Loading…
Loading…
10,884 results • Best match
Restoration of rain damages on Dohra Nallah to Barahar road Km 0/0 to 10/00 (SH- Re-construction of road Removal of slips at various Rds
Restoration of rain damages at various Location under Shimla Division No.III SH Construction of road side drain and repair of culvert near Himfed Petrol Pump at Rd08.105
A R AND M O Road at Industrial Area Bhatolikalan Ph IV Baddi Distt Solan H P Sub Head Construction of Road side RCC U shaped Drain
Construction of road from Dhunju to Kareri Km 0/000 to 2/500 SH- F/C 5/7 mtr width in Km 1/900 to 2/500
Construction of road from Kushi Ram House to Nanda House (SH Up gradation of road from RD 0 0 to 0 200 mtr) ward No 33 Khalini
Restoration of rain damages on Kharihar to Linger Banasu road Km 0/0 to 11/500 (SH- Re-construction of road Removal of slips at various Rds
Restoration of rain damages on Chharour Nallh to Bharain road Km 0/0 to 6/700 (SH- Re-construction of road Removal of slips at various Rds)
Construction of road side parking on road from Sanjauli to Dhingu Dhar in ward No 22 Shanti Vihar (Phase I) Balance work under Shimla Smart City Mission
Restoration of rain damages on Dohra Nallah to Kharihar road Km 0/0 to 10/120 (SH- Re-construction of road Removal of slips at various Rds
Construction of Timbi Millah road Km 0/0 to 5/0 (SH Construction of road side parapets in various reaches from Km 1/915 to 3/00).
Construction of road leading to Patti Mode from Patti Nallah Lower Dev Nagar (SH Providing and Laying stone Soling and RCC Culverts etc)in ward No 29
Construction of Road and drain from Suind Bridge to Power House Gate of Parbati H.E Project (Stage-II) including renovation of Suind Bridge (Package No. C-607).
SH construction of building portion water supply and sanitary installation rain water harvesting tank septic tank site development and approach road
Providing and laying cement concrete Paver Block from main gate to Admin Block Approach road Km. 0/0 to 0/068)
SH C/o site development Building portion including WS and SI, septic tank, Rain Water harvesting tank and approach road etc.
(SH- C/O CC Retaining wall to protection for approach road at pump house Diyar at stage-3) Job no-II)
Construction of Mini Secretriat at Killar Pangi District Chamba SH Co Approach road Land Scaping and 1 No entry gate etc
Tender for Construction of Paved approach road to 33 11 KV 2x1.6 MVA Sub Station Saloh under ESD HPSEBL Haroli Una
P/M of balance work of Rathan Ropa Kapoor Basti Dattal Ghar via Jagraina road under Rural road (HP0402VR016919302) (AMP 2022-23) Phase-I (SW- P/L 30 mm thick BC with paver finisher at RD 0/0 to 0/400, 1/0 to 3/400, 3/500 to 3/800 , 3/830 to 4/450
SH-Providing and laying 25mm thick Bituminous Concrete in km. 0/0 to 1/270 and 0/0 to 1/0 including profile correction).
ROFD, Protection works, Cross Drainage works, Metalling and Tarring works, Road Side Drain, Crash Barrier, Parapets, Road Safety, Km. stone and Dumping structure in Km. 0/00 to 1/500).
Providing and laying Tack coat and Bituminous Concrete in Km 6/0 to 7/0
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 2/0
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 2/0
Providing and laying 25mm Thick bituminous concrete in km 2.00 to 4.00
R/R Damages on Punni Naswar Road Km 0/0 to 3/0(SH Widening of road Km. 0/00 to 3/00, C/O PCC R/Wall at RD 0/180 to 0/190 ,0/440 to 0/460, 0/660 to 0/675, 0/715 to 0/725, 0/840 to 0/860, 0/915 to 0/925, 1/030 to 1/040, 1/060 to 1/070, 1/185 to 1/195
R/R Damages on Punni Naswar Road Km 0/0 to 3/0(SH Widening of road Km. 0/00 to 3/00, C/O PCC R/Wall at RD 0/180 to 0/190 ,0/440 to 0/460, 0/660 to 0/675, 0/715 to 0/725, 0/840 to 0/860, 0/915 to 0/925, 1/030 to 1/040, 1/060 to 1/070, 1/185 to 1/19
SH Hiring of J.C.B/Excavator-cum Loader for removal of Snow/land slide on link road Tandi Wari Lapshak Yangrang road (NDRF Sr. No. 3), link road to village Linger Km. 0/00 to 2/500 (NDRF Sr. No. 5), link road from Malang to Krozing (NDRF Sr. No. 11)
Repair and maintenance of road Construction of retaining wall near Rana house and Munshi Ram house in Ward No.2.
P/L 80mm ISI Mark paver tiles and protection wall for road construction to Ward No 1, Bypass road Baddi
Supply and Installation of LED flood lights on new road construction site between North and South campus of IIT Mandi
Annual Surfacing of Jaisinghpur to Vijapur road km 0/0 to 2/0 (DRRP No. HP0407VR0054) (Rural Road)
Repair of pot Holes in between Km 0/00 to 4/555, 0/0 to 2/00 ,4/00 to 7/00, 0/00 to 2/00, 0/00 to 2/00 respectively)
SH ROFD in km 0/0 to 0300 Co V Shape drain alongwith Edge wall and Co 900mm dia RCC Hume Pipe Culvert at RD 0070 and RD 0285
SH P/L Interlocking Paver Block in Km 0/600 to 0/680)
Paver block and CC Pavement.
P/L CC Pavement in various RDs
(SH P/L interlocking pave block in Km 0.170 to 0.390)
Repair of Pot Hole / patch work between Km 2/00 to 7/630) (MMRRY)
Providing and laying Water Bound Macadam Grading-1 at Km 0/000 to 0/800
Construction of Retaining Wall in PCC at 0 010 to 0 020 to 0275 to 0 282 Under PDNA
Formation cutting in km 0/00 to 0/600
Km 0/00 to 0/250 C/O 4.00 mtr span RCC Slab Type culvert at Rd 0/120
Balance work of C/o 4.00 mtr span culvert C/o R/wall at Rd 0/390 to 0/394.80 and 0/398.70 to 0/412.50
ROFD in km 6.680 to 6.745 and 7.020 to 7.450
SH C O R wall at Rd 0 270 to 0 383
P/L G-II and 20mm thick premix carpet.
C/o R/wall at various RDs
, Kudara km 0/0 to 3/200. C/o Hume pipe culvert with wing wall at km 2/115) (under OTMNP Head)
Providing and laying Patch work from RD 0/00 to 2/800 and C/o R/wall at RD 0/045 to 0/065 and 2/260 to 2/270) Under PDNA