Loading…
Loading…
8,037 results • Best match
Maintenance of Road work in Kothur Beat of Kondur SEction of Chitvel Range during 2018-19 under Forest Protection Red Sander bearing area scheme.
Special Repairs to the road work from Kuneru to Ballapadu 0/0 to 10/0 Km in Komarada (M) of Vizianagaram District.(3rd call)
Balance Incomplete CC Road work from 100 Feet road to Samsarella apartment at Income Tax Officer colony of Kanuru Circle of YSR Tadigadapa Municipality
UPGRADATION OF B.T. ROAD WORK FROM D.NO.49-5-1 TO 58-12-69 NEAR BURIAL GROUND WOMENS COLLEGE ROAD IN 17TH DIVISION. (GGMP)
Package No-19, Thirty One (31) Road Works Routine Maintenance for a Period of 12 Months of Devanakonda Mandal in Alur Constituency (BT+WBM+Gravel Roads) of Kurnool District, Estimate Cost Rs.35.20 Lakhs
Package No-31, Three (03) Road Works for Routine Maintenance for a Period of 12 Months of Kolimigundla Mandal in Banaganapalli Constituency (BT+WBM+Gravel Roads) in Kurnool District, Estimate Cost Rs.1.26 Lakhs
Package No-19, Thirty One (31) Road Works Routine Maintenance for a Period of 12 Months of Devanakonda Mandal in Alur Constituency (BT+WBM+Gravel Roads) of Kurnool District, Estimate Cost Rs.35.20 Lakhs
Package No-32, Two (02) Road Works Routine Maintenance for a Period of 12 Months of Koilakuntla Mandal in Banaganapalli Constituency (BT+WBM+Gravel Roads) in Kurnool District, Estimate Cost Rs.0.58/0.48 Lakhs
Package No-32, Two (02) Road Works Routine Maintenance for a Period of 12 Months of Koilakuntla Mandal in Banaganapalli Constituency (BT+WBM+Gravel Roads) in Kurnool District, Estimate Cost Rs.0.58/0.48 Lakhs
Raising of 5000 Nos., Avenue and Block plantation in various locations at Visakhapatnam i.e., Medical college and KGH surrounding gap areas 3000Nos., Collector office Campus gap area 1000Nos., Zilla Parishad Campus gap area 500Nos., and Dayal Nagar ... and internal road near ...
Construction of Road at Netham from D.No: 31-133 to 31-168 Beside & Muddukrishna puram from D.No: 30-299/B to Baskar house in Ward No. 17.
CONSTRUCTION OF ROAD FROM KUNAVARAM BRIDGE TO UPPALAGUPTAM R&B ROAD VIA PERAICHERUVU IN UPPALAGUPTAM MANDAL, EST.RS.90.00 LAKHS IN DR.B.R.AMBEDKAR KONASEEMA DISTRICT Est cost rs90.00 lakhs
Construction of Road CC road form D.No. 41/745-162 to Jamia Hidayathul Uloom Conventional Acadamic and Islamic Educational Institution near Katta, Ghouse Nagar in 27th division.
CONSTRUCTION OF ROAD SIDE DRAIN WALL AT SWARNA BHARATH I NAGAR C BLOCK MAIN ROAD NORTH SIDE IN ADAVITHAKKELLAPADU IN DIV. NO 41 UNDDER AE-06 SECTION
Construction of road and CC drain from Rupamma house to Devamma house in Gangampalli thanda (v) of Nasanakota (GP) of Ramagiri mandal Est. cost Rs.8.50 Lakhs
CONSTRUCTION OF ROAD SIDE DRAIN WALL AT SWARNA BHARATH I NAGAR C BLOCK MAIN ROAD NORTH SIDE IN ADAVITHAKKELLAPADU IN DIV. NO 41 UNDDER AE-06 SECTION
CONSTRUCTION OF ROAD SIDE DRAIN WALL AT SWARNA BHARATH I NAGAR C BLOCK MAIN ROAD NORTH SIDE IN ADAVITHAKKELLAPADU IN DIV. NO 41 UNDDER AE-06 SECTION
Providing BT Approach Road along with one side drain at Arilova New police station in ward No.10 of East Zone
Shifting of 11KV/LT lines along the road from Adda road junction to Gandi by pass Road in Vempalli Town for purpose of Road Widening to provide 4-lane of road from Chagalamarry to Rayachoty Via. Proddatur,Vempalli taken up by R&B Dapartment under DC works in operation section, Vempalli vide WBS No.WBS NO:-D-2020-06-05-21-01-005 in operation circle, Kadapa
