of the Departmental Dumper Ashok Leyland U1618T JK01T-9109, fuel pressure regulator and its pressure sensor to the departmental truck JK01BC-1513 and general servicing and minor works to the departmental truc
Replacement of damaged components of 55,000 GPH x 30 mtrs. head pump unit no. 01 of Tawi low lift and replacement of components of 500 KVA voltage stabilizer and allied works of Tawi high lift pumping station respectively
General Overhauling of 04 cylinder air cooled Diesel engine Kirloskar make HA494 bearing engine no 04-2502/1000055 along with overhauling to Inline Fuel Injector Pump and injectors fitted to Tandem vibratory Roller deployed at Baduab Tulail Gurez.
Construction of 3 No 5000 Gln GSR, 2 No 10000 Gln GSR/Sump Tank 1 No 20000 Gln GSR, 1 No Pump Room and 720mtr Boundary Wall, Rising Main and Distribution system under WSS Dabber Potha-A (JJM).
REPAIR / MAINTENANCE / CLEANING OF PVC OVER HEAD TANK / FLOAT VALVE / GATE VALVE/ AIR PIPE/ OUTLET PIPE UP TO BUILDING WALL INCLUDING REPAIR TO PRESSURE PUMP ALONGWITH CERTAIN MISC E/M WORK AT 901 SU AIR FORCE STATION NATHATOP
Construction Testing and Commissioning of various Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall Chain Link Fencing along with allied works under 04 No. WSS under JJM
Construction Testing and Commissioning of various Dug well Pump room 5000 GPH Slow Sand Filtration Plant, 10000 Gallons Sump Tank and Boundary wall Chain Link Fencing along with allied works depending on safe bearing capacity in District Kathua
Construction Testing and Commissioning of various Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall Chain Link Fencing along with allied works under 03 No. WSS under JJM
Development of JDA housing colony at Udheywala Phase1 Phase11 by way of providing and laying of water supply providing under DC works 1 Providing and laying of rising main and Distribution system. 2 Construction of pump room building
Construction Testing and Commissioning of various Dug well Pump room Slow Sand Filtration Plant of Various Capacities Sump Tank of Various Capacities and Boundary wall Chain Link Fencing along with allied works under 02 No. WSS under JJM
Construction Development of 05 numbers of borewell and waterbank at Srinagar International Airport Srinagar. Sub Head A Civil works 1 Providing pump room and laying of G.I. pipes for connecting all individual bore wells to existing underground sump
Construction of 3 No 10000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR, 1 No 20000 Gln GSR, 2 No Pump Room and 540mtr Boundary Wall, Rising Main and Distribution system under WSS Lower Bhajwal-B (JJM).
Replacement of worn-out components of 110 ampere rating LT control panel installed at pumping station Ramnagar stage 1st and replacement of GPH x 350 meter head HC pump with allied works at pumping station Thaley stage 2nd
Construction of 3 No 20000 Gln GSR, Construction of 2 No 10000 Gln GSR, 01 No. Pump Room , 02 No. Spring cover , 01 No. Compound wall Laying and Fitting Rising Main and Distribution system under WSS Lah (JJM).
Construction of 1 No 20000 Gln GSR ,Construction of 1 No 10000 Gln GSR, ,1 Nos Pump Room, 01 No. compund wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Dhanwan (JJM).
Construction of 5 No 10000 Gln GSR, ,Construction of 8 No 5000 Gln GSR ,1 No Pump Room, 08 Nos. Spring cover, 01 No. fencing Laying and Fitting Rising Main and Distribution system under WSS Draj-A (JJM).
Construction of 6 No 10000 Gln GSR/Sump Tank, 2 No Pump Room, 05 Nos spring covers, 01 No. fencing and sign board, Laying and Fitting of Rising Main and Distribution system under WSS Swari Kote-A (JJM).
Construction of 1 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 10000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Middle Kangri (JJM).
Construction of 3 No 10000 Gln GSR/Sump Tank, 1 No 5000 Gln GSR, 1 No 20000 Gln GSR, 2 No Pump Room and 420mtr Boundary Wall, Rising Main and Distribution system under WSS Lower Bhajwal-B (JJM).
Construction of 1 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 10000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Upper Kangri (JJM).
Construction of 1 No 5000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 20000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Hanjana Khanka (JJM).
Construction of 2 No 10,000 Gln GSR/Sump Tank, 1 No 15,000 Gln GSR/Sump Tank, 1 No pump room, 180 mtr boundary wall, Laying and Fitting Rising Main and Distribution system under WSS Dukhari Pota Galla (JJM).
Construction of 2 No 20000 Gln GSR, Construction of 1 No 10000 Gln GSR ,1 Nos Pump Room, 01 No. compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution system under WSS Sasalkote (JJM).
