Loading…
Loading…
1,909 results • Best match
Renovation of Pilli Bandha (Toe Wall and Stone Grounting) Phase-2 under Chatrapur NAC
Construction of Toe wall in KSDR Embankment from RD 60.80 to 61.00 Km.1785922
Construction of Toe wall and lining l of Jakeikela Minor of Rukura Irrigation Project
Renovation of Pilli Bandha (Toe Wall and Stone Grounting) Phase-1 under Chatrapur NAC
Construction of SLMC Left embankment RCC toe wall with earth work at RD 9800M
N.H-60 to Gohiragadia_Road_RCC Retaining wall _0.000 to 0.080
Extension to canal lining with slope protection to Sarthapur SM 1R, Nuamanitri SM 5R of LMC of Manjore Irrigation Project.
Construction of bathing ghat and slope protection to left bank of river Baghua near village Biranchipur under Baghua Irrigation Project.
Slope protection work at RD 280m to RD 450m, at RD 3180m and raising strengthening of banks of moter minor
Construction of bathing ghat and slope protection to right bank of river Baghua near village Tavapalli under Baghua Irrigation Project.
Construction of bathing ghat and slope protection to left bank of river Baghua near village Tavapalli under Baghua Irrigation Project.
Construction of bathing ghat and slope protection to right bank of river Baghua near village Biranchipur under Baghua Irrigation Project.
Repair of fall, slope protection work and bank strengthening in between RD 00m to RD 900m of Balichada Sub-Minor.
Construction of bathing ghat and slope protection to right bank of river Baghua near village Dadarakhola under Baghua Irrigation Project.
Slope protection to Left Bank Country side of LBC from Gambharia Syphone from RD-21350 m to RD 21908 m.
MR to spillway of BDP for the year 2023-24(construction of slope protection work on down stream of spillway)
Improvement and slope protection of right flood embankment of Kurumunda bridge down stream Phase II for the year 2026-27
Construction of toe wall in KSDR Embankment from RD 52.750 Km. to 53.00 Km.
Construction of toe wall in KSDR Embankment from RD 60.20 Km. to 60.500 Km
Construction of toe wall on KSDR Embankment at RD 9.250 Km. near village Khandeita
Toe wall at RD 4300 M of Bairagibahal Minor and RD 10 m of Nilakanthapur Sub Minor and canal lining and Toe wall at RD 1000 M of Nilakanthapur Sub Minor of Saraphgarh Irrigation Project
Repair to slope protection on right bank at downstream of Birupa Barrage for the year 2025-26. (MBD09/2025-26)
Repair to slope protection of right bank at downstream of Birupa Barrage for the year 2026-27.(MBD57/2026-27)
Constr.of Toe wall on Bhawanipatana Gunupur kashipur Rupkona Road from Ch.68/710 to68/910km
Construction of SLMC left embankment RCC toe wall with earth work at RD 10850 M
Construction of retaining wall
Repair of CD at RD 1740m and 2070m and slope protection work in between RD 120m to 435m of Ghumar Minor
Slope protection such as wall lining and renovation of structures of Dharamgarh Minor and Brahman Chhendia Minor under Non-Plan (Critical).
Slope protection of Kharkhara nallah D/S bridge from RD 632m to 800m of village Chanabeda for the year 2026-27
Sunareddy to Jaganathapur Road WMM, SDBC ,Retaining wall 0.000 to1.230
Construction of Retaining Wall near Katardhua Bandh Ward No-19
Reconstruction of retaining wall at Korapokhari in Ward No.46.
Construction of RCC Retaining Wall at maa Hingula Temple, Talcher
Construction of retaining wall near Maa Jhankarani Temple at Burla.
Borasingi to Bhatapada road Road Retaining Wall 0.800 to 0.970
Construction of Retaining Wall at Kalpana Enterprises at IE Kalunga
PWD road to Rishipur Road Retaining Wall 0.200 to 0.350
Construction of toe wall with strengthening to KSDR Embankment from RD 59.85 to 60.20 Km
SH-25 to MPV-12_Road_1 no Boxcell (2x6x3),Toe wall and CC road_At 1/850 km
Special repair to Sundhol Gorumahisani Rairangpur R.Wall and Toe wall road for the year 2023-24
Construction of Toe wall and one addl VRB at RD 760m of LaxmiNarayanpur Minor of RIP
Improvement to SLMC Left Bank from RD 13575 M to 14420 M with RCC toe wall
Construction of protection wall
Improvement to Subalatamila Drainage Cut and Link drain of Gorigola Thakurpatna DC with Construction of Slope Protection work under DOAB No-II
Renovation of CD including repair of fall, bank strengthening, slope protection work in between RD 00m to RD 2500m of Habaspur Minor
Slope protection on Chitrotpala right embankment at RD 25.100 Km and RD 25.500 Km near village Uttarkul for the year 2026-27
Improvement and slope protection to left flood embankment of Bhainsimundi nallah near D/S of PWD bridge for the year 2026-27
CONSTRUCTION OF RCC RETAINING WALL SHED RIGID PAVEMENT AND PAVER BLOCK AT LUMP LOADING PLANT AND RCC RETAINING WALL AT FINES LOADING PLANT OF BOLANI ORES MINES
Colour Washing to both side retaining walls of NH-16 Fly Over from Jayadev Vihar to D.N. Regalia Junction of Bhubaneswar.
protection wall