Formation cutting, Retaining Structure Cross drainage work Granular Sub-Base, WMM Metalling and Tarring, Shoulders V shape side drain Road side essential parapets Road Signages
SH P.L WBM G.III and 30 mm thick bituminous concrete surfacing in Km 0.000 to 0.435
SH Const of VShape drain at RD 300 to 3/200 3205 to 3310 3340 to 3610 4510 to 4690 RHS and 3240 to 3510 LHS
FORMATION CUTTING IN KM. 1/300 TO 1/700, R/WALL/ W/BALL AT VARIOUS RDS, P/L CEMENT CONCRETE PAVEMENT AT RD. 1/400 TO 1/410, G.S.B, W.M.M and P/L TARRING IN KM. 1/300 TO 1/400, 1/410 TO 1/700 and P/L 900MM DIA R.C.C. HUME PIPE CULVERT AT RD. 1/4
Formation Cutting 5/7 mtr. Wide road in km 10/555 to 11/090.
SH Construction 5/7 metre wide road formation cutting in km 0/0 to 0/750 and construction of retaining wall at RD 0/020 to 0/070 0/070 to 0/085 and 0/245 to 0/280
(SH- F/C 5/7mtr wide road at RD 0/0 to 0/570)
Formation Cutting, Passing places, R/walls, C.D. work, GSB, WBM-II, WBM-III, tarring work, CC Pavement, side drain and parapets) (Under NABARD RIDF-XXVI)
P/L C.C. Pavement in km. 0/295 to 0/420
P/L Cement concrete pavement at Rd. 0/0 to 0/064) ( D.C. Deposit)
SH Providing and Laying GSB, wearing coat G-II and Tarring works in km 0/0 to 0/500
(SH C/o B/Wall at Rd. 0/0 to 0/500, 0/610 to 0/625, 0/640 to 0/655)
SH Metalling/Tarring on RD 0/0 to 0/410
P/L Wearing coat G- 2 and Tarring work in Km 0/500 to 0/960
C/O Cement concrete pavement at RD 2/900 to 3/050) OTMNP
Construction of PCC Retaining walls at R.D. 0/540 to 0/590 (Between R.D. 0/540 to 0/765)
SH Providing and laying WMM 2cm thick premix carpet surfacing with seal coat in Km 0/0 to 0/650
ROFD in between 0/0 to 0/500, C/O R/wall at various rds. in between 0/0 to 0/500 P/L soling in km. 0/0 to 0/500
(Sh- P/l 30mm. thick bituminous concrete in Km. 0/00 to 1/00 and v-shape drain with E/wall RD 0/00 To 0/100)
C/o 6.00 meter Span Slab Culvert at RD 2/450
SH Formation cutting including Retaining wall cross drainage work cement concrete pavement GSB WMM Metalling Tarring and V shape drain etc including five years maintenance under NABARD XXVI
C/o 5/7mtr wide formation cutting from RD 2/555 to 2/585(Under OTMNP
Providing and laying 20mm thick premix carpet.
SH P/L 80 mm thick interlocking concrete block Pavement at Various RDs
Construction of crate work Retaining walls at R.D. 1/150 to 1/170, 1/180 to 1/197.10 and 3/115 to 3/125 (Between R.D. 1/150 to 1/170, 1/180 to 1/200 and 3/115 to 3/125)
F/C 5/7 mtr. Wide,R/walls, breast walls, Meetalling Tarring, Cross drainage, V-shape drain, Parapets, Dumping site, Stone in Km. 0/00 to 4/515) (RIDF-XXIX) (UNDER NABARD) (Including 5 years of routine maintenance)
Providing and laying GSB, WMM-II and 2cm. Thick premix carpet with seal coat in km. 0/0 to 0/760
Repair of pot holes and Patch work at various location
SH- C-O U-shape drain in km. 1-260 to 2-025 and 2-070 to 2-205, P-L Soling, Wearing G-II in km. 1-700 to 2-205 and WBM G-III in km. 1-00 to 2-205
Providing and laying G II, GIII at Km 0/400 to 0/543 and Construction of Retaining wall at various locatiuon(MPLADS)
C/O 5/7mtr. Wide F/C, C/O R/Walls and cross drainage works in km. 3/360 to 3/855
ROFD in km 0/00 to 1/510, C/o 4.00 mtrs span RCC culvert at Rd 0/345, C/O 900mm dia RCC Hume Pipe culvert at RD 0/655, 0/900
(SH- Construction of 12.00mtr. Span type culvert at RD 0/010 with wing wall both side)(Under OTMNP)
F/C in km. 0/00 to 2/00 , C.D. work at RDs 0/015, 0/870, 1/210 and 1/750, G.I in km. 0/00 to 2/00, C/o R/wall and wire crates at various Rds and unline surface drain km. 0/00 to 2/00)
Providing and Laying WBM G-II,G-III and Tarring in km. 0/00 to 1/500 and C/o V shape drain in km. 0/00 to 0/500)
P/L M/T in km. 1/500 to 2/500 Under SCSP Head
Providing and laying Cement concrete pavement in slushy reaches at various RDs
C/O Hume Pipe Culvert at Rd 0/125, 0/335 0/595 0/985
P/L 900mm dia RCC Hume pipe culvert at Rd 0/100, 0/350, 0/520, R/wall at Rd 0/070 to 0/085, Wire Crate R/wall at various RDs P/L cement concrete pavement at RD 0/00 TO 0/100 0/350 to 0/450)
P/L cement concrete pavement at Rd 0/00 to 0/050)
Construction of V-shape drain at RD 0/135 to 1/165 and 1/570 to 1/600 and 1/765 to 1/945) (Under PDNA)
Construction of Edge/Protection wall for existing shed length 25.00 mtrs) under Depsoit SID-BSP/2022/858
C/O Hume pipe culvert at RD 0/180
(SH- widening of 5/7 meters wide road, including retaining walls, providing cross drainage works, metalling and tarring, interlocking paver blocks, construction of U-shape side drains, construction of parapets and providing road furniture etc. in km
Providing and Laying 30 mm thick Bitumen Concrete with Paver finisher in Km 2/000 to3/000
Construction of Cement Concrete Pavement at RD. 0/0 to 0/650
Providing and laying Kharanja stone soling and cement concrete pavement from Km. 0/140 to 0/175).
Construction of PCC and wire crated Retaining walls at R.D. 0/275 to 0/285 (Between R.D. 0/200 to 0/350) 0/630 to 0/640, 0/705 to 0/725, 0/860 to 0/870 (Between R.D. 0/615 to 0/870)
Construction of retaining wall in wire create at km. 0/405 to 0/430 under Head repair and maintenance of road under SCSP).
P/L Pot hole, Bitumen Concrete and 2.5 mm thick road marking strips in km 0/00 to 0/340