Loading…
Loading…
10,884 results • Best match
R/R damages on link road from Thangi to Kunnu Charang Km. 0/00 to 20/00 (SH- Providing and fixing 3 Nos. Jhullah at various locations (1 No. at Hozo Nallah and 2 Nos. at Kunnu Charang road) under Kalpa Division, HP.PWD. Kalpa
Restoration of rain damages on C.o link road from Kulhan Bridge to Zara Singh House G.P Bilaspur in Km 0.0 to 1.700 SH Formation Cutting between RD 0.0 to 1.700 C.O 4.00mtr Span RCC Slab Culvert alongwith approach walls at RD 0.625 Under NDRF
RR Damages Link road Choabai Nandehal Pandehal road km 0 000 to 2 500 Dhawas to Choadhar road km 0 000 to 2 700 and Bunga Dodhari road km 0 000 to 1 500 SH Removal of slips and land slides in Various Rds
Restoaration of rain damages of Augmentation of various water supply scheme under IPH Section Geherwin from Kaherwin Nallah in Tehsil Jhandutta Distt. Bilaspur H.P SH C/o wire crate to protect the link road to head works from RD 160/0 to 32 under PDN
Const and MT link road Nehri Santoo Tilla km 000 to 2000 in GP Nehri Naranga SH Formation cutting and filling including retaining walls between km 1000 to 1750 and 900mm dia RCC Hume pipe culverts at RD 1105 and 1135 and 1600 under MNP
Periodical maintenance on Ajouli to Pune km.0.0 to 2.0 (HP1205VR032) Pune to Binewal km.0.0 to 0.100 and 0.180 to 0.600 (HP1205VR033) and link road to village Fatehpur 0.0 to 0.700 (HP1205VR0137) ( SH PL 25 mm thick BC edge lines and cat eyes) unde
Repair and Restoration of Rain Damages link road Govt High School Gagret to Harijan Basti Kaloh to Gagret Oel Ispur road Km 000 to 2300 SH Relaying due to road crust damage Metaling and Tarring and Drain between Km 0500 to 0850 Under PDNA 2023
R R Damage to link road H B Sharot km 0 00 to 1 00 SH C o R wall and B Wall in wire crate at RD 0 300 to 0 320 0 300 to 0 315 and 0 400 to 0 420
Construction of link road NH-88 Paisa Chowk to Un-Connected Basti Balugaloa Km 0/000 to 2/000 in Distt. Kangra (H.P.). Under SCSP Head (SH-Construction of WBM Grade-I and cement concrete pavement (M-30) at RD 0/000 to 0/500)
C/O link road from Yangthang to Sasang Km. 0/00 to 0/900 in District Kinnaur HP (SH- C/O R/ wall in G.I. wire crate at RD. 0/480 to 0/505, 0/550 to 0/575 and 0/600 to 0/625
Repair and Maintenance of link road NH-07 to village Baluwala km 0/00 to 1/00 (SH-Construction of U-shape drain at RD 0/135 to 0/340 and edge wall and drain at RD 0/345 to 0/445 Left side portion).
R R damages on link road to Village Jabbal km 000 0 to 6 000 SH C O B Wall in wire crate at RD 2 900 to 2 930 2 870 to 2 915 and R Wall at RD 2 520 to 2 560
Construction of link road from Barot Balha to Batlahar including Bridge km 0.0 to 1.450 SH Construction of 5.7 mtr wide formation cutting of road from 0.690 to 0.900 including E.wall between RD 0.630 to 0.700 on Both side of road and Construction of
Construction of link road from NH-70 Saloha to village Badwal in GP Nounghi km 0/0 to 1/0. (SH P/L Wet Mix Macadam and 25mm thick BC in km 0/0 to 0/810 and Retaining wall, V-Shape drain etc.).
