Loading…
Loading…
5,328 results • Best match
Rewinding of 150 HP S1 Duty Raw Water Pump Motor and Replacement of Burnt Bearings of 690 kW Motor No.1 (Stand by) including Dismantling, Re-Assembly, Testing and Commissioning at Moka LLC Canal under Ballari City Corporation.
Providing and Errection of New Pump motor and Connecting of Pipeline Ward no.11 Government School, ward no.08 Bescom, ward no.16 Nithyananda School,ward no.20 Punith House and Ward no.07 in Jigani TMC limits.
Supplying water supply materials pump,motor, GI Pipes cable and other items for installing existing borewell near basavana gudi at 2/4th ward near katgi ravi house at 10th ward near community toilet at 16th ward Mariyammanahalli town.
Drilling of bore well at ward no 02 huliyappa layout, ragimil road ,ward no 1 honenahalli road, ward no 3 housing board and ward no 06 bhimsandra, installation of motor pump and pipeline under Tumakuru city corporation limits.
Transformer Oil Pump Motor for 3 PHASE MEMU/EMU Model 1530 Size: 80 X 80 , Discharge : 700 LPM , Head 10 . 8 Mtrs. 3 HP , 2.2 KW , 400 V , 50 Hz, 3 Phase , Insulation Class - H , RPM - 2850 Mak
Canned Motor Pump model BA32-125/2.2H/SC/02,2.2Kw,15 cu.meter/Hr.at 20M as per M/s.Flowwell Drg.No.-CMP-11501/M of M/s.Flowwell or in ABB/KEC Makes Suitable for M/s. Medha make IGBT Converter. FIRMS
Transformer Oil Pump Motor for 3 PHASE MEMU/EMU- Model 1530 Size: 80 X 80, Discharge: 700 LPM, Head,10.8 Mtrs, 3 HP, 2.2 KW, 400V, 50 Hz, 3 Phase, Insulation Class-H, RPM-2850 Make: FLOWWELL/ FLOWOIL/
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bengaluru Dt. 07.10.2023 In O&m Sub Division, Rsd Gadag Of O&m Division, Hescom, Gadag On Ttk & Lump Sum Basis.
Creation of electrical infrastructure by extending 11kV HT lines, erection of 25KVA, 1-Star Rated Distribution Transformers, enhancement of 25KVA by 63 KVA Transformer and extension of 3 phase 4 wire LT line for energisation of Irrigation Pump Sets below 500 mtrs from existing electrical network registered before Dt 22.09.2023 and Rs. 10,000/- Infrastructure charges collected as per Order of GoK Energy Department, Energy/VSC/241/2023 Bengaluru Dt. 07.10.2023 in O&M Sub Division, Rannebennur-1 of O&M Division, HESCOM, Rannebennur on TTK & Lump Sum Basis.
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bengaluru Dt. 07.10.2023 In O&m Sub Division, Talikoti Of O&m Division, Hescom, Basavan Bagewadi On Ttk & Lump Sum Basis.
Creation of electrical infrastructure by extending 11kV HT lines, erection of 25KVA, 1-Star Rated Distribution Transformers, enhancement of 25KVA by 63 KVA Transformer and extension of 3 phase 4 wire LT line for energisation of Irrigation Pump Sets below 500 mtrs from existing electrical network registered before Dt 22.09.2023 and Rs. 10,000/- Infrastructure charges collected as per Order of GoK Energy Department, Energy/VSC/241/2023 Bengaluru Dt. 07.10.2023 in O&M Sub Division, Rannebennur-2 of O&M Division, HESCOM, Rannebennur on TTK & Lump Sum Basis.
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bengaluru Dt. 07.10.2023 In O&m Sub Division, Rsd-vijayapur Of O&m Division, Hescom, Vijaypaur On Ttk & Lump Sum Basis.
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bengaluru Dt. 07.10.2023 In O&m Sub Division, Kundagol Of O&m Rural Division, Hescom, Hubballi On Ttk & Lump Sum Basis.
Creation Of Electrical Infrastructure By Extending 11kv Ht Lines, Erection Of 25kva, 1-star Rated Distribution Transformers, Enhancement Of 25kva By 63 Kva Transformer And Extension Of 3 Phase 4 Wire Lt Line For Energisation Of Irrigation Pump Sets Below 500 Mtrs From Existing Electrical Network Registered Before Dt 22.09.2023 And Rs. 10,000/- Infrastructure Charges Collected As Per Order Of Gok Energy Department, Energy/vsc/241/2023 Bengaluru Dt. 07.10.2023 In O&m Sub Division, Kalaghatgi Of O&m Rural Division, Hescom, Dharwad On Ttk & Lump Sum Basis.
