Loading…
Loading…
788 results • Best match
Supply of LT line spacer under North Malabar Region of KSEBL
Shifting of of LT line, post as part of road widening
11KV OH LINE CONSTRUCTION FROM KIZHAKANPADAM TO BOUNDRY 4KM 19-20 (Under Electrical Section, Karimannoor.)
Shifting of HT/ LT lines and pole from Payyekandy to Vilangad road under KIIFB project under Electrical Section Parappupara in Electrical Sub Division Nadapuram
REROUTING OF MANJESWARAM 11KV LINE FROM ANGADIPADAV AB TO KALPANA AB (668434111900318)UNDER ELECTRICAL SECTION MANJESWARAM
Constructing 1.95kM 11kV line along Elivaly to Alamattam road for avoiding cross country under ES Kollappally
construction of 11 kv line-450 mtr, installing 100 KVA tr, construction of 3 phase line-160 mtr, conversion of single phase line to 3 phase-110 mtr
CONSTRUCTION OF 2.600 M HT LINE , ERECTION OF 100 KVA DTR AND ALLIED WORKS
1.Construction of 11kV line using ACSR RACCOON using PSC pole -1kM,2.Construction of 11kV line using ACSR RACCOON using A pole -0.5KM,3.Erection of 100 kVA DTR ON DP using A-POLE at line end-1 No.
VI work at Kuzhikandam under ES Vandanmedu Stringing 1.1 km 11KV line and erecting 100 KVA Transformer
Reconductoring LT OH 5 wire line with LT three phase ABC 10km Conversion of LT 2 wire OH line to 3 phase ABC 3.5km
1. Replacing / Insertion of HT PSC pole in HT line- 90 Nos. 2.Replacing / Insertion of A pole in HT line-9 Nos. 3. Muffing for A pole- 9 Nos. 4. Providing HT stay -99 Nos.
OUTSOURCING OF MAIN REC. STA INC PUMP HOUSE AND DG SET AT NAE , REP/MAINT OF CEILING FAN, EXH FAN, ELE SUPLY, SWITCH, TUBE LIGHT, GEYSER AND REP TO SPLIT AC AND REP TO BOUNDARY WALL LGT FTG ,STREET LIGHT, LT LINE, EARTHING, TRANS AND MISC REP AT NAE
RECONDUCTERING 2.5KM HT LINE FROM AYYAPPANTHODU TO VENGAD THERU USING ACSR RACCON UNDER ES VENGAD
Stringing of one km 11kV Double Circuit line with ACSR Raccoon and allied works
1.Construction of 11kV line using ACSR RACCOON using A pole -0.4 km 2.Construction of 11kV line using ACSR RACCOON using PSC pole -1.4 km 3.Erection of 100 kVA DTR ON DP using A-POLE at line end -2 No.
Stringing 700m 11kV line using 120 sqmm HT ABC and erecting 1No. DP structure for Transformer at Kazhuthakkal.
Stringing of 0.75 km 3 PH 11kV line with XLPE Insulated ACSR Raccoon, Installing TFR and allied works
Existing HT/LT line is to be shifted for widening of the said road
CONSTRUCTION OF 11KV OH LINE,LT LINE RECONDUCTORING, PROVIDING BUCKET CRADLING AND ALLIED WORKS
Constructing HT and LT line and installation of 100kVA Transformers at Andikottukadavu Kuttadan padam
Touching clearance under ES Thrikkakara
construction of 2km HT line from Ullayam to adamattom and install transformer at ullayam vazhoor section
CONSTRUCTION OF 11kV UG CABLE WORK AT TCED, THRISSUR, KERALA STATE, UNDER RDSS
ABC stringing for giving supply to Life Mission Flat at Venappara - 1.5km 11kV line construction under Electrical Section, Karimannoor.