CONSTRUCTION OF LINK ROAD FROM KALOHA SHANTLA ROAD TO SIDH PUNANI ROAD KM 0.0 TO 1.500 SUB HEAD 5.7 METER VIDE FORMATION CUTTING 900NN DIA HUME PIPE CULVERT NP2 AT RD 0.950 AND M.T IN KM 0.0 TO 0.200 AND 0.550 TO 0.850 UNDER OTMNP
Construction of link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Formation Cutting 5/7 Mtrs wide road , Cross-Drainage and P/L Soling in Km 0/0 to 6/0)
C/o of link road from Khatnol to Dandibag km 0/00 to 6/150(SH-Formation cutting 5/7 mtr wide road km 0/00 to 6/150,CD work, Kharanja stone soling PCC parapets,Katacha road side drain, km stone, dumping site)
CONSTRUCTION OF LINK ROAD UPPER KALOHA NEHRN PUKHAR SADWAN ROAD TO UPPER KALOHA KM 0.0 TO 1.600 SUB HEAD C.O CEMENT CONCRETE PAVEMENT AT RD 0.250 TO 0.300 0.700 TO 0.800 AND V SHAPE DRAIN AT RD 0.200 TO0.300 AND 0.800 TO 0.900 UNDER SCSP
C/o road and Retaining wall from House of Bhajan Singh to Katirdoo Majra, G.P. Kashmirpur, C/o R.C.C. slab culvert and Retaining wall near Banka Ram Chandel House, Khera, C/o link road from Jatt Service Station to Borewell of Bhag SingH RADIYALI
Restoration of rain damages on link road Takarla to Basuni via Abadi Kamaldeen km 000 to 2400 SH Repair of Pot holes Const of both side berms and Providing and Erecting of W metal beam crash barrier in km 2200 to 2400 Under PDNA 2023
Job 2 Construction of Link road Harijan Basti Raipur Bare in Village Raipur Nichla km.0-0 to 0-800 Sub Head C.O Embankment, Retaining walls, P/L GSB, C.C Pavement and 30mm thick BC etc. in km 0-0 to 0-800 Under SCCP
Construction of link road from Dyala via ward No. 3 G.P. Badsar to Harizan Basti Km 0/00 to 1/500 (SW - P/L G-II, G-III, 20 MM thick Premix Carpet and seal coat in Km 0/700 to 1/200 (SCSP)
Co link road from Kaloha to Kakad Badh Harizan Basti Km. 00 to 1000 SH ROFD in Km. 0645 to 0870 Co solid causeway at RD 0247 to 0260 0400 to 0410 and Co 900mm dia hume pipe culvert at RD 0 640 under MMGSY
Slope stabilization and rock fall mitigation works at Km.10/530 to 10/700 along hill side of link road to Village Nesang (SH- Removal of loose rock mass, Construction of Gabion walls in benches in sliding zones and providing Erosion mat in sli
C.O link road from Powari road to Kangrang Km 0.00 to 3.600 SH- F.C from RD 1.675 to 1.735 and C.O wire crate R.wall at RD 1.600 to 1.690, B.wall at RD1.630 to 1.690, C.O R.R. masonry B.wall at RD 1.600 to 1.630 Under TASP
Annual Surfacing on Variuous Road under Shimla Division No. III. (SH - Renewal coat with 20mm thick Premix Carpet between Raod Link to Holyoak Km. 0/00 to 0/300, Link Road from Manchanda to Medical Store to IGMC Km. 0/00 to 0/300
Repair and Restoration of Rain Damages link road to Village Chalet km 000 to 6030 SH Construction of Breast wall near Gujran Kabristan and RD 2560 to 2575 Retaining wall between RD 4485 to 4510 and UShape Drain at RD 2195 to 2245 under PDNA
Link road Heyon to village Bhuan shalyana km 0/00 to 8/500 (SH -SH -C/O 900 mm dia hume pipe culvert at RD. 0/030,0/195,0/630 and C/O PCC R/Wall from Rd. 0/500 to 0/520) Under MNP
Job 4 Construction of and M.T of link road Raipur to Bakhawa via Mallan da Pind Km. 0-00 to 3-800 Sub Head Formation cutting 5-7 mtr. wide, including Retaining wall, Breast wall, Toe wall, Cross Drainage work and cement concrete pavement, Providing
Restoration of rain damages on C.o link road from Gill Basti to Veterinary Dispensary via Gaddi ST Tehla Basti Bhaklehr SC Basti G.P Bilaspur Salera in Km 0.0 to 3 00 SH ROFD P.L G-II Cement concrete pavement between RD 1.805 to 2.810 Construction
c.O LINK ROAD TO KABIR PANTHI BASTI WARD NO 5 GP SERI KK 0.0 TO 1.200 SH C.O 5.8 METER WIDE FORMATION CUTTING INKM 0.0 TO TO 0.630 .6 METER SPAN RCC SLAB CULVERT AT RD 0.720 C.O SOLID COUSEWAY IN BETEEN KM 0.0TO 0.630