Drilling of BW installation of pumping machinery and laying of pileine and Gescom in Karbari Tanda and laying of pipleine in SC ward in Bandempalli village in Sedam Taluka under KKRDB
Construction of A Type School Building and 9 Numbers Staff Quarters (4 Numbers Type II, 4 Numbers Type III and 1 Numbers Type V Quarters) including Internal water supply, Sanitary Installations, IEI works, Water supply pump sets, LT distribution, ... sewage pump set etc
TRANSFORMER OIL PUMP SET COMPLETE WITH MOTOR(MPH) RATING 4.3 HP(3.2KW), 2 POLE FOR OPERATION VOLTAGE 415 +- 22.5% VAC,50 HZ, INSULATION 'H' CLASS, FULL LOAD RPM 2850, CONFIRMING TO CLW SPECN NO.CLW/ES
1. Spare List for 5.5 HP Power Pack Pump set with Petrol Engine. Generally as per Drawing attached with Part No. PEP5500010 (01 Set) 2. Spare List for control console/control table Model No. : PCD49
Drilling of new Borewells and installation of submersible motor , syntax and pipeline in ward no 08 09 10 11 12 of Maski town limit
Supply for Vacuum Pumps Spares
PROCUREMENT OF JOCKEY PUMPS 100kl/Hr @ 110m Head FOR BPCL PALAKKAD, Fire Fighting Pump 682 Kl/Hr @ 105m Head
Supplying and Fixing Submertsible pumpset to existing borewells in Town Panchayat Chinchali Limit
Drilling of Borewell and Installment of pumpset and pipeline at Jodakurali road chikkodi
Supply Of Pumpset Pipe Cable etc tmc all Old Borwells Under TMC Limit
REPAIR MAINT OF FIRE PUMP OF CAPACITY 2x200 KW ALONG WITH JOCKEY PUMPS AND CONNECTED ACCESSORIES AT NSRY, NAVAL BASE KARWAR UNDER GE (SB) KARWAR
REPAIR/MAINT OF FIRE PUMP OF CAPACITY 2X200 KW ALONG WITH JOCKEY PUMPS AND CONNECTED ACCESSORIES AT NSRY, NAVAL BASE KARWAR UNDER GE (SB) KARWAR.
Estimate for 250 HP VT pumps Newly Made Material supply Machini Fitting work of VT Pump water supply jackwell ShahabaD Bhima AND Kagin River Shahabad
SPECIAL REPAIRS AND REPLACEMENT OF EXTERNAL WATER SUPPLY DISTRIBUTION SYSTEM AT RMS BELGAUM, HARDING LINES OF JL WING, PROVISION OF BOREWELL WITH SUBMERSIBLE PUMP AT CDO WING AREA OF HQ JL WING AND PROVISION OF CERTAIN OTHER WORKS UNDER GE BELGAUM
Drilling of New Borewell and Providing and fixing of 2HP Submersible Pump Cistern and pipeline Near Chandrakant house in Yallaling colony at Ward No 04 and Near Rangappa So Hanumayya house in Majgerdoddi at Ward No 20 in Devadurga Town
REPAIRS/REWINDING OF PUMPSETS, BOREWELLS STAR/DELTA, MCCBs, POWER CONTACTOR ALONGWITH CONNECTED ITEMS AT AFS BIDAR
Providing 2 Nos Borewell Pumpsets including pipes, accessories and control panel at GSI, Kumaraswamy Layout, Bangalore.
Repair of 2 burnt spare transformer Intermediate booster station , Repair and maintenance of water supply tanker 1500 litre 3 no, 2000 litre 1 no, Replacing of burnt main cable at Intermediate booster station and supply and installation of spare FCMA ... HP centrifugal pump of ...
