Loading…
Loading…
10,884 results • Best match
MT on Link road Olinda to Bohru from km0000 to km 11090 under NABARD RIDF XXVII SH Formation cutting Co Retaining wall CD work CC Pavement PL GSB WMM PL Bituminous concrete Road side Drain Parapets PF Kilometer stone Sign Boards in Km 0000 to 11090
Repair and Restoration of Rain Damages on link road Thakuran Wala Kuan to Connect Major Gurdev singh road Km 000 to 1700 SH CO 300 Mtr Span RCC slab culvert at RD 0015 Paver Block and Breast wall between RD 1600 to 1690 Under PDNA 2023
R R Damage to Link road village Jabbal SH C o B wall in wire crate at Rd 3 840 to 3 900 and removal of slips at RD 2 195 to 2 300 1 735 to 1 840 3 00 to 3 345 UNDER PDNA
Job 6 Construction of link road from Baba Beli Ram Dera to Ward No. 6 of Village Lal Singi Tehsil and Distt. Una at Km. 0-0 to 1-200 G.P.Lalsingi Sub Head C.O C.C Pavement and drain at RD. 0-0 to 0-138 Under MMSY
R/R Damages on link road to Jailand Km 0/00 to 1/500 C/o Protection wall of Up Stream of Culvert at RD 0/040 and B/wall at RD 0/05 to 0/020 and E/wall at RD 0/070 to 0/078
A/R and M/O link road to IIM near Bangala Basti at Rampurghat Tehsil Paonta Sahib, Distt. Sirmour (HP) (SH-P/L G.S.B., Wet mix, 50mm. thick bituminous macadam and 30mm. thick bituminous concrete along with road marking paint from RD. 0/0 to 0/675).
C/O link road from kenchi Mour to Jhiran Chirkhoo Khled Upperli G.P Keori km 0/0 to 12/240 (SH C/O 900 mm dia HPC at RD 0/150 and 0/250 and Gr-1 at RD 0/0 to 0/300) Under SCDP MMGSY
Const of link road Karluhi to Mandholi km 000 to 5500 SH Const of Retaining wall at RD 5150 to 5165 5455 to 5475 LHS 5685 to 5700 RHS and 5690 to 5710 LHS and Const of 900mm dia Hume pipe culvert at RD 5315 under MNP
Construction of link road H/Basti bum to Galah , Galahi, Hambot , Hatwar km 0/00 to 2/00 SH Metalling and Tarring work in km 0/00 to 0/026, 0/270 to 0/650, 0/720 to 0/855 and 0/925 to 1/208
Restoration of rain damages on link road from Ladhyani brota via Karan Lohat road km 0/00 to 4/00 SH C/o both side proposed approaches ladhyani side at Rd 0/573.60 to 0/610 and karan side at Rd 0/616 to 0/646.
Construction of Link road from Jole to Kainth via Choora Amroh Dharun Kuhroo Sanjhot road Km 00 to 14255 MT under NABARD RIDF XXIV SH Co 5 7 mtr wide Formation cutting Retaining wall Cross Drainage work GSBWMM MT U shape drain Parapets KM Stone and
C/o link road to Harizan Basti Amboa Km. 0/0 to 2/0 (SH. C/o balance work of Steps for Causeway Downstream side at RD 1/800, C/o 3.00 mtr span RCC slab Culvert at RD 1/650, Retaining wall and U-shape Drain)
C/ O link road Chilar to Gamberpul Manlogkalan road km 0/0 to 3/500 (SH ROFD at Km 0/500 to 1/00, 900 mm dia HPC at RD 0/500 and P/L Gr-I at Km 0/500 to 1/00) Under MNP
AR and MO Police Station Gagret to Industrial Area Shivbari km 0825 to 2685 link road to vill Kaloh km 000 to 4065 Ambota to Shivbari km 000 to 3300 and Thaplan to Badoh Workshop km 4000 to 5385 SH Repair of pot holes at various RDs
Restoration and repair due to laying of MDPE Natural Gas pipe line on link road from Una Ajouli road to Malookpur km.0.0 to 5.0 (SH C O cement concrete pavement at RD.1.285 to 1.675 Both sides and RD.2.685 to 3.180 one sides) ( BPCL deposit)
Construction of bridge over Ispur Khad at Km 0/075 on link road Petrol Pump Bhadsali to Una Hoshiarpur road to Pandoga Lower to Har sainian abadi from Km 0/0 to 3/00 SH Prepation of Hydraulic data and soil bearing capacity for construction of bridge
C/O Link road from NH-5 to Nabo Malling Km. 0/00 to 0/705 in District Kinnaur (HP) (SH- Formation cutting from Km. 0/530 to 0/705 and C/O R/wall in G.I. wire crate at RD. 0/090 to 0/125.