Job 1 Construction of and M.T of link road Bhera Malkada to Panjora via Baba Balak Nath Temple including 1 No. Bridge Km. 0-0 to 8-635 Sub Head Formation Cutting , Retaining wall , Cross drainage work, GSB, WMM, 30mm thick SDBC, C.C. Pavement, U
Job 5 A.R and M.O Una Aghar Mandi Road km. 0-0 to 2-0 and Link road from Jhalera to Una via Lower Lalsingi km. 0-0 to 4-300 Sub Head P.L Patch work and repair of pot holes at various RDs
Job 7 Construction of and M.T link road Nangal Khurd Mohalla Thai lower Nangal Khurd and lower Manuwal Dulehar to Thakur Behli, Thakur Suddey to Dhalkki Bhaira Border Lower Panjawar , Tehsil Haroli District Una H.P in km 0-0 to 3-500 Sub Head Pr
Job 5 Construction of link road GHS Behdala to Khindrian WSS Tank Mohalla Palasrian km. 0-0 to 3-0 Sub Head Construction of C.C pavement at RD.1-396 to 1-725, along with drain and Retaining wall at various RDs Under OTMNP
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Providing and laying Base course G-II, G-III, P/L Metalling Tarring in Km 3/0 to 6/0)
Restoration of rain damages (PDNA) on link road from Telangi to Kothi Km. 0/00 to 1/635 (SH- C/O R/Wall in G.I. wire crate at RD 0/030 to 0/050, 0/090 to 0/110 and 0/125 to 0/145
Restoration of rain damages on various roads under Udaipur Sub Division (Thirot Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on link road from Lower Sindhwari to Upper Sindhwari Km. 0/00 to 4/00 (SDF/2024/169) lin
A/R and M/O on link road to village Challan Km 0/000 to 1/000 SH Construction of Retaining wall at RD 0/300 to 0/345 0/382 to 0/420 0/429 to 0/480 and 0/495 to 0/510
C/O link road pandal to Jokhati nerli Bayi Ram nath kaushal to Dev Raja mandir km 0/0 to 0/800 (SH ROFD by R/wall at KM 0/510 to 0/515 and 0/545 to 0/560). Under MNP 2020-307-406
Construction of link road to village Matari from Khantyo to Basali road Km 0/0 to 1/100 ( SH C/O 5/7 Mtr wide formation cutting, WBM G-I, WBM G-II and unlined drain in Km 0/0 to 0/570 ) under MNP
Construction of link road from village Bharli to village Rudana Thada Zizla km. 0/0 to 4/00(SH- C/o 900mm dia Hume pipe culvert along with wing walls at RDs 2/730 , 2/920 and Breast walls at RDs 2/710 , 2/880)
Job 2 Construction of link road Kuthar Harijan Basti from Una- Jaijon road RD 0-0 to 4-0 Sub Head P.L 80mm thick interlocking paver block at RD 2-0 to 2-500 and Retaining wall 2-300 to 2-315.Under SCCP
Repair and restoration of link road from new Victoria bridge via Treasury office upto schedule cast (SC) Basti Km. 0/0 to 0/410. (Sub Head- Providing and laying correction layer G-III (53-22 4mm) aggregate and 20mm thick premix carpet alongwith seal
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- C/o essential Parapets and C/o V- shape road side drain in Km 0/0 to 3/0)
Job 4 Construction of link road Panjawar Bathri road to Baba Bharthri Mandir Nagnoli km. 0-0 to 0-400 Sub Head Filling, GSB, WMM, BC in km. 0-0 to 0-350 ,CC Pavement in km. 0-350 to 0-400 Under DMFT
Restoration and reconstruction of sampark Marg fom link road to the H/o Sh. Ram Swaroop, GP Khad SH P/L 60mm paver block RD 0/180 to 0/300 and C/O 1.50m span RCC slab culvert at RD 0/237 under MMSY
Restoration of rain damages on link road from Sameli Gujreda to Omkar chand house in km 000 t0 1000SH Providing and laying 20mm thick premix carpet from RD 000 to 0250 and Co Retaining wall VShape drain between RD 000 to 0250 Under NDRF
IE services for Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500, km 126.500 to km 158.500 including ACC link road from km 0 to km 2.003) Greenfield Alignment (Pkg2) in Himachal Pradesh on HAM.
Balance Work for Four laning of Kiratpur to Nerchowk section of NH21 (from KM 12.750 to km 26.500 km 126.500 to km 158.500 including ACC link road from km 0.00 to km 2.003) Greenfield Alignment (Package2) in the State of Himachal Pradesh on HAM.