Loading…
Loading…
10,884 results • Best match
Providing and laying wearing and tarring and construction of V-shape drain in Km. 0/0 to 0/700
SH Formation cutting 5.7 mtr. Wide road, C.O R.wall at RD 0.000 to 0.020 and 0.000 to 0.012 of old HT road
P/L CC pavement in essential reaches
SH C/O R/Wall in Km.0/158 to 0/178
ROFD, R/wall in wire crate work).
P/L soling and CC Work
PCC pavement at RD 3 400 to 3 500
Construction of R/Wall in Km. 0/300 to 0/320
Supply and Stacking of Crushed/Broken Stone agg. 20mm and Sand.
SH C/O 2.00 Meter Span Box Cell Culvert at RD. 0/120). (Under RRD Head)
SH C/O R/Wall in Km. 0/800 to 0/840) (Under RRD Head)
Sub Head- C/O R/Wall in Km. 0/720 to 0/735).
SH Formation cutting in km. 0/410 to 0/440 , R/Wall and Interlocking paver block in km. 0/410 to 0/610) under MNP
SH Formation cutting 5 7 mtr Wide km 0 00 to 0300 MMGSY
Formation deficiency and R/wall , Hume pipe culvert with wing walls
Re-Carpeting of Internal Road of Babeli camp of 2nd Bn ITB Police Kullu (HP).
SH Improvement of drainage system and widening of road Km 3/625 to 3/670 and construction of foot path at RD 3/650 to 3/729
C/o Link road Kotkhai Reoghati Road to H.B. Panog Road in K.M. 0/00 to 0/330, ROFD at R.D. 0/030 to 0/135 and C/o, B/Wall and R/Wall at various damaged/sliding RDs between in K.M. 0/00 to 0/200
Job 2 Periodical maintenance on link road from Una bridge to village Arniala via Mohalla Bazigran to Shiv Mandir to village Ajouli road Km. 2-500 to 6-300 Sub Head Patch work , 30 mm thick BC , zebra crossing and side lines VR0139 Under State H
Job 2 Construction of link road to Tibian village Polian Beet from Una Jaijon road Sub Head Construction of embankment, P.L GSB, WMM. Primer coat, tack coat, Premix carpet, seal coat at km. 0-0 to 0-400 and Construction Hume Pipe culvert at RD.0-010
Construction of balance work of link road from Dera Sacha Soda Near Dulo Ram and Upper Resherd, Harisan Basti via Balla Chambi T-Estate Harizan Basti Rajehar Km. 0/00 to 4/015 in Distt.Kangra (H.P.) under RIDF-XXV(Nabard) (SW- F/C ,passing places, R/
C/o link road from Chamb Bhujan road to Palangiri village Kangoo Ka Johar Km. 0/0 to 0/800 (SH- Providing and laying Grade-I, Grade-II and premix carpet, R/wall, W/wall, B/wall, Drain and parapets in Km. 0/0 to 0/800)
Job 2 Construction of New link road from Lalsingi Baba Beli Ram to Jhalera Near brick kiln from km. 0-0 to 4-170 Sub Head Formation Cutting 5-7 mtr. wide including Retaining wall , Breast wall and toe wall, Cross drainage work and Cement Concrete
CONSTRUCTION OF LINK ROAD BAGLI NH-503 TO HARIJAN BASTI MANDWARA VIA MANHAS BASTI VAID BASTI KM 0.0 TO 2.880 SUB HEAD ROFD FROM RD 0.430 TO 0.520 C.O R.WALL AT RD 0.430 TO 0.465 CEMENT CONCRETE PAVEMENT AT RD 0.430 TO 0.640 C.O EMBANKMENT AT
R/R Damages on Dhingli to Dhingli Dochi link Road in km 0/00 to 1/120 C/o R/wall at various damaged/Sliding Rds between Km 0/870 to 0/950 and ROFD between Rd 0/00 to 0/060 ,0/820 to 0/865
C/O link road from Chhamb Bhujan road to Palagry Village Kangoo ka Johar km. 0/0 to 0/800(SH-C/O P.C.C Retaining wall at various Rds and C/O 900mm dia Hume pipe culvert NP2 at R.D. 0/165 ,0/255 and 0/375).
