Loading…
Loading…
10,901 results • Best match
(SH- Extension of Hume pipe culvert with catchpit and Toe wall, culvert approaches at RD 1/500 and R/Wall 1/615 to 1620(Deposit work)
SH C/O R/Wall at RD 1/025 to 1/037
C/o PCC R/wall at RD 0/390 to 0/405 and PCC U-shape drain at RD 0/400 with grating ) Deposit work
P/L Metalling and Tarring works bw at RD 1/310 to 1/570 and 2/0 to 2/650). SCSP
Providing and laying Bituminous Macadem at various RDs.
Metalling/Tarring works at RD 0/00 to 0/600
Providing and laing GSB, G-II, G-III and premix carpet in Km. 0/495 to 0/630 and 0/655 to 0/730
P/L Cement Concrete Pavement from Km. 0/000 to 0/30
C/O PCC R/wall at RD 1/200 to 1/220).
Formation cutting in km 0/0 to 0/720
(SH- Removal of formation deficiency from Km 1/720 to 2/720) Under Deposit
SH C/O R/Wall at RD 0/00 to 0/022 and C/O 900 mm dia HPC at RD 0/195 , 0/480,0/975, 2/00 with 4.00 mtr both side wing wall
C/O R/wall/ Edge wall at Rd. 0/105 to 0/150, 0/230 to 0/250) (Under PDNA) Cost of Form Rs. 350/- Time Limit Two month Job No.8
P/L CC Pavement at RD 0/00 to 0/100, P/L GSB M/T in km 1/450 to 2/00). (under MMGSY)
Interlocking Paver Block and Pavement at RD. 0/0 to 0/270
(SH Formation cutting in Km. 1/735 to1/585).
SH C/O Crated R/wall and B/Wall at various Rd. 1/900 to 2/500)
SH Repair of Crust Construction of Retaining wall in PCC and Crate at various RDs Under PDNA-2023
Providing and laying WBM G-III and Tarring at RD. 1/00 to 2/00. (under SCDP)
Repair of Pot Hole / patch work between Km 0/00 to 1/000) (MMSRRY)
SH CO Rwall at RD 1 930 to 1 942
Construction of R/wall at RDs 2/868.80 to 2/871.80, 2/871.80 to 2/881.80 and 2/890.60 to 2/895.60)
SH C/O R/wall at Rd 3/862 to 3/880 and C/O B/wall at Rd 0/030 to 0/045
(SH- C/O Hume Pipe culvert 900mm Dia at RD 0/450 with approaches both side)
Construction of PCC Breast wall and one layer crate above CC B/wall at RD. 0/040 to 0/060
Formation Deficency, Formation cutting, R/walls, B/walls, C.D works and C.C. pavement etc.) Under NABARD RIDF XXVI.
SH C/O R/Wall at RD 0/129 to 0/143 and 0/343 to 0/356 and P/L Kharanja Stone Soling at Various slushy reaches between km 0/00 to 0/700
C/o 5/7 mtr wide formation cutting at RD 3/00 to 1/500) Under MMGSY
(SH- C/O Hume Pipe Culvert 900mm Dia at RD 0/258 with approaches both side)
SH Const 900 mm dia Hume pipe culvert with wing wall and R/wall , B/wall in wire crate in Km 0/445 to 1/570
SH Providing and Laying Kharanja Stone Soling between km 0/000 to 3/800 and Construction of 900mm dia HPC at RD 2/900 with 3.00 mtr both side wing wall
Sh Contruction of R/wall at Rd 0/138 to 0/158 , 0/325 to 0/350 and 0/435 to 0/447.50
Providing and laying interlocking Concrete Block Pavement on Jeoli Dvi to Sehli Bhaber Karsai Joure Amb road at RD 3/835 to 3/865 , 4/225 to 4/275 , 4/345 to 4/365 , 4/390 to 4/425 , 5/175 to 5/230 and7/870 to 7/900 and Khorpa Biar road at vario
(Sh - P/Laying 30mm thick bituminous concrete in Km.0/00 to 1/500)
(SH - P/L 30mm thick bituminous concrete in km.0/0 to 1/0
(SH- P/L 30mm thick bituminous concrete pavement)
Providing and laying 30 mm thick Bituminous Concrete with Paver Finisher on Km. 2/500 to 3/00
Providing and laying 30 mm thick Bituminous Concrete with Paver Finisher on Km. 1/00 to 2/00 and 2/00 to 2/600
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 0/800 to 1/500)
Providing and laying built-up spray grout, bituminous concrete in Km.1/0 to 2/50)
Providing and laying 30 mm thick bituminous concrete in km. 4/0 to 5/0 and 5/0 to 6/0
Providing and laying built-up spray grout, bituminous concrete in Km.0/0 to 1/0
Providing and laying wearing grade-II for profile correction, built-up spray grout and bituminous concrete in Km. 2/0 to 3/0)
Providing and laying built-up spray grout, bituminous concrete in Km. 2/0 to 3/0).
Providing and Laying G-II, Tack Coat primer coat and 30 mm thick Bituminous concrete at Km 2/300 to 3/300)
Providing and laying 30mm single layer bituminous concrete (HP0404VR007215201) km.0/000 to 2/330
Providing and laying built-up spray grout, bituminous concrete in Km. 0/0 to 1/0)
Providing and Laying Built up spray GroutSingle layer, Tack Coat and 30 mm thick Bituminous concrete at Km 2/00 to 3/00
Providing and laying 30mm thick Bitumenous concrete in km. 0/0 to 1/0 including 100 Metre Side Drain in essential reach
Providing and laying 30mm thick Bituminous Concrete with Paver Finisher on Km 0/000 to 1/000