Loading…
Loading…
24,004 results • Best match
Re-organisation of LT line by prov 1 phase LT line ext. and conversion of conductor into cablein vill chauki and Maseraru in Electrical section Tikker under ESD Lambloo. T.S- 75/2025-26. WBS No. 32100257-001-HMR-LT-341.
Schedule of Works / Rates and Technical Specifications for construction of 33 KV, 11 KV Line and dismantling work for shifting of existing line in the route of OLD NATIONAL HIGHWAY No.-2 at ASFABAD CHAURAHA
Quantum of works for construction of 11 KV line AND S/S on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-II, Magarwara under the EDD-II, Unnao
Quantum of works for construction of 11 KV line and S/s on HT/LT for releasing connection under the full deposit scheme in the area of E.D.S.D.-II, Safipur under EDD-IV, Bangarmau, Unnao.
Estimate for 11 KV Line Conductor Aug At Sagar abadi feeder Athaikheda S/S to indian oil petrol pump 5km sagar abadi Tapping to pura abad 5 km. under Bahadurpur D/c under Mungaoli Division
Line Shifting of 33/11 KV line at the site of Brigde construction on Nagod-Rahikwara-Surdaha Road, 7/6 km, Kamro Nala, and Nagod-Ucchehra road 2/6 km Magrela Nala, Satna, Dist- Satna.
WORK FOR INSTALLATION OF 01 NO. ADDITIONAL PTR WITH ASSOCIATED 11 KV LINE AT 33/11 KV SUB-STATION OLAMBA OF D/C KHATEGAON R IN OnM DIVISION KANNOD FEEDER ID 645179 UNDER SSTD SCHEME
Sifting of 11 KV Line and other electrical work against Pradhan Mantri Gram Sadak Yojna (Deposit scheme) Under Jurisdiction of EDD, CESS-III and IV, Ciss Gomti, Lesa, Lucknow (Package No. UP46114, UP4697, UP46112, UP46113)
For the Work of 11 KV Line Construction/Strengthing, Installation of New T/Fs and other associated works Head on Buisness Plan 2023-24 VARSHA RITU on Semi Turn Key Basis under EDC-1 Agra
Estimate for providing 14 No. 200 Kg. 9.00 Mtr. long Mid Span pole for 11 KV line at various locations under Amla (R) D/c under (O and M) Betul North Division in Betul Circle
Estimate for public experiment of installation of 1x100 KVA DTR , 11 KV Line At Village Hiwerkhedi (Ramsingh Aahake Ke Khet Ke Pass ) Under Khedi Dc in O and M Dn Betul (S) in Betul Circle
Work of shifting the line of 11 KV line form Nagar Palika Parishad Gate No. 1 to Gate No. 3 against full deposit scheme in the area of E.E., Electricity Urban Distribution Division-Tech, Muzaffarnagar
Quantum of works Construction of 11 KV Line AND S/S for releasing connection/other related works under the full deposit scheme under the area of EDSD-III AND EDSD-IV under EDD-IIst, Unnao
Estimate for interconnection of 11 KV Bodi to Gyaraspur DLF feeder At Village Bodi Under Betul R Dc in O and M Dn Betul South 11 KV Line 2 Km , 11 KV DP 02 No
Quantum of works for construction of 11 KV line AND S/s on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-I, Shuklaganj under the EDD-II, Unnao
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Quantum of works for construction of 11 KV line and S/S on HT/LT for releasing connection under the full deposit scheme in the area of EDSD-III, Banther under the EDD-II, Unnao
Estimate For Public Experiment Of Shifting Of 11 KV Line Near Ramnagar Feeder Near Hanuman Mandeer Jakir Husain Ward Garg Colony Betul Under Betul (T) Zone-1 Dc Under O and M Dn Betul (S)
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Construction of 11 KV Line and installation of 5 MVA Power Transformer for release of 1500 KW connection Regional Manager Prayag. Depot, Rajapur, Prayagraj on Semi turn key Basis Under Electricity Urban Distribution Division Mayohall.
VARIOUS ELECTRICAL WORK- UNDER BUSINESS PLAN 2024-25 IN EDD SALEMPUR DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT, INSTALLATION OF DISTRIBUTION TRANSFORMER, STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES, REPLACEMENT OF VCB , XLPE CABLE
VARIOUS ELECTRICAL WORK- UNDER BUSINESS PLAN 2024-25 IN EDD GAURIBAZAR DISTRIBUTION TRANSFORMER CAPACITY ENHANCEMENT, INSTALLATION OF DISTRIBUTION TRANSFORMER, STRENGTHENING OF 11 KV LINE, NEW AND REPAIRING OF LT LINES, REPLACEMENT OF VCB, XLPE CABL
Shifting of Gobindabari SK sermon-1 11 KV line to the road of Gobindabari SK Sermon-2 Road for providing drinking water facility at Shakan Shermon-2 village under Dasda R.D. Block under Dasda ESD.
