Loading…
Loading…
10,887 results • Best match
Improvement of road C/o R/wall in wire crate at Rd 3/880 to 3/995
CONSTRUTION OF AMBULANCE ROAD FROM KUNNU BAUDI TO CHANDI BAUDI (00 TO 50M) IN WARD NO. 04
SH Repair of Pot holes in km 000 to 2000 and 0000 to 0500 at various RDs Under MMSRRY 2025 26
Providing and laying Tack coat and Bituminous Concrete in Km 0/0 to 0/715
Construction of road and road side drain, R/walls, culverts and dressing of berms from Suketi road to M/S Protech Industries at I.A. Kala Amb, Distt. Sirmour (HP).
Re-construction of road with I/ paver blocks from Nation Highway to H/o Sh. Sukhdev Inspector Truck Union road in ward No-02, MC Mehatpur Basdehra,Distt. Una
Construction of Road from Bye-pass Dhalli to Inder Nagar Hill Top in ward No 20 Dhalli (SH Construction of Retaining wall between RD 0 090 to 0 105)
Re-Tender for Covering of sides of SBR Tank of STP 450 KLD and construction of road leading to STP upto Arnehar road at North Campus of IIT Mandi.
Construction of road Darati to Bharthadi Bridge (SH - Providing and laying G-II and CC Pavement at RD 0/00 to 0/150 alongwih edge wall to road (MMGSY)
Construction of Road to ward No.03 in GP Babehar Km Babehar KM 00 to 1000 SH Providing and laying CC pavement between Km 000 to 0200 under MMSY
Construction of road from Shihal to Madhopur GP road in Km 0/000 to 3/000 (SHF/C 5/7 mtr width in Km 0/300 to 1/330
Construction of road from Santoshgarh Swan bridge Left Bank to Gowthani Aquachem Private Limited Factory (SH Construction of Retaining walls embankment GSB at RD 0.0 to 0.375 (Deposit work)
Restoration of rain damages on Chharour Nallah to Tipri road (GP Danogi) Km 0/0 to 4/300 (SH- Re-construction of road Removal of slips at various Rds)
Construction of road from Kandari house to Kalpana Niwas Raboun Kailash Nagar Ward No.16 SH CC 1 2 4, Levelling cutting, grading, side steps Slab etc. Phase-II.
1 AMP on Galore Hamirpur road km 10/0 to 13/0 DRRP No. HP0306VR0003.
AMP for PMGSY for the year 2025-26 on link road to village Bharoli Kallan Km 0/0 to 3/0 (Bharoli Khurd to Bharoli Kallan) (SH-Providing and laying 25 mm thick Bituminious Concrete with using Waste plastic in KM 2/0 to 3/000 and P/L Hot applied Th
Providing and Laying bituminous concrete 30mm thick in km. 0/0 to 3/0,0/0 to 2/0,0/0 to 1/015,0/0 to 1/00,3/0 to 5/465,3/0 to 4/0,4/0 to 4/500,0/0 to 2/0 and 0/0 to 0/555 Respectively) DRRP No. HP-03-05 VR0087, VR0135, VR0006, VR0130, VR0125,VR0112,V
SH Repair of Pot holes in km 000 to 1585 000 to 1000 and 000 to 1000 at various RDs Under MMSRRY 2025 26
Construction of 38.10m span bridge over Pubowal Khad at RD 4/990 on link road from Administrative and Township block at Panjuana to Factory Gate of Bulk Drug Park at Kuthar Beet Km 0/00 to 7/370 in Distt.Una HP SH C/O 38.10m span bridge, R/wall
Job 1 Balance work of Construction of link road from Panjawar Bathri to Harijan Basti via Satsang Ghar Lalhri Sub Head Construction of CC pavement with edge wall at RD 0-0 to 0-150, 0-650 to 0-700 and earth filling, Providing and Laying GSB, WMM a
C.O LINK ROAD FROM SEUL KHAD TO SULYAH KM 0.0 TO 2.0 SUB HEAD C.O R.WALL AT RD 0.570 TO 0.60 P.L 900MM DIA HUME PIPE CULVERT AT RD 0.455 P.L CEMENT CONCRETE PAVEMENT AT RD 0.450 TO 0.510 AND P.L INTERLCOKING PAVER BLCOK AT RD 3.570 TO 0.760
Construction of Link road from Jole to Kainth via Choora Amroh Dharun Kuhroo Sanjhot road Km 00 to 14255 MT under NABARD RIDF XXIV SH Co 5 7 mtr wide Formation cutting Retaining wall Cross Drainage work GSB WMM M/T U shape drain Parapets KM Stone a