Restoration of rain damages (PDNA) on link road to village Pangi Km. 0/00 to 2/925 (SH- C/O R/Wall in PCC and G.I. wire crate at RD 1/203 to 1/215, 1/623 to 1/639 and 1/390 to 1/405
C/O of link road Village Diyara km 0/0 to 1/300. (SH Formation cutting and Providing and Laying G-II, G-III at Rd 0/710 to 1/300 and 30mm thick Bituminous concrete laying with paver finisher at RD 0/000 to 1/300)
Job 3 Construction of and M/T link road from Village Jankaur Pekhubela to Bhadouri up to Swan Nadi Tehsil and Distt. Una km. 0-0 to 0-800 Sub Head P.L Filling, GSB, U-shape drain in RD. 0-0 to 0-450 Under OTMNP
A/R and M/O to Link road to village Sakholi Km 0/0 to 3/800 under Missing culvert ( Construction of wing wall U/S and D/S side ( Sakholi side and Toe wall of 5x5 mtr. RCC Box cell culvert at RD 2/810)
Construction of link road from Moin to Gothana Km. 0/00 to 2/00 under SCCP. (SH- Formation cutting 5/7mtrs wide road in Km. 0/315 to 2/00 and C/o wire crate wall for dumping site at Rd 0/330 to 0/360).
Construction of R/Wall , Boundary wall on link road to khud km. 0/00 to 4/00 (SH - 5/7 mtr. Wide formation cutting at km. 0/330 to 0/405 and C/O R/wall and B/Wall at RD. 0/390 to 0/405)
M/T on link road from Dev Ka More to Harijan Basti Bobri Khodri Km 0/0 to 6/0 in District Sirmour HP ( SH- Providing and laying Base course G-II, G-III, P/L Metalling and Tarring in Km 0/0 to 3/0)
Construction of link road Nagnoli to Harijan Basti Chapparo Chotti Khad Gujjaran Tarkhana New Kholiwala Road km. 0-0 to 3-345 including construction of Bridge at RD 2-015 Sub Head Construction of 22.30 mtr. Span RCC Box Cell Bridge at RD 2-015 UNDE
Construction of Link road from Jole to Kainth via Choora Amroh Dharun Kuhroo Sanjhot road Km 00 to 14255 MT under NABARD RIDF XXIV SH Co 5 7 mtr wide Formation cutting Retaining wall Cross Drainage work GSBWMM MT U shape drain Parapets KM Stone and
C/O Link road Village Kajwa Km. 0/0 to 2/150 (SH P/L WBM G-ll, G-lll and M/T alongwith PCC road side drain in Km. 0/0 to 1/0 and 900mm dia hume pipe culvert at RD. 0/090,0/195)
Construction of link road from Moin to Gothana Km. 0/00 to 2/00 under SCCP. (SH- Formation cutting 5/7mtrs wide road in Km. 0/315 to 2/00 and C/o wire crate wall for dumping site at Rd 0/330 to 0/360).
Job 3 Balance work under Nabard-XXIII of Construction /strengthening of link road Dehlan to Dyalan mohalla and RTO Barrier to Jakhera Gameshah via abadi Arohi km. 0-0 to 5-500 Under Nabard Sub Head P.L WMM, cement concrete in km. 3-400 to 4-0
C/o link road from Sail to Kalwad Sajkhil km. 0/00 to 6/500 (Sh C/O RCC 6.00 mtr. Span Slab Culvert at RD. 2/750 with wing wall and 3.00 mtr span Slab Culvert at RD. 2/860 with wing wall) Under MNP
Restoration of rain damages on link road Amb to Athwan road km 000 to 2000 SH Const of Retaining wall at RD 1425 to 1466 both sides Breast wall at RD 1496 to 1506 LHS 1506 to 1520 with Ushape Vshape drain 1506 to 1549 both sides
Restoration of Rain Damages on Link Road from Dekhar to Naktara road KM 0.00 to 1.00 Co Rwall at RD 0.00 to 0.500 and Co Bwall at RD 0.005 to 0.015,HPC at RD 0.015 Hiring of Excavator PockLane Tipper for Carriage of Debries Muck etc
Job 5 Construction of link road Bangarh Panchayat to village Fatehwal Lawana Basti Mehatpur Handola road to Mehatpur Panchayat ward no.4 km. 0-00 to 0-460. under Una Constituency Sub Head P.L GSB, WMM and premix carpet with seal coat, C-O Retaining w
C/O link road from Loharli to Harizan Basti Mohalla Dharamshala in Gram Panchayat Loharli Km. 0/0 to 2/100 (SH. Construction of 2.75/5.00 mtr wide Jeepable road Cutting/Filling, GSB, WMM, Metalling and Tarring in Km. 0/300 to 1/000 and Retaining wal
