Loading…
Loading…
8,037 results • Best match
RFP for engagement of Project Management Consultant (PMC) for the work 'Construction of Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse Waterline, Pedestrian Tracks, Cycle Track, Avenue Plantation and Street Furniture in E3 (Phase II), N4, N7 and N10 roads including DLP 2 years in Amaravati, Andhra Pradesh
APCRDA - Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Kuragallu(P), Nidamarru(P) in Zone 12A Villages area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years
RFP for engagement of Project Management Consultant (PMC) for the work 'Construction of Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse Waterline, Pedestrian Tracks, Cycle Track, Avenue Plantation and Street Furniture in E16, N1, N2, N3A and N3B, and N5 roads including DLP 2 years in Amaravati, Andhra Pradesh
RFP for Engagement ofProject Management Consultant(PMC) for the work of WORLD BANK & ADB financed Amaravati Capital City Development Program related to Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power & ICT, Reuse waterline & Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Zone- 6 including DLP of 2 Years
APCRDA - Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Thulluru (P) and Ananthavaram (P) Villages in Zone 5C Area in Amaravati Capital City, Andhra Pradesh on Lump sum contract ( Percentage Tender) including DLP of 2 Years
Construction of Office Building (Basement G 5 Storeyed) including Internal Water Supply, Sanitary installations, Drainage IEI & Fans, Fire Fighting with Wet riser system, Automatic Fire Alarm System, Mechanical Ventilation, Lifts, UPS Backup, AV ... Sump, Internal roads , ...
Construction of 17 Court Building complex at Vizianagaram Andhra Pradesh including water supply sanitary installations drainage IEI Fans water coolers UPS System Fire Fighting with wet riser system Addressable Fire Alarm System 7 Nos 13 Passenger ... Sump Internal roads Storm ...
Providing CC Road & Construction CC Drain for SC Locality in Sivalaym Street in 13th ward under SCSP 2016-17. (4th call)
Formation of road & Construction of CC drain from Near Nagara Panchayat Office to Anne Babu Rao road in Vuyyuru Nagara Panchayat.
Providing CC Road & Construction of CC Drain from DNo.7-26-1/2 to 7-26-7/1 in 11th ward.
Providing CC Road & Construction of CC Drain to Elima Church Street (Gunje Vari Street) in 31st ward under SCSP 2016-17.
Laying of CC Road & Construction of CC Drains Both sides at Saraswati School road(Beside Srinu Hotel) in Div No.46.
Providing of CC Road & Construction of drain from Katta yabu House to Ramesh House in ward No-32 in chirala municipality
Providing of CC Road & Construction of drain from Katta yabu House to Ramesh House in ward No-32 in chirala municipality
Providing of CC Road & Construction of drain from Katta yabu House to Ramesh House in ward No-32 in chirala municipality
Providing CC Road & Construction CC Drain for SC Locality in Sivalaym Street in 13th ward under SCSP 2016-17. (2nd call)
Laying of CC Road & Construction of CC Drains Both sides at Saraswati School road(Beside Srinu Hotel) in Div No.46.
Providing CC Road & Construction of CC Drains Both sides at Villas Road and Vidya Nagar 3/10 in Div. No.46
Laying of CC Road Construction of CC drains near brahmam gari temple Venugopalapuram in Division No.22 under AE-5 Section.
Providing CC Road & Construction of CC Drain to Elima Church Street (Gunje Vari Street) in 31st ward under SCSP 2016-17.
LAYING OF C.C. SURFACE ROAD CONSTRUCTION OF C.C. DRAIN AND CULVERTS AT KOTHA KAKINADA NEAR COMMUNITY TOILETS OF 7TH DIVISION. (RECALL)
Laying of CC Road, Construction of CC Drain from D.No.39-429 to D.No.39-483 in Mapakshi in Div.No.13
Maintenance of Road work from Ethakayala banda to Kodur Range Border in B.D Bhavi Beat of B.D Bhavi Section of Rajampet Range RSFP Scheme -2nd call
Maintenance of Road work from Ethakayala banda to Kodur Range Border in B.D Bhavi Beat of B.D Bhavi Section of Rajampet Range RSFP Scheme -2nd call
Special Repairs to the road work from Kuneru to Ballapadu 0/0 to 10/0 Km in Komarada (M) of Vizianagaram District.(As per GO.Ms.No.73)
Maintenance of Road work from Thummala Bylu bungalow to Chakireavulu in Vattaluru Beat of Thummala Bylu Section of Rajampet Range during 2018-19 -1 st Call
Providing Footh Path and Interlocking Tiles for TTd Road from Rajendranagar to Nandam Gani Raju Junction in 7th and 8th division.(End to End Road Work)
Giddalur Nagar Panchayat - SFC Grants - Construction of Road and Drain from Pilli Venkataiah House to Radio Bhavi and Pilli Venkataiah House to Sivapuram Anjaneyulu House in Ward No.8
Construction of Road and Bridge (Low level causeway across Chakirevu) on the road from Janapadu to Devarampadu donka in Janapadu Village of Piduguralla Mandal, Estimate Cost Rs.50.00 lakhs
Construction of Road and Bridge (Low level causeway across Chakirevu) on the road from Janapadu to Devarampadu donka in Janapadu Village of Piduguralla Mandal, Estimate Cost Rs.50.00 lakhs
Construction of Road dam from Gollalaguduru to Gotur road at Mallikarjuna Reddy field in Gollalaguduru (V&GP) of Vemula Mandal in YSR Kadapa District, Estimate Cost Rs.10.00 Lakhs.