CONSTRUCTING OF 2.4KM 11KV OH LINE, INSTALLING 1NO 100KVA TRANSFORMER, NEW 5NOS DP, INSTALLATION/RENEWAL OF 16NOS AB, RENEWAL/INSERTION OF 74NOS HT POLES AND ALLIED WORKS AT VARIOUS LOCATIONS under Electrical section, Vallikunnam.
1. Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 4 kilometer
Shifting of HT and LT line and Poles Transformers DP structure AB switches providing earth
shifting of HT LT lines and poles, Transformers from Puthiya puzhakara to Karanthad within 2m under deposit work. The work involves 11nos of A pole 11m for cut poles. Total line length HT LT 700m Shifting of line AB DP structure-1no. (Puthiyapuzhakar
1. CONSTRUCTING 11 KV LINE USING PSC POLE- 2.2 KM 2. FITTING AND ERECTING PSC POLE- 57 NOS 3. FITTING HT DP USING PSC POLE- 2 NOS 4. INSTALLING AB SWITCHES- 2 NOS
Construction of 11 kv -1300 mtr, installation of 100 kva tr
Constructing 1.4 Km 11KV line and installing of 100KVA Transformer in favour of M/S Megha Plantations, Manjapetty under ES, Nedumkandam
1.Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured - 1.6 km 2.Dismantling 11kV line complete -3.5 km
Development of Distribution Infrastructure on Turnkey Basis under Dyuthi Special Scheme for Supply and Installation of Transformers at various locations under Electrical Circle, Nilambur
Developing and standardising HT Line infrastructure for drawing 11kv ABC to provide dedicated 11kv feeder to KSE Ltd Irinjalakuda .
Constructing 11KV line on PSC/A poles by using ACSR Racoon conductor,providing Line AB switch,Stays,Pipe Earthing,Pole muffing Etc.
Stringing 11kv circuit with CC 5.4km and dismantling old line and other allied works
Stringing 3x120sqmm for ohase1x95sqmm for messanger11KV ABC Fitting and erecting 100KVA DTR,PSC pole erection earthing concrete muffing etc
Deposit work for shiftng HT/LT lines and transformer from Kuttoor to Muthoor road under ES Kallisserry
CONSTRUCTING 900MTR 11KV LINE FROM MURINGACHIRA TO WEST UPTO NEW DDUGJY LINE TO FORM RING MAIN under Ele. Section, MUTHUKULAM - Work code 574134112100129
Laying UG cable
Construction of 2.3 KM of 11KV single circuit line from Pandappilly to Parakkadavu
1. CONSTRUCTION OF 11 KV LINE USING PSC/A POLE- 3.4 KM 2.FITTING AND ERECTING HT PSC POLE-107 NOS. 3.ERECTION AND FITTING A POLE-4 NOS 5.FITTING HT DP USING PSC POLE- 7 NOS.
Constructing 1.77km HT OH line
1. CONSTRUCTION 11 KV LINE PSC POLE-4.3 KM 2. FITTING AND ERECTING A TYPE POLE- 52 NOS 3. FITTING AND ERECTING HT DP USING PSC POLE- 4 NOS 4. FITTINF AND ERECTING HT DP USING A TYPE POLE- 4 NOS
Construction/Reconductoring of HT and LT lines with ABC under Electrical Division, Moovattupuzha.
ERRECTING 160 KVA TRANSFORMER AFTER CONSTRUCTING 1.7 KM OF 11KV LINE, STRINGING 0.75 KM 3PHASE AND 2.15 KM SINGLE PHASE LINE AND ALL OTHER ACCOMPANYING WORK
Shifting of 100 kVA Madam Kavala Transformer to load center and constructing 1.5 km HT OH Line under ES Murikkassery.
Stringing of HT Line with Covered conductor 650mts Fitting and erecting one 100kVA Transformer 1 No Fitting and erecting HT Apole 26 Nos
1. FITTING AND ERECTING HT POLE USING PSC. 2. INSERTION HT PSC POLE.3. DISMANTLING HT PSC/RCC POLE.4. ERECTING DTR.5. ERECTING LINE AB SWITCHES.