Construction of Link road Pirsaluhi (Kangra) to Kitpal (Hamirpur) km 0/000 to 5/740 in District Kangra (HP)(SH Formation cutting, passing places,C/o R/walls, CD works, P/L GSB,WMM,tarring work,side drain and parapets, , road sign board, C/o 102.511 m
C o link road from Shashtwani Kainchi to H B Gartoon km 0 00 to 2 00 SH C o B wall in wire crate at RD 0 113 to 0 169 0 181 to 0 251 0 265 to 0 300 0 309 to 0 324
Construction of link road from House of Sh. Hardyal Ram RD 0/310 to Tuddu-Da- Lahar via Chamarkadi km 0/000 to 0/500 in Tehsil Dharamshala, Distt. Kangra H.P. SH - Formation cutting, providing and laying G.S.B. G-II, G-III and providing and layi
Job 2 A.R and M.O of Laluwal to Gondpur Road km.0-0 to 6-0 link road Gurplah to Gondpur Road km. 6-0 to 8-300 and Ajouli Santoshgarh Polian Road km. 3-700 to 7-700 Sub Head P.L Patch work in various RD
C.O LINK ROAD KOTLA AMROH ROADTO PATYAL BASTI IN GP AMROH TEHSIL JASWAN DISTT KANGRA HP UNDR INDUSTRIAL CORRIDOR SUBHEAD C.O EMBENKMENT INKM 0.290 TO 0.600 P.L G-I WIRE CRATE AT RD 0.290 TO 0.600 900MM DIA HUME PIPE CULVERT AT RD 0.345 AND C.O
Construction of link road from Dohgad to Khalair Km. 0/00 to 2/840. Under SCSP. (SH- Improvement of Formation deficiency between Km. 0/00 to 0/675, C.D. works, C/o R/walls at various Rds, Kharanja Stone soling in essential reaches, Parapets and un-li
Link Road from Tali to Bhalana km. 0/00 to 1/00 (SH 5/7 mtr. Formation cutting in km. 0/00 to 1/00 and C/O 900 MM Dia H.P.C. at RD. 0/465 and 0/780 with wing wall both side) Under MNP
Job 2 Periodical maintenance of Gondpur Baliwal road to Peerthan km. 0-0 to 1-0 Sub Head Patch work ,30mm thick bituminous concrete, zebra crossing and side line in km. 0-0 to 1-0 VR126 , Link road from Gondpur Baliwal road to Basti Naiyan
Const of link road Bhaira to Sathothar km 000 to 1800 SH Const of 8 meter RCC slab culvert at RD 1474 with approaches Const of Ushape drain at RD 1370 to 1425 and Const of Retaining wall at RD 2930 to 2953 RHS under MMGSY
Restoration and repair due to laying of MDPE Natural Gas pipe line on link road from Ajouli to Sanoli upto Punjab Boundary km.0.0 to 4.600 (SH CO CC pavement at RD.1.285 to 1.675 Both sides and RD.2.450 to 2.825 Both sides (BPCL deposit)
C/o M/able link road from Udeen Nallah to Hillu Towan Km 0/0 to 6/500 SH Construction of R/Wall at RD 4/100 to 4/205 and B/Wall at RD 4/100 to 4/175 and 4/230 to 4/260
Job 10 Periodical maintenance on link road Panjawar Bathri to Lower Saloh Bhadori via CO-OP Society road km.1-00 to 2-00 Sub Head Patch work , 30 mm thick bituminous concrete , Zebra, Crossing in km. 1-0 to 2-0 VR071 Under State Head
CO Link Road from Mehana Khad to Badhal Lehroti Katarla via Shoba Road to Paharia Basti Tanta Niwas Road Km 0.0 to 0.325 SH CO Formation defficiency at RD 0.0 to 0.325 B.Wall in wire create at RD 0.060 to 0.071,0.233 to 0.245,0.248 to 0/260
Job 3 Construction of and M.T of link road Lawana Basti Ispur, Ispur to Dera Baba Bharthri Damanian G.P. Ispur from km. 0-0 to km. 5-880 Sub Head Formation Cutting 5/7 mtr. Wide including Retaining wall, Breast wall and Toe wall, Cross drainage wo
Restoration of rain damages on link road Balugaloa Gheen Khabbal Kholi road Km 0/000 to 8/000 in Tehsil Baroh Distt Kangra (HP) (SH-Construction of Breast wall at RD 3/060 to 3/072 and U-shape drain at RD 3/060 to 3/095).
Job 7 Periodical maintenance on Panjawar Bathri to Subowana Baliwal road Km. 2-0 to 3-0 HP1203VR073 and link road from GSSS Palkwah to Pangoli Sudhre Mohalla to Swan Km. 0-0 to 1-0 HP1203VR166 . Sub Head P.L 30mm thick BC Under State Head.