Construction of Road, Storm water Drainage, and Utilities for E13 Road Extension to National Highway-16 on Lump sum Contract (Percentage Tender) including DLP 2 Years in Andhra Pradesh
Providing Intensive Patch work to A.Puttur - Satyavedu to Kopedu Extra link road from Km 15/6-10,16/0-4 and 17/2-4 B.Koppedu to Kavanur road from Km 0/0-4,0/8-10,1/2-4,1/8-10,2/0-4,2/6-10 and 3/0-2 in Chittoor district.
Construction of Approach Road from Community Hall to Betrayaswamy Temple at Urlaobanapalle GP in Kuppam Mandal,Chittoor District Est. Cost Rs.50.00 Lakhs
Package No.APGNT-PMGSY/2018-001 (2 Works) Package Est.Cost. Rs. 70.00 Lakhs. 1) BT to the road from Manchala to Thotapalem (V) in Chebrolu(M) Est.Rs.35.00 Lakhs. 2) BT to the road from R&B road to sekuru in Chebrolu (M) Est.Rs. 35.00 Lakhs.
Shifting of Utilities (APSPDCL) in Pulivendula - Parnapalli Road from Km 0/6 to 1/4 at Pulivendula, YSR Dist (Shifting of existing 33 KV, 11KV, LT lines with Distribution Transformers under various 11KV feeders which obstructing Road widening from Vegetable Market to Parnapalli Ring Road Circle in Pulivendula Town under DC works under Turnkey basis pertaining to Operation section,Pulivendula Town D-2023-06-05-11-01-012)
Providing BT to the road from Chebrolu village to Kathipudi of Gollaprolu in East Godavri District
Providing BT to the road from Km 9/5 of Sankavaram - Velangi Road to P.Mallapuram (via) Siddivaripalem, Yerakapuram, Ankampalem of Sankhavaram(M) in East Godavari District
T04-A.Kothapalli to Thammayyapeta Via.P.E.Chinnayyapalem of Tondangi (M) in East Godavari District
Providing BT Road for a Length of 7.60 Km and 1000 mm Dia Pipe Culverts for Re-routing Connectivity to D.L. Puram, Chandanada and Vempadu Villages of Nakkapalli Mandal, Anakapalli District
Widening and strengthening of Existing road from 3.65m to 9.00m C/w from NH 516E to Approach junction of kanamam at IP-KANAMAM, Anandhapuram(M), Visakhapatnam District.
Road from T03-Rajapudi to Bhupatipalem of Jaggampeta Mandal in East Godavari Dist.
Improvements to the road from Km 66/7 - 68/7 of Nannoor - Chinnatekur - K. Nagalapuram - Penchikalapadu - Gudur - C. Belagal - Yemmiganur road in Kurnool District(By HMP).
Improvements to the road alampur R.S to E Thandrapadu road from km 0 0 to 2 4 in Kurnool district HMP
Improvements to the road Sunkesula Naguladinne road from km 14 5 22 0 in Kurnool district HMP
Providing KM & HM stones on State Highways pertaining to (R&B) sub-division, Kodumur in Kurnool District.
Formation of CC Road from PP Road near Petrol bunk to Parnapalli Komannuthala R and B Road in Parnapalli Village of Lingala Mandal in YSR Kadapa District.
Urgent Repairs to MC road to Kolanakuduru ( NLMD 121 ) from KM 0/0 to 4/0 in SPSR Nellore District.
Providing KM and HM stones on State Highways pertaining to R and B sub division Kurnool in Kurnool District
Improvements to the road Baruva to Kanchili road from km.7/0 to 11/300 in Srikakulam district.