Loading…
Loading…
7,280 results • Best match
SPECIAL REPAIR OF LINK ROADS FROM VILLAGE Manethi (Rewari-Narnaul Road) to Kund (ID-3315), Suba Seri to Raj. Border (ID-3323), Narsinghpur to Dharan (ID-3328), Nikhri to Bhatsana (ID-6009), Govindpura Bass to Sulkha (ID-4905), Banipur to Ibrahimpur
Laying of GSB-III, Interlocking Paver Block with Kerb, Safety Measurement, Earth Work in Berms.
S R WITH 80MM ILPB AND BC WITH WBM LAYER , EARTH WORK ON BERM AND ROAD SAFTY ITEMS
Special repair of link roads from 1.Shamri To Pugthala. (Road ID- 2610) 2Samri to Kailana (Road ID- 8555) In Baroda Constituency Distt. Sonepat Group No 8. (Work plan 2025-26)
1. PROVISION OF JUNGLE CLEARANCE2. PROVISION OF EARTH WORK3. PROVISION OF SUB BASE and BASE COURSE4. PROVISION OF BITUMINOUS WORK5. PROVISION OF INTERLOCKING PAVER BLOCKS and KERBS6. PROVISION OF PROTECTION AND SAFETY MEASURES
SPECIAL REPAIR OF LINK ROADS 2. VILLAGE PIPLI KHERRA TO SANPERA (ROAD ID- 2753) IN GANAUR CONSTITUENCY DISTT. SONEPAT..
Bituminous items, boundary pillar, km stone etc.
Special Repair of link roads (Road ID, 8753, 8754, 9562 and 6383) in Rai Constituency, Distt. Sonepat. Group no 11. (Work plan 2025-26)
80 MM THICK ILPB , 150 MM GSB ,EARTH WORK ON BERMS, KERB STONE, ROAD SAFETY ITEMS
Kharkhara to M/Garh Dadri Road (ID 595 ) RD 0 to 100 mtr IPB, RD 100-740 WBM plus PC, Mandhiyali to Prahlad Ki Dhani (ID 8316) RD 0 to 3000 mtr Patch plus PC and 3000 to 3390 WBM plus PC, Malia Ki Dhani to Garhi (ID 591) 100 to 880 WBM plus PC, Kur
80 MM THICK ILPB WITH 150 MM GSB ,BC, KERB STONE, EARTH WORK ON BERMS , ROAD SAFETY ITEMS
S.R WITH 80MM THICK ILP BLOCK OVER 150MM TH GSB WITH KERB STONE,EARTH WORK ON BERM AND ROAD SAFETY ITEMS
80MM THICK ILPB and 150 MM GSB and WBM and BC
The existing route consist of two nos HSAM Board link roads i.e. L/R from Franswala to Kaithal ( Length 2687 M i.e.From RD 550-3237 M) and L/R Chhot to Franswala via Bhanpura ( Length 5660 M i.e. From RD 0-5660 M)
Special Repair of L/R From Vill 1) Baproli to Chindaliya( ID-625) 2 ) Chindaliya to Mohanpur (ID-618) 3) Dohar Kalan to Goad ( ID-5146) in Narnaul Constituency.
80 MM THICK ILPB WITH 150 MM GSB ,BC, KERB STONE, EARTH WORK ON BERMS , ROAD SAFETY ITEMS
special repair of link roads from 1. Jhari to Devru road( Road ID 6649 ) 2. Atail to Bulandpur ( Road ID 6459) In Ganaur Constituency Distt. Sonepat Group No 3. (Work plan 2025-26)
Earth work. Pipe Culvert , WBM , BC, IPB, Road Safety Fixtures
Cleaning of Berms WBM Patches Earth Work On Berms Bituminous Concrete Scarifying Of Old P.Carpet
Earth work, 0.30 kg. and 0.75 kg., Bitumen Concrete, BM etc.
Special repair of 05 No. link roads (Road ID -4970, 8701, 8921, 2556, 4950) in Distt. Sonepat
Special repair of 2 Nos. link roads ID 8426, 7295) In Baroda Constituency Group No 5 Work plan 2025-26
Earth work, Sub Grade, GSB G-III, , Brick on edge, WMM, 0.75 kg. tack coat, BC, HP Culvert, Boundary pillar K.M. Stone and Sign board etc.
