Loading…
Loading…
10,887 results • Best match
C O link road Bhatkral to Grahan Km 0 00 to 2 00
C O link road Bhatkral to Grahan Km 0 00 to 2 00
C O link road Bhatkral to Grahan Km 0 00 to 2 00
C O Balance work of link road from Laran to Sarli Via Khalara
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/0
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 1/0
Restoration of rain damages on Sangtehar to Lashani road (GP Chheour) km 0/0 to 4/500 (SH- Re-construction of road Removal of slips at various Rds)
Construction of road leading below Petrol Pump to Tilak Raj House in ward No 28 (SH Construction of edge wall and Providing and Fixing M S pipe railing)
Restoration of rain damages on Dohra Nallah to Shillihar Chesta road Km 0/0 to 13/300(SH - Re-construction of road Removal of slips at various Rds) .
Restoration of rain damages on BadahPah Nallah to Shillihar (Rajgiri) road Km 0/0 to 19/700 (SH- Re-construction of road Removal of slips at various Rds) .
Construction of road/pucca path from Trilokpur road to new parposed plant M/s Varav Biogenesis (P) Ltd. Vill. Johron at Ind. Area kala Amb Distt. Sirmour (HP).
Restoration of rain damages on Baitu Age to KalizonKotlu Thana road Km 0/0 to 3/200 (SH- Re-construction of road Removal of slips at various Rds
Construction of Road from Veterinary Dispensary to Sargheen Km. 0/00 to 0/240 (SH Providing and Laying Cement Concrete Pavement in Km. 0/00 to 0/195
Construction of road from Kangar to Kandore in GP Rehan and Kandore km 0.0 to 1.0 Under SCDP SH Providing and laying tarring at RD 0.0 to 1.0
Construction of road from Mohanpur Naula to Kiar koti Km 0/000 to 2/00 (SH C/O 7 .00 mtr span small Bridge at Rd 0/030)
Restoration of rain damages on Lashani to Sangtehar road (GP Chheour) km 0/0 to 3/660 (SH- Re-construction of road Removal of slips at various Rds) .
Construction of road, road side drains, culvert, water supply, sewerage system, leveling of site and protection work to plot at Ind. Area Pandoga Teh. Haroli Distt. Una (HP).
Construction of road from Kodewala. (SH- Construction of 10.80 mtr span RCC Box Cell culvert over Nimbu ka Khala at RD 1/0 to 1/015) Under MNP.
Repair and development of site adjoining to Mushroom House for repair of plaster, sewerage line, toilets etc. damaged during the construction of road at ICAR-DMR Solan (H.P.)
E Tendering on turnkey basis for providing and laying tiles approach road roofing of SE Residence building under Electrical Division HPSEBL Solan
E Tendering of partial turnkey basis for Construction of Approach Road to Electrical Sub Division HPSEBL Dharampur under Electrical Division HPSEBL Parwanooo
Providing and laying 25mm thick B.C and road marking strips) Deposit work
M/R to residential and non-residential buildings of IIAS at RP Niwas Shimla during 2025-26.(SH: Repair of road, fencing near Observatory Cottage, repair of bathroom at Set no 2-3 of 18 family line and other related miscellneous works). ... (SH: Repair of road , ...
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 3/0
(SH- Providing and laying 30 MM Thick Bitumen Concrete laying with Paver Finisher , Road Marking Strips of hot applied Thermoplastic compound (Painting line) Between KM 1/00 TO 2/500)
Providing and laying Tack coat and Bituminous Concrete in Km 4/0 to 6/0
Providing and laying 30 mm thick bituminous concrete in km. 0/0 to 1/0 and 1/0 to 2/0
Geotechnical Investigation for safe bearing capacity
Providing and laying Metalling Tarring of helipad Thermoplastic and construction of earthen shoulder
Removal of slips at RD 0-0 to 0-800
Construction of Retaining wall at RD 0-660 to 0-690 under PDNA
C/o balance work of CHC building at Kupvi Tehsil Kupvi District Shimla HP
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 0/0 to 2/0) 2.00 km
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 5/000 to 6/000
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/000 to 1/140
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to 3/000
Providing and laying 30mm single layer bituminous concrete (HP0404VR012515301) km. 0/0 to 1/0
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to 3/000
SH- Providing and laying 30 mm thick Bituminous Concrete laying with Paver Finisher in km 1/000 to 1/410
Providing AND Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 3/000 to 3/700
(Sub Head- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km. 2/000 to 3/000)
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to 3/000
Providing and laying 30mm single layer bituminous concrete (HP0410VR019518101) km. 0/0 to 1/0 and Interlocking pavers at R.D. 0/850 to 0/950 including 50.00 mtr U-shape drain
Providing and laying built-up spray grout, bituminous concrete in Km. 0/000 to 1/000)
road Barring to Lomach, Othang, Yangthang Km. 0/00 to 9/240 (NDRF Sr. No. 13), link road to village Jhooling Km. 0/00 to 3/00 (NDRF Sr. No. 15), link road from Chembok to Lindoor Km. 0/00 to 7/105 (NDRF Sr. No. 20), link road to village Sindwari Km
Portion Bharari to Bandal Chowk PMGSY-II Batch-I 2019-20
on Dayol Lassani road at RD 0/394 under Regular PMGSY
CONSTRUCTION OF LINK ROAD FROM GHURNWAR TO SWANTA 0.0 TO 1.375 SUB HEAD C.O 5.7METER WIDE FORMATION CUTTING AT VARIOUS RDS C.O R.WALL AT RD 0.225 TO 0.233 0.360 TO 3.375 0.645TO 0.660 AND 0.740 TO 0.770 AND P.L GSB G-ii AT rD0.600 TO 0.900 AN
CONSTRUCTION OF LINK ROAD FROM BAGLI NH-503 TO HARIJAN BASTI MANDWARA VIA MANHAS VBASTI VAID BASTI KM 0.0 TO2.880 SH ROFD FROM RD 0.0 TO 0.430 C.O R.WALL AT RD 0.060 TO 0.070 AND 0.285 TO 0.320 CEMENT CONCRETE PAVEMENT AT RD 0.180 AND 0.225 M.T
SH Improvement of road by providing and laying interlocking paver block 80mm thick in portion 5/0