Loading…
Loading…
10,898 results • Best match
(SH- F/C 5/7mtr wide road at RD 0/0 to 1/525)
SH C/o R/Wall at R.D. 2/380 to 2/425
C/O PCC R/Wall at Rd 0/190 to 0/205 and 0/255 to 0/264
Repair of pot holes at various RDs between Km 0/0 to 1/500
SH C/o ROFD in km 0/0 to 0/540 and CD work
C/o 10.00mtr. Span Bridge with Approaches at RD 0/045
SH Improvement of curves and construction retaining wall and B-wall and wire crate
P/L wet mix macadam in patches and 30mm thick bituminous concrete in kms 2/0 to 3/0 including 80mm thick ISI marked paver block.
Formation Cutting 5/7 mtr wide road in Km 0/000 to 0/825 C/O PCC R/Wall at Rd 0/0 to 0/025 0/190 to 0/205 0/475 to 0/490 0/655 to 0/670
Formation Cutting 5/7 mtrs wide road in Km 0/0 to 0/895 to 1/600)Under MMGSY
C/o double hume pipe culvert 900mm dia at RD 3/995 to 4/005 and unlined drain at Various RDs.
P/L C.c. Pavement at RD 0/400 to 0/900 and U- Shape Drain at RD 0/00 to 0/500
SH Formation Cutting 5/7 mtr wide road RD 2/615 to 3/165
Protection works, Cross Drainage Works, Mettalling and tarring , Parapet, V Shape Drain, crash barrier, Road Furniture RD 0/00 to 8/00
C/O PCC R/Wall at Rd 2/780 to 2/819
C/o 6.00mtr Span slab culvert at RD 0/655
SH ROFD Cross drainage work GSB WBM GII GIII Tarring Paver block Road Side VShape drain Parapets and sign board and KM stone ic 5 years of routine maintenance Under NABARD RIDF XXVIII
(SH- Construction of 6mtr slab culvert at RD 3/480 with wing wall)
SH Formation Cutting Retaining Structures Cross drainage Paver blocks VShape Side drain Road Side drain Road Side essential Parapets Road Signages and Dumping Sites in Km 0/0 to 5/205 under NABARD RIDF XXXI i/c 5 years maintenance
FC 5 7 mtr wide road at Rd. 1.600 to 2.200
C/o 900mm dia HPC at RD 0/310, 0/430,0/610 ,0/870,1/210 and 1/370) Targeted
C/O R/wall at Rd 0/250 and V shape drain km 0/00 to 0/210 and Cause way at RD 0/190.)
C/o, R/Wall at R.D. 0/065.8 to 0/075.3
P/L GSB, M/T, Cement concrete pavement , U-Shape V-Shape drain in Km 0/00 to 1/350 (under MMGSY)
SH Construction of 5/7 mtr. wide road formation cutting in km 1/050 to 1/375 Demolition of C C pavement at RD 0/895 to 0/900 and 0/900 to 1/030 C/O retaining wall at RD 1/270 to 1/435 with crash barrier C/O v-shape drain at RD 0/860 to 1/030
C/o R/wall at RD 1/260 to 1/310
C/O U-shape drain with edge wall in kms 1/130 to 1/360.
Construction of Retaining wall at R.D. 0/150 to 0/180
5/7 mtr. Wide formation cutting in Km. 1/00 to 1/705) Under SCSP
SH F/C 5/7 mtr. Wide road at RD 0/930 to 1/075
SH Removal of formation deficiency in km 0/0 to 0/500 and Cross Drainage work in km 0/025 to 0/185
Formation cutting, Retaining wall, Breast wall, Cross drianage , Metalling tarring, CC Pavement , PCC drain, Parapets , Crash barrier and road furniture including five year maintenance) under NABARD RIDF XXVII
Sub Head Formation, Cutting, Rwall, Brest wall, Cross drainage, metalling and taring,CC block, PCC drain, parapets and road furniture including five year maintenance) under NABARD RIDF XXIX
(Sub Head - Providing and laying wearing grade-II and cement concrete pavement from km. 0/150 to 0/250 and 0/345 to 0/470)
P/L GSB, G-II, Metalling Tarring at RD 0/0 to 0/500 and CC pavement at RD 0/500 to 0/700)OTMNP
SH c/o 6.00 meter span culvert at RD. 1/000)under MNP
SH- formation cutting Jeepable standard Km 0-0 to 0-600 and construction of wire crate for dumping site
C/O 1 No. Spur aty RD. 0/480
SH Construction of Hume pipe culvert at RD 0/150, 0/200, 0/290, 0/380, Edge wall at RD 0/250 to 0/280 0/292 to 0/345 0/350 to 0/400 0/410 to 0/440 and Providing and laying GSB in km 0/045 to 0/400 Under SCSP Head
ROFD in Km 1/210 to 1/495, P/L 900mm dia RCC Hume pipe culvert at Rd 0/775 1/030 P/L GSB, MT in Km 0/525 to 1/050) ( Job No-2) (under MMGSY)
Providing and Laying of GSB, G-II, G-III, 20 mm M.S.S in K.M. 0/00 to 0/720
Providing and laying G-I G-II and Bituminous concrete in km. 0/000 to 0/750
Providing and laying G-II,SS I and 25 mm thick Bituminous Concrete in between km. 6/00 to 8/00 and 9/00 to 10/00) Village Road
SH Construction of 2 mtr RCC slab culvert at RD 0/395 P/L GSB Roller compacted concrete pavement at RD 0/392 to 0/480 and cement concrete edge wall Under OTMNP Head
C/O R/ Wall and Crate work at RD. 0/480 to 0/495
Preparation of Technical Sanction, Working Estimate and DNIT
Construction of P.C.C R/Walls at RD 2/555 to 2/570, 2/740 to 2/750 and 2/845 to 2/855 and Causeway at RD 1/615 to 1/640)
ROFD, Wire Crate Wall, V-Shape Drain and P/L Cement Concrete Pavement from KM 0/120 to 0/285 and 1/200 to 1/500 under SCSP
P/L C.C.Pavement at RD 0/400 to 0/500, PCC Drain with Edge wall at RD 0/500 to 1/000 and C/o 900mm HPC at RD 0/200 and 0/400
Construction of drain and hume pipe culvert at Km. 2/710 and Retaining wall at Km 2/860 to 2/869) under PDNA