Loading…
Loading…
10,884 results • Best match
CO MT of link road from Dangoli Kuriala Nangal Salangri road to Baba Balak Rupi Mandir Lam Km 0000 to 0550 GP Jhamber SH PL 20mm thick Premix Carpet with seal coat in km 0350 to 0450 and CC Pavement in km 0450 to 0550
R R damages on Link road to village Sua deori shekhal rm 0 00 to 1 00 sh C O R wall at Rd 4 205 to 4 220 2 135 to 2 155 PCC 1 4 8 at RD 0 150 0 165
C/o link road from O.B.C basti Kotlu Brahmna to SC/ST Basti Kotlu Brahmna G.P. Kotlu Brahmna Tehsil Ghumarwin Distt.Bilaspur H.P. SH C/o R.C.C. H/pipe Culvert 900 mm dia at Rd 0/240 along with wing wall towards valley side over Nallah
Restoration of rain damages of link road Doon Sohni Devi road km 0/00 to 1/00 SH C/o U-shape drain at d 0/830 to 0/940 and R/wall at Rd 0/515 to 0/523 Under PDNA Year 2023
Construction of link road Bhorni to harijan Basti Masandakar via Chamargali in Gram panchayat Mumta in Distt Kangra (HP) MMSY Head(SH-Providing and laying grading-III and cement concrete pavement in Km 0/400 to 0/530 and 0/400 to 0/530).
Construction of link road Dangar Malehri Bhadsi road km 0/00 to 2/500 SH Construction of Embankment , Stone Soling Cement concrete work in 1.1.5.3 km 2/100 to 2/210 and C/o P.C.C. R/wall AND B/wall at various RD Under MMSY
C/o link road from Kaloha to Kakad Bhadd Harizan Basti (SH C/o Breast wall at Rd 0/760 to 0/819, V-shape drain at Rd, 0/640 to 0/855 and C.C. pavement at Rd. 00/675 to 0/783) under MMSY.
Construction of link road from Jaon to Oddidhar Km. 0 00 to 2 900 . SH Balance work of Formation Cutting 5 7 mtrs wide road including R walls B wall CD works unlined surface in Km. 0 00 to 2 900. Under RIDF XXIV
Formation cutting, Passing Places, R/walls, Cross drainage works, GSB, WBM G-II, WBM G-III, Tarring work, Cement concrete pavement, Road side drain and Parapets including five years routine maintenance in Km 0/0 to 6/580). (Under NABARD RIDF-XXIX).
C/O Balance work of 6.00 mtr. span RCC slab culvert at RD 0/615
(F/C 5/7 mtrs wide road at RD 0/170 to 0/400
Providing and laying tack coat and 25mm thick bituminous concrete in km. 0/0 to 1/0
Improvement of Blackspot on Rodi Gaila Gatyanu Road Construction of Retaining wall at RD 0/400 to 0/420
Providing and laying bituminous concrete in Km. 0/0 to 2/330) Under Non PMGYS Rural road.
Providing and laying bituminous concrete in Km. 3/0 to 6/700) Under Non PMGYS Rural road
Construction of Link road from Koti to Padhechi Km 0/000 to 7/135 and Link road from Koti to Mundaghat via Moj Jubber Km 0/000 to 5/435
Sub Head- Construction of Buildings (Flatted Factories, Warehouses and Admin. Block/ Convention Center), Construction of Road and Road side Drains and Culverts).
SH C O R/Wall at Rd. 0.510 to 0.530 , widening of road at Rd. 0.300 to 0400 Kharanja stone soling at Rd. 0.300 to 0.540
Construction of Shakelar to Mahog via Navidhar road Km. 0/000 to 10/500 (Sub Head Widening of road in Km. 7/900 to 10/345).
AR and MO link road from Ayurvedic Dispansary to GHS Burwa Km.
Improvement of road from ropar road to Radiali Shiv mandir NH 105, Balance work of road from Parkash Dhaba to Reru km 0/500 to 1/00 mtr, C/o new road from near Solid Waste Plant Dabhota to vllage Majra via SC and Rajput Vass km 0/0 to 1/0.
(SH-Construction of 5/7 mtrs. Wide road, construction of retaining walls/breast wall with cement concrete and wire crates, providing 900 mm dia R.C.C. hume pipe culvert and R.C.C. slab culvert of different sizes, providing Granular sub base, WBM Grad
Removal of slips Surface dressing unlined surface drain respectively ) ( D.C. Deposit
Deposit work BSP 2024 473 Construction of link road from main road to village upper Beri along with P.R. wall in Tehsil Sandhole Distt. Mandi HP Construction of R wall along with path to protect the path and also soil erosion measures RD0.00 to0.013
C/o link road Ballu to Bani km. 0/00 to 1/350 SH C/o Hume pipe culvert 900mm dia at R.D 0/348,600mm dia at R.D 0/935 and R/wall RD 0/139 to 0/154,0/555 to 0/582 under SCCP
Providing and laying 25mm thick Mix Seal Surfacing in km 0/0 to 1/0 1/500 to 2/100 1.600 km)
Providing and Laying 30 mm thick Bituminous Concrete in km. 5/0 to 6/0
(Sub Head - Providing and laying built-up spray grout, Take Coat, Bitumenious Concrete 30mm thick and Thermoplastic Strip in Km. 0/000 to 1/000)
SH Providing and laying 25mm thick Mix Seal Surfacing in km 0/0 to 2/020 2.020 km
Providing and laying built-up spray grout, bituminous concrete in Km.0/00 to 1/000
(Sub Head- Providing and laying built-up spray grout, Take Coat, Bituminous Concrete 30mm thick and Thermoplastic Strip in Km. 0/000 to 1/500)
Providing and laying built-up spray grout, bituminous concrete in Km. 0/00 to 1/650 and 1/700 to 2/000 and CC Pavement at km 1/650 to 1/700)
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 1/500 to 2/0 ) 0.500 km
(SH Providing and Laying 30 mm thick Bituminous Concrete in Km 0/0 to 1/510 ) 1.510 km
Providing and laying built-up spray grout, bituminous concrete in Km. 0/000 to 1/000)
Providing and laying built up spray grout layer for pot holes, 30mm thick bituminous concrete in km 1/00 to 1/500
Construction of PCC Retaining wall at R.D. 0/0 to 0/025
SH P L interlocking concrete block in K M 0 0 to 0 115
Construction of Retaining wall at RD.0/160 to 0/180).(Under PDNA).
Providing and laying renewal coat between km 0/0 to 0/500 , G-III, Bituminous macadam and essential V-Shap side drain for correction
M/T in K.M. 0/00 to 1/212
Construction of Retaining wall at RD 0-100 to 0-120 under PDNA
Providing and laying Open-Graded Premix Carpet of 20 mm thickness at km 0.00 to 1.500
S.H P L G-III, Bm and BC k.m. at R.D. 0.0 ton 0.135
Providing and Laying 25mm thick BC in Km 0/00 to 0/150
Construction of PCC Toe wall alongwith Construction of Retaining wall at RD 0-380 to 0-400 under PDNA
Construction of Link Road from NH-503 to Ghartheru via Baba Tilla up to Bagli km 00 to 5.500portion km 1.300 to 3.500SUB HEAD Formation Cutting C.o Retaining Wall 900 mm Dia Hume pipe culvert CC pavement PCC Drain P.L GSB and Metalling and Tarring fr
Providing and laying 25 mm thick bituminous concrete under PMGSY
including five-year maintenance under PMGSY-III PackageNo.HP10290 FDR Technology