SPECIAL REPAIRS/ REPLACEMENT AND RE-ROUTING OF RUSTED VINTAGE CI/GI PIPES, SLUICE VALVES, GATE VALVES INCLUDING CONNECTED FITTINGS/FIXTURES FROM PUMP HOUSE TO GOLDEN JUBILEE COMPLEX AT CHAF BANGALORE
Custom Bid for Services - MANNING AND OPERATION OF DRINKING WATER SUPPLY INSTALLATION AND DG SET AT AMDALLI TOWNSHIP INCLUDING MANNING AND OPERATION OF FIRE PUMP HOUSE SANKRUBAGH UNDER GESB KARWAR
Construction of a sump, pump house, rising main and other development works to supply water to the existing upper water reservoir in the 05th Ward Teachers Colony of the town
Provide and Installation of CCTV Cameras to prevent illegal activities of Melapura Pump house and Rammanahalli Water Treatment Plant Unit at Melapura Water Supply Scheme in the limits of MCC
chetak Centrifugal Monoblock Pumps with Motor Rating - 1, chetak Centrifugal Monoblock Pumps with Motor Rating - 1 horsepower
SKOPE Centrifugal Monoblock Pumps with Motor Rating - 1, SKOPE Centrifugal Monoblock Pumps with Motor Rating - 1 horsepower
REPAIR MAINT OF CI DI GI PIPE LINES BOREWELL UG SUMP CLEANING PUMP MOTOR AND OTHER CONNECTED WORKS AT ASC CENTRE COLLAGE EME WKS MAP ACCN NORTH ASC CENTRE NORTH AND 100 MAP DOMLUR AREA UNDER GE CENTRAL BANGLORE
Drilling of borewell and installation of motor pump in the area identified by Geologist in ward no.2 savitha samaja galli and pipe line installation work at near pada gudi via maharani college to agalu area in Chitradurga City
Drilling of borewell and installation of motor pump in the area identified by Geologist in ward no.2 kabeerananda swamy matta back side and pipe line installation work at back side of church and beside areas in Chitradurga City
1Drilling of Borewell for Drinking water at Vidyanagara in ward No 01 of Gubbi Town Panchayath Limits. 2. Installation of Pump motor Casing pipe to Newly drilled borewell at Vidyanagara in ward No 01 of Gubbi Town Panchayath Limits
Purchasing and fixing 10HP 20 stage and 25HP 30 stage pump motor starter and 3cx6sqmm cable for borewell of Doddanagamangala Gundu Thopu Munireddy Layout 1st cross and behind Pillamma house of Sridar Reddy layout in Konappana Agrahara TMC Limit
Package 09 MLK Providing Pipe Line and Pump Motor at GOWRASAMUDRA Village Ashokasiddapura GP, Providing Pipe Line at RAMASAGARA Village Ashokasiddapura GP, CONSTRUCTION OF ELSR OF 50 KL CAPACITY AT 7.5 M STAGING at RAYAPURA MOLAKALMURU Taluk Chitradurga District
Supply and fixing of Motor, pump, starter, Pipe, Cable, 2 inch GI Pipe, Providing electrification and construction of drinking water tank for animals outside of the burial ground at Ward No 12 in T Narasipura TMC Limit (Continuation work)
TRANSFORMER OIL PUMP MOTOR (MPH), KW- 3.2 H.P.- 4.3, VOLTAGE- 415 VOLT, 3 PHASE,RPM- 2850, 50 HZ, HEAD- 11 METER, D/S- 1190 LPM, INSULATION- 'H' CLASS, DRG.NO. CLW/ES/01/L as per Drg.No. DRG.NO. CLW/E
TRANSFORMER OIL PUMP MOTOR (MPH), KW- 3.2 H.P.- 4.3, VOLTAGE- 415 VOLT, 3 PHASE,RPM- 2850, 50 HZ, HEAD- 11 METER, D/S- 1190 LPM, INSULATION- 'H' CLASS, DRG.NO. CLW/ES/01/L as per Drg.No. DRG.NO. CLW/E
Set of gasket and O-ring for flowwell make transformer oil pump motor (MPH) model no.- 1143T consisting of 3 items: (1) O-ring size- ID 195mmx5mm dia -01 no/set,(2) O-ring size ID- 38mmx3mm dia - 01no
TRANSFORMER OIL PUMP MOTOR (MPH), KW- 3.2 H.P.- 4.3, VOLTAGE- 415 VOLT, 3 PHASE,RPM- 2850, 50 HZ, HEAD- 11 METER, D/S- 1190 LPM, INSULATION- 'H' CLASS, DRG.NO. CLW/ES/01/L as per Drg.No. DRG.NO. CLW/E
TRANSFORMER OIL PUMP MOTOR (MPH), KW- 3.2 H.P.- 4.3, VOLTAGE- 415 VOLT, 3 PHASE,RPM- 2850, 50 HZ, HEAD- 11 METER, D/S- 1190 LPM, INSULATION- 'H' CLASS, DRG.NO. CLW/ES/01/L as per Drg.No. DRG.NO. CLW/E