Construction of link road from Dadwal Helipad to Village Dadrana Haryala in Km. 0/00 to 3/500 (SH- C/o 900 mm dia Hume Pipe Culvert at RD 0/680, 0/750 and 2.00 mtr, 6.00 mtr RCC slab culvert at RD 0/890 and 0/990)
Balance work of construction of link road from Kathar to Khadvi upto Shoshan in Km. 0/00 to 8/475. (SH- Formation cutting 5/7 mtrs. wide road including essential R/Walls, B/walls, CD works, PCC Parapets etc. in Km. 0/00 to 8/475). Under NABARD RIDF-
C/O link road from Galu to Palgade Km 0/0 to 9/600 under NABARD(SH Formation cutting in KM 0/240 to 9/600, R/Walls,B/Walls,Hume pipe culvert,WBM G-I unlined drain,parapets,dumping site etc. in KM 0/0 to 9/600)
Job 9 Periodical maintenance Link road Ispur Lawana Majra VR0 87 RD.1-0 to 1-800 ii Panjawar Bathri road to upper Pandoga road VR0 85 RD.0-0 to 0-600 Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines Under State Head
Construction of link road from Balluwala to Khaddar G.P. Kanshipur Tehsil Paonta Sahib District Sirmour Km. 0/0 to 0/400. (SH- Providing and laying Granular sub- base (GSB), G-II and CC 1,4,8 and CC 1,2,4 at RD 0/0 to 0/250) Under MMSY Year 2024-25.
Construction of link road Gharat Khad to Malana upto Machimadhwani Km 0/000 to 2/000 SH Formation cutting 5/7 mtr wide road between Km 0/855 to 1/570 construction of Retaining wall at Various RDs and Construction of 900mm dia Hume pipe culvert at RD
C/O link road from village Sangna to Govt. Sen. Sec. School Sangna Satahan km. 0/00 to 4/00 (SH C/O Retaining wall in PCC at RD. 0/00 to 0/015,0/160 to 0/180 and B/wall at RD. 0/160 to 0/180) MNP
Job 4 Construction of link road GHS Behdala to khindrian WSS Tank Mohalla Palasrian km. 0-0 to 3-0 Sub Head Construction of C.C. Pavement at RD. 1-785 to 1-900 and 2-150 to 2-185, V-shape drain ,Retaining wall etc. Under OTMNP Head
Job 1 Restoration and repair link road to Ward No.1, Haroli. from Dola Mohalla Road km. 0-0 to 0-450 - G.P. Haroli Sub Head P.L GSB, WMM, Prime coat, Tack Coat, 30mm BC km. 0-0 to 0-45 and C.O Retaining wall length 20mtr. Deposit work
C/o link road from Galwa to Challella Km. 0/0 to 4/765 (SH- F/C, i/c Retaining wall, C.D. work GSB Mettaling Tarring, road side drain, Parapets and Km. stones etc. Km. 0/0 to 4/765, including Five years maintenance plan) under Nabard RIDF-XXVI
C/o link road from Dolra to bag Mehla Km. 0/0 to 3/810 (SH- Formation Cutting i/c R/walls, G.S.B. Metalling Tarring, road side drain, Parapets and Km. stones etc. Km. 0/0 to 3/810 including five year Maintenance Plan) Under Nabard RIDF-XXVIII
Construction of link road to village Harizan Basti Bag Aabda Km 0/0 to 3/750 in District Sirmour HP (SH- Formation cutting 5/7 Mtr wide road, Cross Drainage works and providing and laying soling in Km 0/0 to 3/750)(SW- onstruction of Retaining wa
Job 4 Construction of link road to Harijan Basti at Beetan RD 0-0 to 1-160 Sub Head C.O 900 mm dia Hume Pipe Culvert at RD 0-550, and RD 0-760, P.L GSB, WMM and Tarring in km. 0-350 to 1-160 Under SCCP
Job 3 Construction of Link Road Harizan Basti Jalgran to Mohalla Harizan upto Jagtar house Mohalla Sareda upto Tobba via Shamshanghat, Tehsil and Distt. Una km. 0-0 to 1-240 Sub Head P.L C.C. Pavement, Paver block, drain etc. in RD. 0-105 to 0-235 a
Restoration of rain damages on link road from Barana Mariayri Chowki Nehar Palahchaklu road Km 0/000 to 8/000 in Distt Kangra (HP) (SH-Balance work of wire crates at RDs 0/825 to 0/831.25, 0/833 to 0/839.25 and 0/841 to 0/853.50).
