Loading…
Loading…
1,010 results • Best match
Creation of 250 KVA Substation along with HT/LT Line for PHE installation
Supply, Installation, Testing and Commissioning of 63KVA Sub Station along with 11KV HT Line and Tapping Point at Village Mearth Kathua under the jurisdiction of Executive Engineer(Distribution), JPDCL, Electric Division, Kathua
Supply erection testing and commissioning of 1x63 KVA Distribution Sub Station along with Laying of HT Line on turnkey basis each for PHE in ED VIJAYPUR
Creation of 2X25 KVA S/Stn. alongwith HT/LT line at Plastic Waste Management Unit Jhullas Lower Block Poonch and Buffliaz Block
Creation of 2X250 KVA and 4X100 KVA S/Stn. along with HT/LT line at WSS Qasba Bandichechian under JJM-2023-24
Extension of LT Line to Borewell and Prodigy Energy Meter etc for KVK Ganderbal at FVSc and AH Shuhama SKUAST-Kashmir(HADP)
Supply, Erection, Testing and Commissioning for laying of LT Line of 2 phase 3 wire at Bakerwal House village Janakha Dansal Jammu
Extension of LT Line Alongwith Internal Electrification Work, Servo Stabilizer etc for Chilly Plant Under (HADP/CAPEX) at KVK Haran, SKUAST-K.
Repair/Maint of underground electric cable, LT line, LT panel and connected work at Krimchi and JNE area under GE(Utilities) Udhampur.
ERECTION OF 11 KV HT LINE FOR PROVIDING POWER SUPPLY TO BSNL EXCHANGE THANAMANMDI UNDER DC WORKS IN THE JURISDICATION OF ELECTRIC DIVISION RAJOURI.
Diversion of HT line near H/o Ab Qayoom War to Shahid Shabir Panchayat Halqa M Chogal 1st Block Handwara under PRI grants of District Capex Budget 2023-24
Custom Bid for Services - Deployment of Support Manpower at RDSS-Kashmir Site Offices Similar Category Manpower Outsourcing Services - Minimum wage
Creation of 25KVA,11/0.4KV Sub Station alongwith LT Line of AB Cable for PNB Branch Phinter under Deposit Contribution for the year 2022-23 on Turnkey Basis.
Supply Installation Testing Commissioning of new 11KV line from proposed Receiving Station at Ware House Jammu for Bifurcation of 11KV PP-1 feeder on turnkey basis Under Languishing Projects
Creation of 100 KVA Sub station 63 KVA Sub station alongwith Erection of 11 KV Line on 9 mtr. ST poles, LT 3 phase 4 wire line on 8 mtr. ST poles 30mm ACSR Conductor at WSS Malhar
Construction of 33kV line on 11Mtr long ST poles with 0.1 ACSR conductor for 1x1600kVA Sub Station with 1 standby 1x1600kVA at MES Hyder Beigh Garrison Pattan Baramulla under Deposit Contribution
FINDC2526117618 Shifting of 11kv line from the residential area of shartigam and Laribal along the road side Block Rajwar under CDF grants in the Juridiction of ED Handwara
Creation of 1 no. 25kva substation along with HT, LT line at Goldi Sattani
Supply Installation, Testing, Commissioning of 100KVA, 11/0.415KV distribution substation along with HT/LT line at Village Pachel under Scheme PMAGY 2022-23
Rate Contract for Supply, Erection/Creation, Testing and Commissioning 250 KVA transformer substation along with Laying of HTand LT Line on turnkey basis
Supply, Installation, Testing and Commissioning for laying of LT line at New Treasury Office Dharmari under the jurisdiction of Electric Division JPDCL Reasi
Erection of HT line for 63 KV substation at jai valley under the jurisdiction of JPDCL ED Doda under PRI Grant ON FULL TURNKEY BASIS
Creation of 200 KVA substation alongwith HT line for providing power supply to M/s Indian Oil Corporation Limited at Lasjan outlet for E-charging
1. Installation of transformer at Ward no 06 and 10 at Kharian . 2. Improvement of HT line at new colony bonzanigam upto Mohd Shafi Malla.
