HT LINE Reconductoring-800 MTR, Changing damaged HT poles using A pole- 28 Nos, Providing HT LINE AB SWITCH- 1 no
CONSTRUCTION OF 1.00 KM 11 KV LINE USING PSC/A POLE,ERECTION OF DTR, PROVIDING BUCKET CRADLING AND ALLIED WORKS
Design, manufacturing, supply , installation, testing and commissioning of 16 Km 11 kV UG cable
Constructing 1.3kM 11kV line from Thottamkavala Kizhathiri under ES RPM
Laying of U G Cable 11kV XLPE Al 3x300 sq.mm Armoured- 3.8 kilometer
Constructing 1kM 11kV OH from Mutholikadavu BankmDTR to Neyyoor and installing one 100kVA DTR at Neyyoor under ES Paika
Construction of 1.9 KM 11 kv line using PSC/A Pole, Erection of 100 KVA DTR and works including LT Works
SHIFTING OF 11KV LINE BETWEEN ALINCHUVADU AND POOLACHODU UNDER ES CHELAKKARA
constructing 2.5kms HT line on PSC pole at Parappattupady
Bay addition and Interlinking 33KV KALLETTUMKARA and PARAPPUKKARA SUBSTATION for N 1 Standard Erection of A Poles and Lattices dismantling and restringing of existing HT LT line and laying of UG Cable with HDD Drilling for Railway Crossing
combining WC4821-202425-6,7,8
spacer
SPACER
SPACER
SPACER
Stringing of Three kilometer of 1.1 kV Aerial bunched cable of size 70 sqmm with bare or insulated messenger through existing poles
Stringing of 6293 metre 1.1 kV Aerial bunched cable with bare/insulated messenger through existing poles
spacer
spacer
1. Construction of 11kV line using ACSR RACCOON using A pole -2.8KM
REROUTING FAROOCITY TO MUNIYARA PORTION OF 11kV LINE UNDER ELECTRICAL SECTION, KAMBILIKANDAM.
Constructing 11 kV OH Line with ABC 120 sq mm using PSC Poles- 947 mtrs and erection of 100 kVA transformer on 12 M A Pole DP 1 No
LAYING HT ABC CABLE, UG CABLE, HT LINE CONSTRUCTION ETC.,
HT LINE STANDARDISATION AT VARIOUS AREAS UNDER ELECTRICAL SECTION THIRUVALLUR
1.Construction of 11kV line using ACSR RACCOON using PSC pole-0.3KM 2.Erection of 100 kVA DTR -3No. 3.Construction of 11kV line using ACSR RACCOON using A pole-0.2KM
Shifting and reconstruction of HT and LT line network
Shifting HT and LT line along Mamala Piravom road
site survey, planning, design, engineering, assembly manufacturing, testing, supply, handling, storage, installation, testing, commissioning, in the Kozhikode District (Electrical Circle ,Vadakara, loss Reduction UG Cable
Reconductoring of LT lines using ABC under Kanavila DTR area
Construction of 11 kV OH Line with ACSR Raccoon using A Poles- 1 km and Erection of 100 kVA transformer on 11 M A Pole DP 1 No
reconductoring and standardisation of ht line from ullayam to konekadavu vazhoor
constructing 3.4km HT line from kanamala to kalaketty under ES erumely
1.Replacing / Insertion of HT PSC pole in HT line -117 Nos. 2.Replacing / Insertion of A pole in HT line- 13 Nos. , 3.Muffing for A pole - 13 Nos. , 4.Providing HT stay - 130 Nos. , 5.Providing HT LINE AB SWITCH ON existing structure-2 Nos.
1.Replacing / Insertion of HT PSC pole in HT line - 188 /Nos. 2.Replacing / Insertion of A pole in HT line- 14 Nos. 3.Muffing for A pole - 24 Nos. 4.Providing HT LINE AB SWITCH ON existing structure- 2 Nos. 5.Providing HT stay - 202 Nos.
1.Replacing / Insertion of A pole in HT line 14 Nos. 2.Providing HT stay- 173 Nos 3.Muffing for A pole 14 Nos. 4 Replacing / Insertion of HT PSC pole in HT line 159 Nos. 5.Providing HT LINE AB SWITCH ON existing structure- 3 Nos.
Stringing HT/LT line using ABC at Pokkanamttam Kooroppada Kottayam
HT/LT line shifting in connection with the road widening
Installing 100 KVA transformer at Ambukkada by drawing 11kv line Under Electrical Section, Chithirapuram
1. Renewal of old/damaged PSC/RCC pole with new A Pole- 40 Nos. 2. Renewal of Old/Damaged PSC/RCC Pole with new PSC Pole-25 Nos.3. Insertion of PSC Pole- 260 Nos.4. Installation of AB-5 Nos.5. HT DP-7 Nos.
Drawing 11KV OH LINE 2 KM from AMBALAKAVALA- CHAVARA Under Electrical Section, Alakode Thodupuzha
RE-ROUTING OF 11KV OH LINE KARIMKUNNAM PUTHENPALLY TO GANDHINAGAR NEDIYASALA 3.2 KM UNDER ELECTRICAL SECTION PURAPUZHA
Design, Manufacturing and Supply of materials, erection testing and commissioning of work Reconductoring of 153.2 km of LT ABC 3 x 70 sqmm1 x 50 sqmm 1 x 16 sqmm using PSC poles at Kollam Circle Kollam District of Kerala under RDSS on turnkey basis
1.Replacing / Insertion of HT PSC pole in HT line-166 Nos. 2.Replacing / Insertion of A pole in HT line- 14Nos. 3.Muffing for A pole-14 Nos. 4.Providing HT stay- 180 5.Providing HT LINE AB SWITCH ON existing structure-1 6. Shifting Pole- 1
1.Replacing or Insertion of A pole in HT line - 20 Nos. 2.Muffing for A pole- 20Nos. 3.Providing HT LINE AB SWITCH ON existing structure - 2 nos. 4.Replacing or Insertion of HT PSC pole in HT line -224 Nos. 5.Providing HT stay -244 Nos.
constructing 1.4km ht line and install one transformer at kallidampoika santhigiri pallikathode
Construction of 11kV line -1600 METER, Erection of 100 kVA DTR,Yard Fencing and Metalling
Construction of 11kV Line from 35th Mile Gate AB to Kankanipalam under Electrical Section, Peruvanthanam
Stringing of 1.4Km 3 PH 11kV line with XLPE Insulated ACSR Raccoon and allied works
HT / LT LINE SHIFTING WORK AT KULANGARATH - NAMBIATHANKUND -VALOOK - VILANGAD ROAD
DTR Shifting, AB Shifting HT and LT Line and Poles Shifting