Loading…
Loading…
788 results • Best match
1.Construction of 11kV line using ACSR RACCOON using A pole- 0.1 km 2.Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 4.5 km
Supply, Installation,Testing and Commissioning of 5.31km 11kV line (Circuit length) with covered conductor on existing poles by replacing existing 11kV OH conductors under ED TSR (W)
Erecting Ht A pole, HTpole, HT DP ,Dismantling damagd HT pole, RCC pole, HT PSC wo damage,A pole wo dmge,11 kV line, AB switch,Dismantling transformer station,Providing Ht stay,Stringing 11kV lines,Erection of 100 kVA transformer, Fitting AB switch
HT/LT line works including UG cable laying related to construction of Karikkathara bridge (RW-4630-202223-98) under Electrical Section Kumarakom
Reconductoring with LT ABC, Insertion of LT poles, Dismantling existing Lt line, erecting suspension clam and Tension clamp, connection piercing connectors, etc.
This estimate is proposed for strengthening existing LT line using A pole by dismantling existing LT PSC pole for drawing HT ABC
Construction of 11 KV single circuit OH line
Constructing 1.600Km 11KV line after erecting PSC poles,A type pole,Making Pole DP,fitting and erecting AB switches ,Dismantling LT poles.,Pole muffing,reshackling Lt lines Etc.
1.Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured -1.5 KM 2.Providing HT LINE AB SWITCH including erection of structure - 2
Providing temporary alternate 66KV supply to Kattanam Substation- Stringing 260Mtr 11kV line using covered conductor for interconnecting the UG and OH portion of 11kV Thodiyoor feeder at Chakkuvally Junction
Development of Infrastructure Works -Erection of DTR, HTABC, HT UG Cable, Replacement of DTR, APFC- at TCED, Thrissur, Kerala, State, Under RDSS
SHIFTING OF POLES FOR ROAD WIDENING
Stringing of 11 kV Aerial bunched cable existing poles 2000mts Fitting and erecting one HT DP using A type pole 3 Nos Insertion and Renewal of existing damaged,old 11kV PSC
Constructing 4.5Km 11KV HT LINE AND LAYING 150MTR UG CABLE FOR AN INDEPENDENT FEEDER FROM KARUVATTA SUBSTATION TO THAMALLACKAL ALONG NH under Ele.section, HARIPAD - Work code 552434112000113
Development of Distribution Infrastructure at Malappuram District of Kerala under the Revamped Reforms-based and Results-linked, Distribution Sector Scheme for Reconductoring of 11 kV OH Line using Covered Conductor under Electrical Circle Manjeri
1. Construction of 11 KV Line using PSC/A Pole - 3.1 KM 2. Fitting and erecting PSC Pole - 60 Nos 3. Fitting HT DP using PSC Pole - 5 Nos 4. Installation of AB Switches on DP Structure - 2 Nos 5. Apole erection 33 Nos 6. Erection of DTR 1No
Constructing 11KV line on PSC pole 1.4 KM,Erecting 1x100KVA DTR,Makind DP,Providing AB switches,Constructing LT lines 3 Phase and single phase,concrete muffing,Fencing ,yard metaling,DTR box etc.
1. CONSTRUCTION 11 KV LINE USING PSC POLE- 5 KM 2. FITTING AND ERECTING A TYPE POLE- 11 NOS 3. FITTING AND ERECTING HT DP USING PASC POLE- 4 NOS. 4. FITTING AND ERECTING HT DP USING A TYPE POLE- 4 NOS. 5. FITTING AND ERECTING HT PSC POLE-151 NOS
Construction of new HT line using 120sqmm HT ABC, transformer DPs, dismantling LT lines and stringing LT lines for installation of new transformers under various locations of Electrical Section Kodakara
Cutting the trees existing in the Right of way of the proposed 33kV line to the Kunnumpuram Substation. Trees have to be cut at the ground level, arranged into pieces and to stacked outside the Right of Way
20 nos of33kV Bus isolator with ss and 25 nos 33kV Line isolator with SS and ES 70nos 110kV1200A bus isolator withss,120nos 110kV800A Bus isolator withss and 56 nos 110kV 800A Line Isolator with SS and ES
Construction of new HT line using 99 sqmm Covered Conductor after the erection of 9m PSC Pole in position for HT interlinking bwtween Silent Nagar to Cheruval under Electrical Section Parappukkara
Pole insertion in HT and HT/LT line from Kinfra 4 pole to Rubber park for stringing 11 kV ABC and constructing internal power distribution system for Piravanthoor Rubberpark
Development of 33 kV Sub Transmission infrastructure at Ernakulam District of Kerala under the RDSS - Reconductoring works on 33kV Sub Transmission network using 33kV 120 sq.mm AAAC, XLPE Covered Conductor
Construction of new HT line using 120sqmm HT ABC, transformer DP, dismantling and transferring LT lines for Constructing Transformer DP structure at 5 locations and construction of HT ABC at Ambalaparambu under Electrical Section Mala
Development of 33 kV Sub Transmission infrastructure at Pathanamthitta District of Kerala under the RDSS - Re conductoring works on 33kV Sub Transmission network using 33kV 120 sq.mm AAAC, XLPE Covered Conductor
Supplying and Drawing of LT ABC at Electrical Section, Sakthikulangara under Electrical Sub Division, Sakthikulangara 5.6 Km of size 70 sq.mm Aerial Bunched Cable through the existing LT line on Turnkey basis at
1. Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 7.5 kilometer 2. Erecting DOUBLE POLE structure with AB SWITCH using A pole - 5 each 3.Construction of 11kV line using ACSR RACCOON using A pole -0.150 kilometer
Construction of new HT line using 120sqmm HT ABC, transformer DP, erecting transformer dismantling and transferring LT lines for Constructing HT ABC Line and Installing 100 KVA Transformer at MILMA Road Kuzhur under Electrical Section Kuzhur.