Schedule of Works / Rates and Technical Specifications for construction of 33 KV, 11 KV Line and dismantling work for shifting of existing line in the route of OLD NATIONAL HIGHWAY No.-2 at ASFABAD CHAURAHA
Estt for Replacment of 23 Nos Broken/Damaged Poles, Estt for Replacment of 09 Nos 11 Kv line and 11 No. L.T. line Broken/Damaged Poles, under Ganj DC of O and M Division Ganjbasoda
Quantum of work for construction of 11 KV line S/s for releasing connection/other related works under deposit scheme in the area of EDSD-I, Shuklaganj and EDSD-III, Banthar of EDD-II, Unnao
Segregation of 11 KV Killora feeder Emanating from Receiving station Pinjora by way of construction of new 11 KV Line from Receiving /Stn Pinjora upto Village Gret Mohalla Killora UNDER WINTER PREPAREDNESS ON TURNKEY BASIS
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-II, Safipur under Electricity Distribution Division-IV, Bangarmau, Unnao.
EMPANELMENT OF CONTRACTORS TO AWARD A CONTRACT FOR 33 KV AND 11 KV LINE UNDERGROUND ONE PLUS ONE RAILWAY CROSSING NATIONAL STATE ROAD CROSSING NEW REPLACEMENT WORK UNDER DIFFERENT SCHEMES IN THE CITY CIRCLE JABALPUR
Supply, Erection & commissioning of 37 KMs of 11 KV Line with 50 sq.mm covered conductor along with supports and associated accessories in Forest area under STSDF of Asifabad, Mancherial & Nirmal Districts under 100% turnkey basis
Quantum of works for construction of 11 KV line S/S on HT/LT for releasing connection under deposit scheme in the area of EDSD-I, Ajgain under the area of EDD-V, Hasanganj, Unnao.
Estimate for Public Experiment of Installation 1x25 KVA DTR and 11 KV Line Shivprasad Sahu Ke Khet Ke Pass At Village Kodaroti Under Khedi Dc in O and M Dn Betul (S) in Betul Circle
33/11 KV line coming out from Power Substation- Saidpur under Power Distribution Section-IV, Sayana, Saidpur under Pradhan Mantri Gram Sadak Yojana-3 Work of shifting the line poles obstructing the widening of road.
Quantum of work for construction of 11 KV line AND S/s on HT/LT for releasing connection/other related works under deposit scheme in the area of E.D.S.D.-III, Banther of EDD-II Unnao
REPAIR / MAINTENANCE TO HT OVERHEAD DISTRIBUTION SYSTEM, 11 KV LINE OF E/M SERVICES, HT VCBS/GO/DO OF 11 KV AND CONNECTED WORKS IN ARMY AREA AT UDAIPUR MIL STN UNDER AGE (I) UDAIPUR
Quantum of works for construction of New 11 KV line and S/s for LT Releasing Connection under full deposit scheme in the area of E.D.S.D.-I, Ajgain under Electricity Distribution Division-V, Hasanganj, Unnao.
Construction of New 11 KV Line for giving to New Light and Fan Connection in Jhuggi Jhopri near DTC Depot, Waqueel Wala T/f, Sector-16 and A-53, Sector-16 Along the Nala Patri
The Work for construction of U/G 11 KV line for Bifurcation of 11 KV Ashapur Feeder emitting from 33/11 KV S/S Ledhupur in the area of UEDD-VI Ashapur Varanasi under EE, UECD-II, Varanasi in Grism Kalin Business Plan-2019-20 on Semi Turn-Key Basis.
Installation of solar High mass light (Activity ID-58461551
Five Nos Solar Street Light At Chharra sansad Nine(Activity ID-58468629)
Installation of Solar High mast street light Chharra VII sansad Ac-tivity code-(58491597)
Creation of Substation along with HT and LT Line
Creation of substation along with HT and LT line
Erection of HT/LT Line and 25 KVA Substation
Creation of substation along with HT and LT line
Construction of LT Line and converting LT veasel to LT ABC and other work in front of fire station under EDD-2 Azamgarh
Erection of HT and LT Line with Substation
SHIFTING OF HT AND LT LINE,POLES AND TRANSFORMERS AS PART OF ROAD WIDENING WORK
Shifting of 33KV Line at Village Kalyanpura affected by Submergence of Sitanagar Medium Irrigation Project District Damoh (M.P.) complete work with material and labour at work site as per G Schedule and direction of Engineer.in charge
Providing Three Phase LT Line to Homestay of Aditi Rao at Village Makhrol by augmentation of existing lines from existing 22/.4KV, 63kVA S/Stn Makhrol , Shifting of existing lines, prov. Three Phase LT line to the Petrol Pump of Sh. Rajender Verma Po