Shifting of Utilities (APSPDCL) in Pulivendula - Ramireddipalli Palagiri Road from Km 0/0 to 1/2 at Pulivendula, YSR Dist (Shifting of existing 11KV LT lines and Dist. Transformer under 11KV Ulimella Road feeder which obstructing Road widening works from Ahobilapuram school to Ulimella Ring Road Circle in Pulivendula Town under DC works pertaining to Operation section, Pulivendula Town D-2023-06-05-11-01-014)
Shifting of Electrical utilities for the Road Pulivendula Ambakapalli Murarichinthala road from Km 0/0 to 1/6 (Shifting of Existing 33 kV 11 KV DTR1s and LT lines under various feeders which obstructing Road widening from Old RTC bus stand to Ambakapalli Ring Road Circle of Pulivendula Town under DC works pertaining to Operation Section, Pulivendula Town (D-2023-06-05-11-01-11)
RFP for engagement of Project Management Consultant (PMC) for the work 'Construction of Roads, Storm Water Drains, Water Supply Network, Sewerage Network, Utility Ducts for Power and ICT, Reuse Waterline, Pedestrian Tracks, Cycle Track, Avenue Plantation and Street Furniture in E11, E13, E15, N8 and N13 roads including DLP 2 years in Amaravati, Andhra Pradesh
Renewal of BT Road from D.no.8-3-11 to D.no:8-3-12/A internal roads of Vijayanagara palace layout in Pedawaltair ward no.20 of East Zone, GVMC
Laying of Cement Concrete Road,Construction of Cement concrete Drains,Septic Tank and Sewage lines and Drinking Water Supply Works
(A) IMPROVEMENTS TO THE RIDING SURFACE OF LINK ROAD CONNECTING NH9 TO NH5 THROUGH INDRAKEELADRI TUNNEL ROAD KM 3/6 TO 4/8 IN NTR DISTRICT (B) IMPROVEMENTS TO THE RIDING SURFACE OF OLD MADRAS CALCUTTA ROAD FROM KM 5/0 TO 7/9 IN NTR DISTRICT
(a) Improvements to the riding surface of Link road connecting NH9 to NH5 through Indrakeeladri tunnel road km 3/6 to 4/8 in NTR District (b) Improvements to the riding surface of Old Madras Calcutta road from km 5/0 to 7/9 in NTR District.
(A) IMPROVEMENTS TO THE RIDING SURFACE OF LINK ROAD CONNECTING NH9 TO NH5 THROUGH INDRAKEELADRI TUNNEL ROAD KM 3/6 TO 4/8 IN NTR DISTRICT (B) IMPROVEMENTS TO THE RIDING SURFACE OF OLD MADRAS CALCUTTA ROAD FROM KM 5/0 TO 7/9 IN NTR DISTRICT
(a) Improvements to the riding surface of Link road connecting NH9 to NH5 through Indrakeeladri tunnel road km 3/6 to 4/8 in NTR District (b) Improvements to the riding surface of Old Madras Calcutta road from km 5/0 to 7/9 in NTR District.
BT Patch work to Konada-Ramatheertham (R&B) Road to Konatalapalem (via) Yerukonda, Pasupam, Kollayavalasa from km.0/0 to 15/3 (VZMD041) and link road from Chowduvada to Chintapalli (R&B) Road from km.0/0 to 4/0 (VZMD042) in Vizianagaram District (2nd Call).
Maintenance of Rural Roads (a) Bangaripeta to P.Kothapalli (via) K.O.Mallavaram Jangalapalem from km 0.000 to 6.800 (b) Kotananduru to LD Peta (via) Allipudi from km 0.000 to 8.200 (c) Kottam to Kotananduru road (via) LD Peta and Kotananduru to TK Road (via) K.A.Mallavaram from km 0.000 to 10.800 (d) 30/2 km NT Road to Kotananduru (via) Billananduru, SR Peta from km 0.000 to 17.000 in (R and B) Section Tuni of (R and B) Division Rajahmundry for the year 2017 18. (Recently taken over PR Roads)
Maintenance of Rural Roads (a) Kothapalli-Kodada road ( 0/4 km ) to A.V. Nagarom (via) Seetharamapuram from K.M. 0.000 to 8/100 (b) AV Nagaram to Srungavruksham (via) Kodada from K.M. 0.000 to 8/600 (C) T. Venkatapuram to P. Agraharam (via) Timmapuram Vishnupuram Tetagunta Gowravpeta from K.M. 0.000 to 9.500 (d) Kodada to Uppada Addaripeta Road (via) Gorsapalem from 0.000 to 6.800 in (R and B) Section Tuni of (R and B) Division Rajahmundry for the year 2017 18 ( Recently taken over PR Roads)
Package No-10, Eighteen (18) Road Works Routine Maintenance for a Period of 12 Months of Allagadda Mandal in Allagadda Constituency (BT Roads+WBM Roads+Gravel Roads) in Kurnool District, Estimate Cost Rs.32.01 Lakhs.