Earth work , WBM , BC , Paver Block , Pipe Culvert ,
Ordinary Repair of Link roads in jurisdiction of Garhi Sampla Kiloi Constituency (Road ID H-1931 and 1939) (Group-6) for the F.Y. 2022-23
Special repair of link roads from 1.Dhurana To Kaith. (Road ID- 2612) 2.Mudlana To Dhurana (Road ID- 2640) In Baroda Constituency Distt. Sonepat Group No 7. (Work plan 2025-26)
80 MM THICK ILPB WITH 150 MM GSB ,BC, KERB STONE, EARTH WORK ON BERMS , ROAD SAFETY ITEMS
SPECIAL REPAIR OF LINK ROADS OF VILL 1) Raimalikpur to Niyamatpur( ID- 623) 2) Budhawal to Morund (ID-5068) 3) Nangal Choudhary Behror road to Kotputali road Via Dhani Manjiya (ID-5069) 4) Dhani jajma to Nolayeja ( ID- 7782) GROUP -II YEAR 2024-25
Special repair of link roads in Ateli Constitunecy Group-I under work plan 2023-24 phase-I
Earth Work On Berms,WBM Patches,Bituminous Concrete, Road Safety Features
Dewas to Kothal Khurd (ID 9349 ) RD 0-4400 WBM plus PC, Nihalawas to Pall RD 0 to 290 IPB exist, 290 to 490 and 2600 to 2760 mtr IPB and 490 to 2600 mtr WBM plus PC (ID 5060), Nangal Sirohi to Deroli Jaat (ID 599) RD 0-530 and RD 2600-2830 Existing
SPECIAL REPAIR OF LINK ROADS OF VILL 1) Nuni Kalan to Neerpur(ID-5252) 2)Kanwi Muraripur to Raj. Border (ID-644) 3) Deroli to Rampura in Narnaul constituency.
Special Repair of 3 Nos. link roads Road ID 5501, 2719, 8260 in Rai Constituency Group No. 1
Total length 5710 mtr., Less 100 mtr. PIP block exist from RD 5610 to 5710 mtr., Net Length 5610 Mtr.Bitumen items, 0.75 kg.tack coat, earth work, burrows, road safety and culvert etc.
Special repair of link roads from 1. Banwasa to Bhanderi (Passing over village boundary of Baroda Thuthan) (Road ID- 8629) 2. Madina To Bhainswan Khurd. (Road ID- 2634) In Baroda Constituency Distt. Sonepat Group No 6. (Work plan 2025-26)
S.R WITH 8O MM ILPB AND B.C WITH PATCH WORK ,EARTH ON BERM .
Earthwork, WBM, Bituminous concrete (BC), Pipe Culvert, Road Safety Fixtures etc.
Bituminous work, road safety fixture and HPC etc.
Special repair of link roads in Kosli Constituency Group-II under work plan 2023-24 phase-I
Annual repair of link roads in Badhra Consty., Distt. Ch. Dadri (ID-448,462,4583, 6135,4579,4575 and 4582) for the year 2025-26
Special repair of link roads in Mahendergarh Constituency Group-II under work plan 2023-24 phase-I
Earthwork, WBM, B.C., TACK COAT, PIPE CULVERT, ROAD SAFETY FIXTURES
SPECIAL REPAIR OF LINK ROADS 3. KHERI TEGA TO SANPERA. (ROAD ID- 2757) IN GANAUR CONSTITUENCY DISTT. SONEPAT
S.R WITH 75 MM TH WBM LAYER WITH B. C. , 80MM TH . ILPBLOCK WITH SIDE KERB , EARTH WORK ON BERM AND ROAD SAFTY ITEMS
80MM THICK ILPBLOCK OVER 150MM TH GSB WITH SIDE KERB AND EARTH WORK ON BERM
SPECIAL REPAIR OF VARIOUS LINK ROADS IN KOSLI CONSTITUENCY DISTT. REWARI
SPECIAL REPAIR OF LINK ROADS 1. VILLAGE BADSHAHPUR MACHHRI TO VILLAGE NAINA TITARPUR. (ROAD ID- 6776) 2. VILLAGE CHHATIA DEVA TO ROLAD (ROAD ID- 4968) IN GOHANA CONSTITUENCY 3. VILLAGE JHAROTH TO JHAROTHI UP TO SONIPAT ROAD . (ROAD ID- 8306) IN KHAR
S.R WITH 75 MM TH WBM LAYER WITH B.C. and 80 MM TH. ILPBLOCK OVER 150 MM TH. GSB WITH SIDE KERB AND EARTH WORK ON BERM WITH ROAD SAFTY ITEMS
Special repair of link roads in Mahendergarh Constituency Group-I under work plan 2023-24 phase-I
80 MM THICK ILPB, GSB, WBM ,BC