CREATION OF SUB STATION (25/63 KVA) ALONG WITH HT/LT LINE ON TURNKEY BASIS UNDER PRI WORK 2024-2025 WITHIN THE JURISDICTION ELECTRIC DIVISION VIJAYPUR, JPDCL JAMMu
Diversion of under construction of 33KV D H Pora Nagam line via Mountain Terrian form D.H pora Police station to Nandimarg, including shifting of existing 11KV DK Marg feeder on 33KV line
Creation of 63 KVA Transformer alongwith HT/LT Line regarding Grievance Lodged by Smt. Neetu R/o Sunjwan, Marheen falling under the jurisdiction of Electric Division Kathua on Turnkey Basis
Supply, Erection, Creation, Testing and Commissioning of 63 KVA transformer substation along with laying of HT and LT line under the jurisdiction of Executive Engineer Electric Division Vijaypur, JPDCL, Jammu
Erection of 11KV Line (Double Circuit ) for providing Power Supply to transit accommodation camps for Kashmiri Migrants under Honble Prime Minister Package at Lethpora (1)-Phase-1 Previously Barsoo
ERECTION OF 11 KV LINE ON STP 11 MTR AND STP 9MTR FOR PROVIDING OF DEDICATED 11 KV LINE TO SDH HOSPITAL KELLER AND BHQ UNDER ABDP KELLER
Laying of LT line at Grass Land and Foddar Development Farm Matlote Narloo Dharmari on turnkey basis in jurisdiction of Electric Division JPDCL Reasi
Creation of 25 KVA Distribution Sub Station along with HT and LT line at Bhowni Pyt. Cherota B in Thandapani feeder under Tribal Grant
Creation of 2x25kva at Kotwal Mohalla Doki, Kumar Mohalla Gosti, Augmentation 25 to 63kva at Jagota and Shifting of HT line at Nai Bhalara under PRI
Supply Erection Testing and Commissioning for Laying of 2Kms HT Line under WSS at New intake/Filtration plant Kattal Battal LUP No 2360 On Turnkey basis
Installation /Laying of HT relocation of HT line from congested area to (Raod at Donipawa from Checkpost to Ziyarat Sharief Anantnag). Under CDF Scheme-44-Anantnag
REPAIR AND MAINT OF EXTERNAL HT LINE ICLUDING MAINT OF TRANSFORMER, GOD SWITCHES AND CONNECTED WORKS AT 156 INF BN TA UNDER AGE (I) CIF (R)
Supply, Erection, Testing and Commissioning of Laying of HT XLPE Cable 185 mm sq 3 Core from the Receiving station Company Bagh alongwith Erection of 2 Nos 11 KV Isolation Point on CB03 Feeder, Shifting of 11 KV line from the Receiving station Com
Relocation of 33kV Isolator set from main Gate at FVSC and AH Shuhama and Relocation of 33kV and 11 KV line village feeders of JKPDCL in view of new Gate Widening from main road to CRPF bunker at FVSC and AH Shuhama SKUAST Kashmir
Laying of 0.35km 11 KV Line on 11 mtr ST Poles using Rabbit required for evacuation of power from newly created 1x10MVA R/station NaiBasti and insertion of 9mtr ST poles under UT Capex budget for the 2025-26 on Turnkey basis. SchCode PDDSS2526100416
Creation of 2X250 KVA . 2X63 KVA Sub stations alongwith erection of 11 KV Line on 9 mtr. ST poles, 30mm Sq ACSR Rabbit conductor . LT line on 8 mtr. ST pole at WSS Laddan Kalid Sulghar under JJM
LT Line and Extensions at various locations in Electric Division JPDCL Udhampur under UT Capex 2025-26 on turnkey basis
SITC works for Improvement of HT/LT Network for ED Sumbal by way of Shifting of 11KV Line from Gulab Sheikh Mohalla to PHE Chewa under UT Capex 2025-26
Supply, Installation, Testing and Commissioning for Errection of New Poles along with conductor against Old poles for 3Km of 11kV line from Receiving Station Surfraw to Ganiwon Cluster Village HariGaniwon.
SITC of 1250 KVA Distribution Substation HT AVR alongwith 11KV line on 9 Mtr PCC Poles with 120mm sq ABCable alongwith Isolation point for Musical Water Fountain at Baghe Bahu
LAYING OF LT LINE WITH AB CABLE (1-PHASE) IN DIFFERENT LOCATIONS OF SUB DIVISION BARI BRAHMANA ON TURNKEY BASIS UNDER THE JURISDICTION OF EXECUTIVE ENGINEER, ELECTRIC DIVISION VIJAYPUR, JPDCL, JAMMU
Supply Erection Testing and Commissioning of 2 nos 25 KVA Sub Stations along with laying of HT line at WSS Seri Kalan under NABARD on Turnkey basis
Renovation/stabilization of HT line Feeding to DDK and Installation of damaged 11KV Link Set and Drop Out fuse set (Heavy duty) to dedicated 400KVA Distribution transformer
Supply Erection Testing and Commissioning for shifting of HT Line Passing over Eye Operation Theatre at District Hospital Ramban under the jurisdiction of Electric Division JPDCL Batote
Supply Erection Testing and Commissioning of 250 KVA Sub Station along with laying of HT line under WSS at Dugwell Site Jhajjar Nallah (chaddali) on turnkey basis
Supply, Erection, Testing , Commissioning for Creation of 250 KVA Sub-Station, laying of HT Line, Laying of 11 KV Tapping Point under JJM WSS Dhammi, Jhajjar Kotli