Providing, installation, testing and commissioning of self-priming type, horizontal shaft disposition pump upto 20LPS capacity coupled to single phase AC induction motor on a common base frame along with other allied accessories at Lane No-2 Gousiya
Construction of 4 No 20000 Gln GSR ,Construction of 1 No 10000 Gln GSR, 1 Nos Pump Room, 01 No. protection work, 01 No. compound wall Laying and Fitting Rising Main and Distribution system under WSS Kallar (JJM).
Construction of 1 No 10000 Gln Per Hour Capacity Rapid Sand Filteration Plant, 1 No Intake well, 1 No Pump Room, 1 No 20000 Glns Sump Tank, 180mtr Boundary Wall and Crate work under WSS Hanjana Thakran (JJM).
Construction Testing and Commissioning of 5000 GPH Slow Sand Filtration Plant depending on safe bearing capacity Pump room, 10000 Gallons Sump Tank and Boundary wall Chain Link Fencing along with other allied works in District Kathua UNDER JJM
Water Pipe 1 2 inch Black, Syntex 300 ltr, Plastic Barrel 200 Ltr, Syntex 2000 ltr, Water Pump Piston Ring, Pressure Ring, Air Valve, Rope Assembly, Water Pump Belt No 30, Water Pump Belt No 32, Water Pump Belt No 36, Pressure Washer, Sparking Plug 3 HP-Honda
Door Mechanism, Spring Assembly Rear, Cylinder Head Gasket, Feed Pump, Cabin Lifting Pump, Hose Assembly, Starter Motor 12V, Bush King Pin
fuel Strainer, Air Compressor Kit, Clutch Master Cylinder, Tank Cooland, Fuel Pump, Clutch Disc, radiator Assembly, Pump assembly oil, Brake pad
Pump Assy, Nozzle, Air Filter, Oil Filter, Fuel Filter, Fuel Gauge, Push Rod Mounting, Pump Element, Head Gasket Tractor, Charging PCB
WOOD PANELLING 10FT, WHITE BOARD, SUPPLY PIPE 10MM, PIPE HALF INCH X 100MTR, GENERATOR PUMP, CHAINCUTTER FOR TEAKWOOD, BARREL PUMP CLASSIC
Overhauling of rotary pump, Overhauling and repair of rotary pump, Repair of engine head assy, Repair of turbocharger, Overhauling of FIP
Pressure Sensor, Temp Sensor, Oil Pump, Oil Filter, Oil Seal Crankshaft, Throttle Valve, Shaft Sealing Ring, Water Pump, Fuel Filter Cartridge
HEAD ROTTER, CAM PLATE, CRAS, GOV SHAFT, SUPPLY PUMP, SIDE JAIN, Tapa Bush, ROLLER, PISTON, Cam Bush, DRIVE SHAFT, Pump Labour
Drive Shaft, Disc, Timing Device Piston, Cam Plate, Distributor Head, Pressure Control Valve, Roller, Rotary Pump Packing Kit, Solenoid, Vane Pump
Distributor Head, Pump Housing, Vane Pump, TD Piston, Sealing Kit, Slotler Washer, Governor Shaft, Gasket, Roller Ring Assy, Pressure Control Valve
Cross Kit Assy, Joint Assy Universal, Bearing Inner, Bearing Rear Axle, Pump Assy Fuel, Motor Fuel Pump BOQ Title BOQ BOQ
Solenoid Operated Valve, Injector Nozzle, Pump Housing, Distributor Head, Vane Pump, Tank Collant Vehicular, Clutch Master Cyl, Adjusting Pin, Friction Washer
Repairing of Gear Box Overhauling, Repairing of Vane Pump, Repairing of Alternator, Repairing of Self Starter, Repairing of Cabin Lifting Pump
Rubber Coupling, Piston Ring, Oil Pump Assy, Head Gasket, Connecting Rod, Fuel Filter, Oil Pressure Pipe, AVR Assy, Fuel Feed Pump
Air dryer, Dual brake valve, Brake booster assy, Power steering pump assy, Cable 4x4 assy cable camp, Air dryer with unloader valve, Spider bearing, Assy oil pump, Mounting engine pad, IAC motor, Fuel pump Assy
Clutch Cyl Assy, Steering Vane Pump, Combination Switch, Cross Kit, Vane Pump Strg, Clutch Master Cyl Assy, Sleeve Cyl, Water Pump, Self Starter Assy, Pneumatic Valve, Alternator Assy, Disc Clutch, Suspension Bush Kit, CR Bearing
Construction of 01 No. RCC Ground Service Reservoir 5000 Gallon Capacity, 33 Nos. Anchor/Thrust Block, 01 No. Pump Rooms, Providing Laying and fitting of G.I. Pipes of Water Supply Scheme Kander Dev Sethen at Village Draman under MPLAD.
Construction of 3 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, Construction of 3 Nos Pump Room, 2 Nos Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Mangota Chaprian (JJM).
Construction of 5 No 10,000 Gln GSR/Sump Tank, 2 No 5000 Gln GSR, 1 No 20000 Gln GSR/Sump Tank, 1 No Pump Room and 180mtr Boundary Wall, Rising Main and Distribution system under WSS Rajpur Bhatta (JJM).