C/o link road Neri to Asha majari Km. 0/0 to 1/600 (SH- P/L Grade-I, C/o 900mm dia hume pipe culvert, Breast wall and retaining wall at various RDs 0/500 to 1/300 and M.T. work in Km. 0/0 to 1/300).
Job 4 Periodical Maintenance from Panjawar Bathri road to Village Sainsowal km. 0-0 to 2-170 VR 128, Link road Lalri to Dhilwan km. 0-500 to 1-0 VR. 169 Tehsil Haroli Distt. Una Sub Head Patch work, 30mm thick BC, Zebra crossing and side lines ,cat
Construction of link road from Mundla to Tikka Dhar to link village and Amtrar Km 2/900 to 5/660 including bridge over Joggal Khad at RD 3/056 in Distt Kangra (HP) (SH-Providing and laying wearing G-III and Tarring in Km 3/300 to 4/000).
C/O Link Road from Nilawas to Dhalet Road Km 0/0 to 1/00 (SH- P/L Gr.I in Km 0/500 to 1/00 , Gr.II , Premix carpet in Km 0/00 to 1/00 and C/O Breast/wall at RD 0/160 to 0/200)
C/o link road from village Ghori to Sayar from Km. 0/0 to 2/80 (SH- Formation cutting i/c R/Walls, G.S.B. Metalling Tarring, road side drain, Parapets and Km. stone etc. Km 0/0 to 2/800) including five year Maintenance Plan) Under Nabard RIDF-XXVIII
Construction of link road to village Nichala Gumarda Km 0/000 to 1/250 in Distt Kangra (HP) MMSY Head (SH-Construction of retaining wall in Km 0/850 to 0/860, providing and laying wearing G-III and cement concrete pavement in Km 0/850 to 0/965).
Periodical maintenance on link road Panjawar Bathri to Lower Saloh Bhadori via Co-operative Society road Km. 0/000 to 1/000 VR071 Panjawar Bathri to Rest House Haroli road km 0/00 to 1/300 VR072 SH P/L 25mm thick BC, side lines, cat eyes u
Construction of link road from village Melion to house of Smt. Shabnam in G.P. Melion, Sub Tehsil Majra District Sirmour H.P. (SH-C/O embankment with approved materials, C/o GSB 0/0 to 0/150 and edge wall from RD 0/125 to 0/144) Under MMGSY.
Construction of link road to village Oie Km 0/000 to 0/600 in Distt Kangra (HP) MMSY Head (SH-Construction of Edge wall in Km 0/000 to 0/006, providing and laying wearing G-III and cement concrete pavement in Km 0/000 to 0/125).
Job 1 Construction of link road Shiv Mandir to Malahat via Chattara Desi Mohalla via Basoli and Majra Una Hamirpur road toward No. 1 Moh. Bhrahmna to Harda Bala Bag lower Arniala Una Santoshgarh to Swan Bela via Bharolian 0-0 to 1-900 Sub Head C.O RC
Construction of link road from Bhungtial Paplah road Km 0/000 to 1/00 SH Construction of U shape drain at RD 0/000 to 0/081 both side and providing and laying GSB Grading II and Grading III at RD 0/000 to 0/150 Deposit work.
Const of link road Chil Kawali to Ghangret via Kabirpanthian Mohalla and Harijan Basti Ghangret km 000 to 3800 SH Const of 900mm dia RCC Hume pipe culvert at RD 0300 and 0470 and Const of Retaining wall at RD 0180 to 0192 0800 and Const of Breast
Annual Periodical Maintainance plan on link road from Koksar Bridge to Koksar village Km 0/0 to 2/00 (VR-029) for the year 2025-26 (Village road).(SH Providing and laying 20 mm Premix carpet including G-III and thermoplastic edge line in Km 1/0 to 2/