Package No-12, Nine (09) Road Works Routine Maintenance for a Period of 12 Months of Owk Mandal in Banganapalli Constituency (BT Roads+WBM Roads+Gravel Roads) of Kurnool District, Estimate Cost Rs.8.38 Lakhs
Package No-12, Nine (09) Road Works Routine Maintenance for a Period of 12 Months of Owk Mandal in Banganapalli Constituency (BT Roads+WBM Roads+Gravel Roads) of Kurnool District, Estimate Cost Rs.8.38 Lakhs
Package No-12, Nine (09) Road Works Routine Maintenance for a Period of 12 Months of Owk Mandal in Banganapalli Constituency (BT Roads+WBM Roads+Gravel Roads) of Kurnool District, Estimate Cost Rs.8.38 Lakhs
Package No-9, Five (05) Road works Routine Maintenance for a period of 12 Months of Panyam Mandal in Panyam Constituency (BT Roads+WBM Roads+Gravel Roads) in Kurnool District, Estimate Cost Rs. 4.89 Lakhs.
Package No-13, Nine (09) Road Works Routine Maintenance for a Period of 12 Months of Gospadu Mandal in Nandyal Constituency (BT Roads+WBM Road+Gravel Roads) in Kurnool District, Estimate Cost Rs.21.03 Lakhs
Package No-13, Nine (09) Road Works Routine Maintenance for a Period of 12 Months of Gospadu Mandal in Nandyal Constituency (BT Roads+WBM Road+Gravel Roads) in Kurnool District, Estimate Cost Rs.21.03 Lakhs
Maintenance of Road work from M.Bhavi Beat boarder to Yanadiuttlu of Gadela Beat of Gadela Section of Kodur Range during 2018-19 under FPRSBA Scheme
Maintenance of road work from K.V.Bhavi to Peddarasividivanka of K.V. Bhavi North Beat of K.V.Bhavi Section of Kodur Range during 2018-19 under FPRSBA Scheme
Providing Foot Path and interlocking tiles for AVA road from Ramalayam Junction to Shelton Junction in 8th and 12th division.(End to End Road Work)
M.W:- (1) Widening and strengthening of Gavaravaram to Kasipuram raod from Km. 0.175 to 15.470 in Visakhapatnam District and (2) Widening and strengthening of road frm NH 43 to Revidi to Venkatapuram road (via) Inada, Korada, Majjipeta from Km. 0.0 to 11.560 in Visakhapatnam District S.W:- Hiring of Vehicle to the Superintending Engineer (R and B), Visakhapatnam for the period from 01.04.2022 to 31.03.2023 (12 Months)
Renovation of Wash rooms, Repairs to Aluminium Doors and Windows, Construction of Road crossing Cable ducts and Other miscellaneous works at 220KV Sub-station, PARAWADA in Visakhapatnam District.
Re Construction of Road from Kothuru R&B road to Hanuman Nagar of Venkatapuram (V) of Eluru. cos(M) Bit-1 Est t Rs.'10.00 Lakhs (23 % ZPGF)
Construction of CC Drain to Yevullamma Puntha Canal side Approach Road at G.B. Homes Apartments in 34th ward Tanuku Municipality (General Funds)
Providing BT Approach Road to Industrial area road opposite Delight Dhaba in Yerrabablem area of Mangalagiri Tadepalli Municipal Corporation under General Funds
Providing Road from Approach Road to Pushkara Ghat in Madupalli (V) of Ainavilli (M) in Dr.B.R. Ambedkar Konaseema Dist, Est.Rs.30.00 Lakhs
Providing CC Pavement From Y.Hazarath (D.No.6-3-24) House to Baireddy Subbrami Reddy (D.No.6-3-24/A) House at Masjid Opposite Street . And from Shaik Mastan (D.No.6-3-8) House to B.Srinivasula Reddy (D.No.6-3-11) at Islam Peta Internal Road in 2nd ward of Kavali Municipality(1st call)
APCRDA - Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Inavolu, Krishnayapalem, Kuragallu, Mandadam, Nowluru Villages in Zone 10 area in Amaravati Capital City, Andhra Pradesh on Lump sum contract (Percentage Tender) including DLP of 2 Years
APCRDA - Construction of Roads, Drains, Water Supply, Sewerage, utility Ducts for Power and ICT, Reuse waterline and Avenue Plantation, compatible with trunk infrastructure in Layouts for Land Pooling Schemes for Abbarajupalem, Borupalem, Dondapadu and Rayapudi (P) Villages in Zone 5A Area in Amaravati Capital City, Andhra Pradesh on Lump sum contract ( Percentage Tender) including DLP of 2 Years