Job 8 Construction of link road to Bangarh Panchayat to Village Fatehwal Lawana Basti Mehatpur Handola Road to Mehatpur Panchayat Ward No. 4 km. 0-0 to 2-200 Sub Head C.O Retaining wall, GSB, WMM, CC Pavement in RD. 0-460 to 0-720 Under OTMNP
C.O LINK ROAD FROM MASEH KHAD TO KURAIL KAHD HARIJAN BASTI JATOLI KHATRIAN JATOLI CHALRAN GP LOULAPUR BLOCK PRAGPUR KM 0.0 TO 5.600 SUB HEAD FORMATION CUTTING ROFD BETWEEN KM 0.705 TO 0.900 AND 2.00 TO 2.170 AND C.O R.WALL AT RD 1.995 TO 2.070 UND
Restoration and repair work of link road Ajouli Sanoli upto Punjab Boundary km.0.0 to 4.200 (SH Providing and fixing paver blocks at RD.2.800 to 3.140 and Circular road Sanoli km.0.0 to 1.800 (SH Providing and fixing paver blocks at RD.0.450 to 0.465
Periodical renewal on link road to village Ghuttanpur and Rampurghat to Giri River road (SH- Repair of pot holes by Providing penetration for correction layer and 30mm thick bituminous concrete in km. 1/0 to 2/200 and km. 0/0 to 0/500). under AMP fo
C/O Link road to Panchayat Head Quarter Spillow from 2nd Curve of Labrang road Km. 0/00 to 1/480 (SH-- F/C from Km. 0/330 to 0/750 and C/O R/wall in G.I. wire crate at RD. 0/330 to 0/525)
C O and MT link road Repoh to Sandhari Karap Gondpur Badoh Mairi Gurudwara Portion Repoh to Karap 000 to 2000 SH CO 3 mtr RCC slab culvert at RD 1440 and CO 900mm dia RCC Hume pipe culvert at RD 1675 1810 and 2150 under MNP
Construction of bridge over Ispur Khad at Km 0/075 on link road Petrol Pump Bhadsali to Una Hoshiarpur road to Pandoga Lower to Har sainian abadi from Km 0/0 to 3/00 SH Prepation of General arrangement drawing, structural design of sub structure and
Construction of link road to village Sathru km 000 to 1300 SH Formation cutting filling CO RCC Hume pipe culvert at RD 0605 and 0705 CO edge wall at RD 0175 to 0200 Breast wall at RD 0240 to 0285 and 0315 to 0350 under SCCP
Construction of 4 Span 14 M Each RCC T Beam Bridge over Chandpur Khad at RD 3705 on Link Road Panjawar Bathri Road to Nangal Khurd Chandpur T12 From Km 0000 To Km 5670 Under PMGSYIII Batch II In Distt Una HP Package No HP12 205 A
RR Damage to Link Road Tikkari to Tangnu Road km 000 to 1500 SH CO V Shape Drain from Km 000 to 200 in PCC from Km 000 to 200 in PCC 136 AND U Shape Drain in PCC 124 from Km 200 to 2600 UNDER PDNA
Restoration of rain damages on link road Meclodganj Chowk to H. H. Dalai Lama temple km 0/000 to 0/450 km in Tehsil Dharamshala, Distt. Kangra H.P. SH- Construction of Retaining wall with pustha at RD 0/380 to 0/425 and providing and laying interloc
C.O OF LINK ROAD FROM MAIN ROAD TO RANA BASTI VIA LOTUS INTERNATIONAL CONVENT CHOOL RAKKAR AT KALOHA TEHSIL RAKKAR DISTT KANGRA SUB HEAD CEMENT CONCRETE PAVEMENT AT RD 0.180 TO 0.215 C.O FILLING AT RD 0.180 TO 0.230 C..O WIRE CRATE AT RD 0.195
R/R of Damages on link road from Jalath -I to Jalath-II km 0/00 to 0/900 C/o R/Wall at RD 0/620 to 0/640,0/660 to 0/685, 0/890 to 0/900 and RD 0/735 to 0/745
Construction of link road from Dohgad to Khalair Km. 0/00 to 2/840. Under SCSP. (SH- Improvement of Formation deficiency between Km. 0/00 to 0/675, C.D. works, C/o R/walls at various Rds, Kharanja Stone soling in essential reaches, Parapets and un-li
Restoration of rain damages on various roads under Udaipur Sub Division (Miyar Section) (SH Hiring of J.C.B/Excavator cum loader for removal of Snow/Landslide on Miyar Valley Road Km. 24/0 to 30/0) (SDF/2024/160) and link road to village Ghari in Miy
C/o Link road Chanour Tiamal Sheetla road to Sarai Raru Khatta Km 0/0 to 0/650 SH C/o R/wall from RD 0/075 to 0/090 and P/L CC interlocking paver block from RD 0/060 to 0/200 under MMGSY
R/R Damages on Link road Diggal Dalchhamb via Jaged road km 0/000 to 6/6400 (SH C/o B/wall at Rd 0/120 to 0/140 and 0/220 to 0/250) (Under PDNA )(LAT 76.857324,LOG 31.090568 and LAT 76.855762,LOG 31.091900
C.O link road from Kuppa to Palika Sariyo Km 0.00 to 5.00 SH- C.O R. Wall at RD 2.080 to 2.100 and 2.130 to 2.145 and C.O B. Wall at RD 2.127 to 2.148 and C.O B.wall cum protection at RD 1.430 to 1.446 Under MMGSY.
Widening and CD/MT of link road to Bhureshwar Mahadev Temple in km 0/0 to 2/315 (SH ROFD, R/wall, CD works , GSB , WBM-II III, M/T works , Road side V-shape drain and Parapets etc. in km 0/00 to 2/315
C/O link road from Upper Richenag to Kutumdumb Km. 0/00 to 1/900 in Pooh, District Kinnaur HP (SH- C/O R/wall in G.I. wire crate at RD. 0/00 to 0/055 abd F/C from Km. 0/055 to 0/540
Annual Periodical Maintenance plan on link road to village ShahshurGompa Km 0/0 to 6/500 (VR-090) for the year 2025-26 (Village road) (SH - Providing and laying 20 mm Premix carpet including G-III and thermoplastic edge line in Km 0/00 to 1/00