Development of 33 kV Sub Transmission infrastructure at Pathanamthitta District of Kerala under the RDSS Re conductoring works on 33kV Sub Transmission network using 33kV 120 sq mm AAAC XLPE Covered Conductor
Shifting of HT and LT line Transformers DP structures Excavation of pits for poles and stays fitting and erecting of poles stringing ACSR conductors HT and LTmFitting of AB switches providing stays DPs and earthing
1.Construction of 11kV line using ACSR RACCOON using PSC pole- 1 NO 2. Erecting DOUBLE POLE structure with AB SWITCH using A pole-1 No. 3.Erection of 100 kVA DTR ON DP using A-POLE at line end-1 No.
Supplying and Drawing of LT ABC at Electrical Section, Thangaseery under Electrical Sub Division, Sakthikulangara 6.05 Km of size 70 sqmm Aerial Bunched Cable through the existing LT line on Turnkey basis at Manjavil, Cherukulam and Punathala
Stringing 9.4 Km 11 KV Aerial Bunched Cable, 3x120 sq. mm 1x95 sq. mm (Insulated messsenger) under the existing HT line from 220 KV Malaparamba substation to the compound of MILMA unit at Moorkanad , Changing Existing PSC poles, Erecting A pole
PACKAGE 2 RECONDUCTORING 40.75KM 11kV OH LINE using COVERED CONDUCTOR USING PSC POLES AT PALA ELECTRICAL CIRCLE UNDER KOTTAYAM DISTRICT OF KERALA UNDER REVAMPED REFORMS-BASED AND RESULTS LINKED DISTRIBUTION SECTOR SCHEME (RDSS) ON TURNKEY BASIS.
Drawing 600 mtrs HT ABC using HT pole from Tharatta to Nilami and installing 160KVA Transformer including reconductoring the existing old and aged LT line with LT ABC at Electrical Section Kachani CW-4691-202526-47 under Electrical Div
Dismantling of HT LT OH lines without damage, fitting and erection of HT PSC Atype poles, stringing of HT LT lines and erecting transformers.
Custom Bid for Services - Preventive Maintenance Yearly of 11KV HT Over Head Line of approx 700 M for one year Qty 1Set, Custom Bid for Services - Breakdown service Ensure serviceability of 11KV HT line on Emergency Breakdown for one year Qty 1 Set, Custom Bid for Services - Preventive maintenance of HT panels ie 11 KV HT indoor and outdoor breaker panels for one year Qty 1Set, Custom Bid for Services - Breakdown service Ensure serviceability of HT panels on Emergency Breakdown for one year Qty 1Set, Custom Bid for Services - Preventive Maintenance Yearly of LT APFC and Main Lighting panels for one year Qty 1Set, Custom Bid for Services - Breakdown service Ensure serviceability of substation on emergency breakdown for one year Qty 1Set, Custom Bid for Services - Preventive Maintenance Yearly twice of 110by440 KV 500KVA distribution transformer for one year Qty 2 Sets, Custom Bid for Services - Preventive Maintenance Yearly of Power Control Circuit and Power Distribution panels for one year Qty 1Set, Custom Bid for Services - Insulation resistance checks and reporting the condition of all the feeder cables from LT panel to the PCC panels Qty 17 Nos